GOVERNMENT OF ODISHA DEPARTMENT OF WATER RESOURCES ANNUAL REPORT 2015-16 Prepared By ANGUL IRRIGATION DIVISION ANGUL

[-] Angul Irrigation Division, Angul

  • Upload
    hatu

  • View
    261

  • Download
    7

Embed Size (px)

Citation preview

Page 1: [-] Angul Irrigation Division, Angul

GOVERNMENT OF ODISHA

DEPARTMENT OF WATER RESOURCES

A N N U A L R E P O R T 2015-16

Prepared By

ANGUL IRRIGATION DIVISION ANGUL

Page 2: [-] Angul Irrigation Division, Angul

CONTENTS

Sl. No. Name Page No. 1 Introduction 2 2 Staff Position 3 3 Work Area 4 4 Activities 16 5 Other Activities 17 6 Status of Court Cases 17 7 Important Contact Details 17

8 Annexure – A: Jurisdiction Map of Angul Irrigation Division, Angul

18

9 Annexure – B: Index Map of Derjang Irrigation Project 19 10 Annexure – C: Index Map of Aunli Irrigation Project 20 11 Annexure – D: Index Map of Dadaraghati Irrigation Project 21 12 Annexure – E: Index Map of Ramiala Irrigation Project 22

13 Annexure – F shows the Index Map of Sapua Irrigation Project

23

14 Annexure – G: Index Map of Flood Embankments in Angul District

24

15 Annexure – H: Index Map of Flood Embankments in Dhenkanal District

25

16 Annexure - I: List of projects under different schemes under the control of C.E. & B.M., BRB, Dhenkanal in favour of Angul Irrigation Division

26

17 Annexure- J: Status of projects under DRIP 37

18 Annexure- K: List of projects under the control of C.E. & BM, LMB, Bhubaneswar 38

19 Annexure – L: Progress Report of Industrial Water Rate for the year 2015-16 in favour of Angul Irrigation Division

44

20 Annexure – M: List of pending Court Cases of Angul Irrigation Division 46

1| Page

Page 3: [-] Angul Irrigation Division, Angul

1. INTRODUCTION Angul Irrigation Division, Angul was established during 1964 for Survey & Investigation and

construction of new Irrigation Projects including their maintenance along with flood control works in

undivided Dhenkanal District under administrative control of Superintending Engineer, Northern

Irrigation Circle, Salapada. At that time construction of Derjang Irrigation Project was in preliminary

stage. Afterwards Dadaraghati and Aunli Irrigation projects were constructed under this Division. In

due course of time the works of the then Ramial Canal Division and Sapua Badajore Irrigation

Division, Satmile were handed over to this Division. Now this Division comprising of five Nos. of

Sub-Division functioning under administrative control of the Superintending Engineer, Angul

Irrigation Circle, Angul and Chief Engineer & Basin Manager, Brahmani Right Basin, Dhenkanal

(now comes under the control of Chief Engineer & Basin Manager, Brahmani Basin, Samal vide

notification no. 15465/ dated 01.07.2016 of DOWR, Govt. of Odisha). (Annexure – A shows the

Jurisdiction Map of Angul Irrigation Division, Angul).

So, there are five existing completed Irrigation Projects namely Derjang Irrigation Project,

Aunli Irrigation Project in Angul District and Ramial Irrigation Project, Dadaraghati Irrigation

Project and Sapua Badjore Irrigation Project in Dhenkanal District under this Division. Derjang,

Ramial, Dadaraghati & Sapua Irrigation Projects are reservoir schemes whereas Aunli Irrigation

Project is a Diversion Weir scheme. Derjang Irrigation Project including 2nd stage has certified

Khariff ayacut of 7392Ha. and Rabi ayacut of 1824 Ha., Aunli Irrigation Project has designed

certified Khariff ayacut of 1746 Ha. & Rabi ayacut of 500 Ha, Ramial Irrigation Project has

designed certified Khariff ayacut of 6128 Ha. and Rabi ayacut of 3200 Ha., Dadaraghati Irrigation

Project has designed certified Khariff ayacut of 4120 Ha. with Rabi ayacut of 1650 Ha. Similarly

Sapua Badjore Irrigation Project has designed certified ayacut area of 2469 Ha. with Rabi ayacut of

350Ha. The Canal systems of Derjang Irrigation Project, Aunli Irrigation Project & Dadaraghati

Irrigation Project have been modernized under O.W.R.C.P. Scheme. Some renovation works in canal

system of Ramial Irrigation Project was taken up with NABARD assistance under RIDF-V. Total 53

Nos. of Pani Panchayat have been formed and functioning successfully in ayacut area of the above

five Nos. of projects.

Besides to Operation & Maintenance of above five nos. of Medium Irrigation Project, this

Division is looking after the flood embankment of river Ramial, Brahmani (upto boarder of

Dhenkanal and Jajpur District) Samakoi, Nadira, Aunli, Kumbharia Nallah, Tikira and Mahanadi

(Athamallik portion i.e. Down Stream of Kiakata Bridge in the Dhenkanal and Angul District. There

are 65.496km of Marginal Flood Embankment, 19.91km of O.A. Embankment, 12.41km of Test

2| Page

Page 4: [-] Angul Irrigation Division, Angul

Relief Embankment and 1.54km of Masonry wall on both side of river Ramial, Brahmani, Samakoi

and Mohanadi. The embankments are not continuous but in piece mill basis.

Further, now a days this Division is also collecting Industrial water tax from various

industries set up inside Angul District.

2. STAFF POSITION

Details of Staff position under establishment of Angul Irrigation Division, Angul is as

follows.

Sl. No.

Designation of Post Sanctioned strength

No. of posts filled up

No. of posts lying vacant

1 Executive Engineer 1 No. 1No. Nil 2 Deputy Executive Engineer 2 Nos. Nil 2 Nos. 3 Assistant Executive Engineer 3 Nos. 3 Nos. Nil

4 Assistant Executive Engineer (Estimator) 1 No. 1 No. Nil

5 Assistant Engineer 9 Nos. 9 Nos. Nil 6 Assistant Engineer (Estimator) 1 No. 1No. Nil 7 Junior Engineer 11 Nos. 10 Nos. 1 No. 8 Junior Engineer (Estimator) 1 No. 1 No. Nil 9 Divisional Accountant 1 No. 1No. Nil

10 Head Clerk 1 No. Nil 1No.

11 Senior Clerk 2 Nos. 1 No. 1 No. 12 Junior Clerk 9 Nos. 7 Nos. 2 Nos. 13 Junior Stenographer 1 No. 1 No. Nil 14 Draughtsman 1 No. 1 No. Nil 15 Tracer 1 No. Nil 1 No. 16 Peon / Orderly 12 Nos. 12 Nos. Nil 17 Night Watchman-cum-Sweeper 5 Nos. 4 Nos. 1 No.

3| Page

Page 5: [-] Angul Irrigation Division, Angul

3. WORK AREA

(i) DERJANG IRRIGATION PROJECT

The Derjang Irrigation Project, a reservoir scheme and the first medium irrigation project

of Orissa after India’s independence was started in the year 1960 in the Angul Sub-Division of

undivided Dhenkanal district across the twin rivers Matallia and Lingara, right tributaries of river

Brahmani. The project is situated at latitude 200-51’-0”N and longitude 850-21’-0” E near village

Majhika near Angul town. The dam is 15 km away from Angul town, the district head quarter of

Angul district. It is approachable via NH -55 as wel as Angul- Deogah State Highway.

(Annexure – B shows the Index Map of Derjang Irrigation Project).

The project intercepts a catchments area of 399 Sq. Km. The project was completed

during the year 1977-78. This project has been providing irrigation water to an area of 7392Ha. in

Khariff & 2000 Ha. in Rabi. Derjang dam is a zoned earth fill dam of length 1875m with

maximum height of 27.31m. There are two dykes on both sides of the dam continuous with it.

Lengths of right and left dykes are 1830m and 1220m respectively. Catchment area at dam site is

399.00 Sq.km. The spillway is a masonry gravity type of length 164.63m and with crest level at

RL 144.78m. It has been provided with 6 nos. of radial gates of size 15.545 x 6.096m each. The

spillway is capable of peak discharging capacity of 3502 Cumec. There is one Head Regulator

with one vent (2.43m x1.82m) on left side of the dam with design discharge capacity of 8.33

Cumecs.

The project was chosen to be one of the four pilot projects of Orissa for formation Water

Users Association (WUA). Farmers Organization & Turnover Programme was introduced in

Derjang Irrigation Project during March 1996. The Participatory Irrigation Management (PIM) by

constituting WUA for optimal use of water by involvement of farmers in rehabilitation and

operational stage became successful. For this purpose 17 nos. of Pani Panchayat have been

formed in the command area. One apex Building has been constructed to have day to day

activities of the Apex body with the co-ordination of Pani Panchayat, Agriculture, Irrigation &

Revenue officials.

Derjang Dam was chosen for improvement under Dam Rehabilitation and Improvement

Project (DRIP ) and the Project Tamplet has been approved for Rs. 573.26 Lakh. The SPMU as

well as DSRP recommended for providing basic facilities and remedial measures for the dam

under consideration. General basic facilities which have not been provided so far in the bank like

electrification to the dam area top and spillway, improvement to the existing communication

system and security enhancement by providing barbed wire fencing near toe area, proper temper

4| Page

Page 6: [-] Angul Irrigation Division, Angul

free and vandal proof lock and key arrangement and necessary remedial measures. The revised

PST amounting to Rs.573.26 Lakh has been approved by the bank.

The following works were suggested to be taken up under DRIP.

Structural Rehabilitation Measures:

* Flattening of D/S slope of right dyke to 1: 2 slopes with provision of berm.

* Construction of dwarf wall at D/S edge of Dam top.

* Construction of Longitudinal & vertical drain on D/S of dam.

* Approach road to spillway needs improvement.

* Construction of parapet wall in the balance portion of dykes in upstream side.

* Repair to radial gate and other gates including mechanical and electrical installations.

Non Structural Measures:

* Dam Instrumentation.

Basic Facilities Enhancement:

• Improvement to the dam top road.

• Barbed wire fencing.

• Improvement to the dam top road.

• Electrification for dam.

Tender for civil works completed and work is under progress. Estimate for Dam

instrumentation and Electrification for Dam has been submitted to higher authority and tender

will be invited on receipt of sanction estimate.

SALIENT FEATURES OF DERJANG IRRIGATION PROJECT

Sl. No. Items Unit 1

INTRODUCTION

District Angul Near village Majhika Latitude 20o-51’-00” N Longitude 85o-21’-00” E Topo sheet No. 73 D/13, H/1, H/2 2. HYDROLOGY Catchment Area sq. km. 399.00 Minimum annual Rainfall mm. 758.34 Maximum annual Rainfall mm. 1454.31 Average annual Rainfall mm. 1085.50 3. RESERVOIR Full Reservoir Level (FRL) m. 150.00 Maximum Water Level (MWL) m. 150.91

5| Page

Page 7: [-] Angul Irrigation Division, Angul

Dead Storage Level (DSL) m. 140.24 Gross Storage at FRL (Cap) Ham. 5112.80 Dead Storage at DSL (Cap) Ham. 464.80 Top level of Dam m. 153.50 Submerged area at FRL/MWL ha. 866.00 4. MAIN DAM Type Zone fill Top length of Dam m. 1875.00 Maximum height of Dam m. 27.31 Top width m. 4.57 5 SPILLWAY Type Masonry Gravity Type No & Type of gate 6 Nos. Radial Size of gate m. 15.54 x 6.096 Length of spillway m. 164.63 Crest level of spillway m. 144.78 Spillway capacity Cumecs 3502.00 6. DISTRIBUTION SYSTEM Gross Command Area ha. 14532.00 Ayacut Area (C.C.A) ha. 8400.00 Certified C.C.A ha. 7392.00 Area Irrigated during Khariff ha. 7392.00 Area Irrigated during Rabi ha. 2373.00 Total annual Irrigation ha. 9765.00 Length of Main Canal km. 13.19 Length of Branch Canal km. 10.77 Length of Minor & Sub-Minor km. 113.37 Angul Main Canal Discharge Capacity Cumecs 8.33 Bed Level of A.M.C (at R.D 00) lakh 135.64 No. & Size of H.R. Vent lakh 1 x 2.43 x 1.82 Bed width of A.M.C (at R.D 00) Rs. 11.30 Bank width of A.M.C (L/R) Rs. 4.50m / 1.80 7 Cost of Estimate Cost of Head works Rs. 643.76 Cost of Canals Rs. 237.03 Total Project cost/Extension 880.79 Total Revised Project Cost Benefit Cost Ratio No. 1.85 Cost per Ha. of ayacut (CCA) Rs. 11907.00 Cost per Ha of av. Annual Irr. Rs. 9378.00 Year of commencement 1960 Year of completion 1978 No. of Pani Panchayat No. 17

6| Page

Page 8: [-] Angul Irrigation Division, Angul

(ii) AUNLI IRRIGATION PROJECT

Aunli Irrigation Project located in Chhendipada block of Angul district, is a diversion scheme across river Aunli, a tributary of river Tikara which is in turn a tributary to the river Brahmani. The project intercepts a catchment area of 150.22 Sq. Km. The project was completed in all respect in the year 1987-88. But it started giving irrigation in the year 1983-84. The project was designed to irrigate 1746 Ha. of C.C.A. in Khariff only. But now it also irrigates 500 Ha. in Rabi season. The distribution system consists of a main canal of 4.656 Km. length and 8 nos. of minors, sub-minor and distributary of 22.562 Km in length. The main canal is a contour canal, which runs under a hill slope. The ayacut is of sandy soil.

On account of constant irrigation both in Khariff and Rabi season and lack of proper maintenance due to paucity of adequate maintenance grant the canals were in bad shape and tail Enders was suffering. The project was included in SIFT component of OWRCP scheme assisted by World Bank. The productivity after SIFT programme has increased by 26%. The deposits by the farmers in the bank (S.B.I., Kanaloi Branch) have increased from Rs.30.40 lakhs (in 1995-96) to Rs.152.00 lakhs (in 2002-03). The loan disbursed by the bank is Rs.78,53,000/- . Day by Day the Bank transaction has been increased as per development of socio-economical condition of the local people.

The Aunli Irrigation Project was chosen to be one of the four pilot projects of Orissa for formation of Water Users Association (WUA). Farmers Organization and Turnover programme was introduced in this project during the year 1996. The Participatory Irrigation Management (PIM) by forming WUA for optimal use of water by involvement of farmers in rehabilitation and operational stage became successful. For this purpose four nos. of WUAs have been formed in the command area. So, the main purpose of F.O.T. programme to turnover the canal system to Water Users Association to ensure enhanced crop productivity with assured irrigation water supply has been successfully achieved. One Apex body has been formed with construction of Apex building. Implements of Rs.6.00lakhs have been handed over to the Apex body free of cost by the Department of Agriculture, Govt. of Odisha. All the four nos. of WUAs have been provided with Grant-in-Aid towards maintenance of their respective canals and field channels since 2002-03. (Annexure – C shows the Index Map of Aunli Irrigation Project).

7| Page

Page 9: [-] Angul Irrigation Division, Angul

SALIENT FEATURES OF AUNLI IRRIGATION PROJECT Sl. No. Items Unit Revised 1 INTRODUCTION District Angul Near village Patrapada Latitude 21o-04’-00” N Longitude 84o-42’-20” E Topo sheet No. 73 C/12 &73 C/16 2. HYDROLOGY Catchment Area sq. km. 150.22 Minimum Annual Rainfall mm. 961.20 Maximum Annual Rainfall mm. 1799.08 Average Annual Rainfall mm. 1071.73 3. RESERVOIR Full Reservoir Level (FRL) m. 195.90 Maximum Water Level (MWL) m. 198.75 No. of vents in the scouring sluice No. 4 Size of vent m. (2.50 x 2.35) No. & size of H/R No. / Mtr. 1 No. (1.00 x 2.00)M Sill level of scouring sluice m. 193.55 Crest Level of weir m. 195.00 4. DIVERSION WEIR

Type Broad crested weir with automatic falling shutters

Length of Diversion Weir m. 55.66m including scouring sluice divide wall

Type Diversion weir Crest level of weir m. 195.00 Capacity of the weir Cumecs 948.00 5. DISTRIBUTION SYSTEM Gross Command Area (G.C.A) ha. 1940.00 Ayacut Area (C.C.A) ha. 1746.00 Certified C.C.A ha. 1746.00 Area Irrigated during Khariff ha. 1746.00 Area Irrigated during Rabi ha. 809.00 Total Annual Irrigation ha. 2846.00 Length of Main Canal km. 4.66 Length of Minor & Sub-Minor km. 23.29 F.S.Q of Main Canal (Rt/Lt) Cumecs 2.29 6. COST OF ESTIMATE Cost of Head works Lakhs 128.35 Cost of Canals Lakhs 171.33 Total Project cost/Extension Rs. 299.68 Benefit Cost Ratio 2.90 Cost per Ha. of ayacut (CCA) Rs. 17164.00 Cost per Ha of av. Annual Irr. Rs. 10530.00 Year of commencement 1976 Year of completion 1988 No. of Pani Panchayat No. 4

8| Page

Page 10: [-] Angul Irrigation Division, Angul

(iii) DADARAGHATI IRRIGATION PROJECT

The Dadaraghati Irrigation Project is a reservoir scheme across Gambharia nallah near

the village Rangathali under Parjang Block of Kamakhyanagar Sub-Division in the district of

Dhenkanal. The projects intercepts a catchment area of 102 Sq.km. The project comprises of a

solid gravity concrete dam of 240m long and a solid gravity ogee type ungated spillway. It is

irrigating an ayacut of 4120 Ha. in Khariff and 1650 Ha. in Rabi. The ayacut area is irrigated by

two canals on either side. The Left Main Canal off takes from the Right Main Canal at RD. 0.579

Km. Right Main Canal has been extended up to 15.40Km.

F.O.T. scheme has been adopted in this project. WALMI had been entrusted to

motivate the farmers for successful implementation of the scheme. Accordingly 12 nos. of Water

Users Association (WUAs) were formed by July 2002. One Apex Building has been constructed

and agricultural implements amounting to Rs.6.00 lakhs has been provided to the apex body.

Grant-in-Aid has been provided to all Pani Panchayat for O&M of the Minor and Sub-Minor

canal system since 2004-05 to till date. During the year 2008-09 an amount of Rs.4,12,000/- has

been provided to 12 Nos. of Pani Panchayat. Utilisation Certificate has also been submitted to

Water Resources Department from 2004-05 to 2008-09. The activities of Pani Panchayats are

quite satisfactory and achieved the targeted yield given by Agriculture Department. (Annexure –

D shows the Index Map of Dadaraghati Irrigation Project).

SALIENT FEATURES OF DADARAGHATI IRRIGATION PROJECT

Sl. No. Items Unit 1 INTRODUCTION District Dhenkanal Near village Dadaraghati Latitude 21o-03’-00” N Longitude 85o-17’-00” E Topo sheet No. 73 G, H&L 2. HYDROLOGY Catchment Area sq. km. 102.00 Minimum annual Rainfall mm. 668.00 Maximum annual Rainfall mm. 2147.00 Average annual Rainfall mm. 1270.00 3. RESERVOIR Full Reservoir Level (FRL) m. 118.87 Maximum Water Level (MWL) m. 121.83 Dead Storage Level (DSL) m. 111.56 Gross Storage at FRL (Cap) Ham. 2797.00 Dead Storage at DSL (Cap) Ham. 370.00 Top level of Dam m. 124.05 Submerged area at FRL/MWL ha. 847.00

9| Page

Page 11: [-] Angul Irrigation Division, Angul

4. MAIN DAM Type Solid gravity concrete Dam Top length of Dam m. 240.00 Maximum height of Dam m. 19.00 Top width m. 5.00 5 SPILLWAY Type Ogee Type No & Type of gate Non gated Size of gate m. Length of spillway m. 92.00 Crest level of spillway m. 118.87 Spillway capacity Cumecs 368.00 6. DISTRIBUTION SYSTEM Gross Command Area ha. 6164.00 Ayacut Area (C.C.A) ha. 5150.00 Certified C.C.A ha. 4120.00 Area Irrigated during Khariff ha. 4120.00 Area Irrigated during Rabi ha. 1648.00 Total annual Irrigation ha. 5768.00 Length of Main Canal km. 15.424 Length of Minor & Sub-Minor km. 43.23 F.S.Q of Main Canal (Rt/Lt) Cumecs 5.12 7. Cost of Estimate Cost of Head works lakh 544.31 Cost of Canals lakh 444.37 Total Project cost/Extension Rs. 988.68 Total Revised Project Cost Rs. Benefit Cost Ratio 2.011 Cost per Ha. of ayacut (CCA) Rs. 23616.00 Cost per Ha of av. Annual Irr. Rs. 16865.00 Year of commencement 1973 Year of completion 1980 No. of Pani Panchayat No. 12

(iv) RAMIAL IRRIGATION PROJECT Ramial Irrigation Project has been constructed across river Ramial, a left tributary of

river BRAHMANI to supply irrigation water to an ayacut area 6128 Ha. in Kankadahad Block

and Kamakhyanagar Block of Dhenkanal District. Ramial Dam is located at a distance of 2.0Km

North of village Budhibil at Latitude 21 o – 6` - 50`` N & Longitude 85 o – 35` - 59`` East, 26.00

Km North of Kamakhyanagar town in the District of Dhenkanal. This project intercepts a

catchment area of 328 Sq.Km.

The project was taken up for execution during the year 1975-76 under World Bank

assistance. The project construction was completed in March 1990. Before completion Irrigation

was given from the year 1981-82.

10| Page

Page 12: [-] Angul Irrigation Division, Angul

This project comprises of a 424.50m long and 28.35m high Rolled Homogenous

Earth-fill dam, 55.50m long ogee spillway fitted with 4 Nos. of Radial gates of size 12m x 6m

and 2 nos. head regulators on either corner of earth dam for two main canals. The Left Main

Canal (L.M.C.) of 22.00Km. long caters irrigation to certified ayacut area of 4473Ha. (3888 Ha.

in Kankadahad block + 585 Ha. in Kamakhyanagar block). The Right Main Canal (R.M.C.) 9.60

Km long caters irrigation to certified ayacut are of 1655 Ha. in Kankadahad block only.

The formation of Pani Panchayat or Water Users Association has been initiated during

the financial year 2003-04. Total 15 Nos. of Pani Panchayats have been formed and the

distributary (small) and minor canals have been successfully handed over to respective Water

Users Association with an ayacut area of 6128 Ha. Grant-in-Aid has been provided to Pani

Panchayats for operation & maintenance of minor canals since 2005-06. The performances of

Pani Panchayats are highly appreciated by higher authorities. (Annexure – E shows the Index

Map of Ramiala Irrigation Project).

SALIENT FEATURES OF RAMIAL IRRIGATION PROJECT

Sl. No. Items Unit 1 INTRODUCTION District Dhenkanal Near village Budhibil Latitude 21o-06’-43” N Longitude 85o-35’-30” E Topo sheet No. 73 G/12, 73 H/9 2. HYDROLOGY Catchment Area sq. km. 328.00 Minimum annual Rainfall mm 1550.00 Maximum annual Rainfall mm Average annual Rainfall mm 1558.00 3. RESERVOIR Full Reservoir Level (FRL) m. 109.73 Maximum Water Level (MWL) m. 110.64 Dead Storage Level (DSL) m. 100.44 Gross Storage at FRL (Cap) Ham. 8600.00 Dead Storage at DSL (Cap) Ham. 1075.00 Top level of Dam m. 113.69 Submerged area at FRL/MWL ha. 1725.00 4. MAIN DAM Type Rolled earth homogeneous

section Top length of Dam m. 480.00 Maximum height of Dam m. 28.35 Top width m. 4.57 5 SPILLWAY Type Ogee type No & Type of gate 4 Nos. Radial

11| Page

Page 13: [-] Angul Irrigation Division, Angul

Size of gate m. 12.00 x 6.00 Length of spillway m. 55.50 Crest level of spillway m. 103.73 Spillway capacity Cumecs 1885.00 6. DISTRIBUTION SYSTEM Gross Command Area ha. 14065.00 Ayacut Area (C.C.A) ha. 6128.00 Certified C.C.A ha. 6128.00 Area Irrigated during Khariff ha. 6128.00 Area Irrigated during Rabi ha. 3200.00 Total annual Irrigation ha. 9328.00 Length of Main Canal km. 31.60 Length of Minor & Sub-Minor km. 120.40 F.S.Q of Main Canal (Rt/Lt) Cumecs 3.08 / 6.76 7. Cost of Estimate Cost of Head works Lakh 1074.68 Cost of Canals Lakh 853.59 Total Project cost/Extension Rs. 1928.27 Total Revised Project Cost Rs. Benefit Cost Ratio 4.35 Cost per Ha. of ayacut (CCA) Rs. 26324.00 Cost per Ha of av. Annual Irr. Rs. 14471.00 Year of commencement 1975 Year of completion 1990 No. of Pani Panchayat No. 15

(v) SAPUA BADJORE IRRIGATION PROJECT

The Sapua Badajore Irrigation Project is an integrated Project situated in drought

prone area of Hindol Sub-Division of Dhenkanal District. The project envisages construction of a

dam on Sapua River near village Nahada, a tributary of river Mahanadi and a Barrage at Nuabag

on river Badajore, 7km down stream Badajore dam site. The project was started during the year

1989 & the 1st Phase of Work ( i.e. Sapua Dam in Truncted Manner up to T.B.L. 172.50m,

Nuabag Barrage, Sapua Link Channel and its system, Left Main Canal & Right Main Canal and

their system ) completed in March 2006. Sapua Dam is a homogeneous earth fill dam having

maximum height of 25.50m at deepest bed level and total length is 1210m. The Project has

designed certified ayacut of 2469 Ha in Khariff and 350Ha in Rabi. Total five nos. of Pani

Panchayats has been formed in the ayacut area and functioning smoothly. (Annexure – F shows

the Index Map of Sapua Irrigation Project).

Sapua Dam was chosen for improvement under Dam Rehabilitation and Improvement

Project (DRIP ) and the Project Tamplet has been approved for Rs. 850.00 Lakh. Improvement of

Dam by heightening of Earth Dam to its ultimate design T.B.L.174.00m has already completed.

Construction of Dam top parapet wall, dwarf wall, Dam top black topped road , Down Stream

12| Page

Page 14: [-] Angul Irrigation Division, Angul

slope drainage arrangement , improvement of approach road and construction of C. C. lining &

protection walls in Sapua Link Channel is under progress.

SALIENT FEATURES OF SAPUA BADJORE IRRIGATION PROJECT

Sl. No. Items Unit 1 INTRODUCTION District Dhenkanal Near village Nahada Latitude 20o-35’-30” N Longitude 85o-17’-30” E Topo sheet No. 73 H/2, 73 H/6 2. HYDROLOGY Catchment Area sq. km. 52.00 Minimum annual Rainfall mm. 831.03 Maximum annual Rainfall mm. 1600.81 Average annual Rainfall mm. 3. RESERVOIR Full Reservoir Level (FRL) m. 168.50 Maximum Water Level (MWL) m. 170.00 Dead Storage Level (DSL) m. 161.10 Gross Storage at FRL (Cap) Ham. 850.00 Dead Storage at DSL (Cap) Ham. 204.00 Top level of Dam m. 172.50 Submerged area at FRL/MWL ha. 4. MAIN DAM Type Earth Dam Top length of Dam m. 1290.00 Maximum height of Dam m. 25.755/25.555 Top width m. 5 SPILLWAY Type Labyrinth with chute

spillway un-gated No & Type of gate 2 Nos. Size of gate m. Length of spillway m. 47.00 / 34.50 Crest level of spillway m. 168.50 Spillway capacity Cumecs 535.50 / 375.20 6. DISTRIBUTION SYSTEM Gross Command Area ha. Ayacut Area (C.C.A) ha. 2469.00 Certified C.C.A ha. Area Irrigated during Khariff ha. Area Irrigated during Rabi ha. 350.00 Total annual Irrigation ha. Length of Main Canal & Link channel km. 27.485 Length of Minor & Sub-Minor km. 27.880 F.S.Q of Main Canal (Rt/Lt) Cumecs 7. Cost of Estimate Cost of Head works lakh Cost of Canals lakh

13| Page

Page 15: [-] Angul Irrigation Division, Angul

Total Project cost/Extension lakh 3481.43 Total Revised Project Cost lakh Benefit Cost Ratio Cost per Ha. of ayacut (CCA) Rs. Cost per Ha of av. Annual Irr. Rs. Year of commencement 1989 Year of completion 2006 No. of Pani Panchayat No. 5

(vi) FLOOD CONTROL WORKS IN ANGUL DISTIRCT

Angul Irrigation Division is also looking after the flood embankment of river

Samakoi, Nandira, Aunli, Kumbharia Nallah, Tikira and Mahanadi from D/S of Kiakata bridge in

the district of Angul. There are 1.81 Km. of O.A. Embankment & 2.76Km. of T.R. Embankment

and 2.519 Km. of Masonry wall on both sides of river Brahmani, Nandira, Samakoi, Mahanadi

and Kumbharia Nalla. The embankments are not continuous but in piece-mill basis. The Assistant

Engineer, N.W.M.P Sub-Division, Assistant Engineer, Aunli Irrigation Sub-Division and

Assistant Engineer, Dadaraghati Dam Sub-Division are looking after the river training works of

river Bauli, Lingara, Kumbharia Nallah, Tikira & Mahanadi Left pertaining to Angul District.

(Annexure – G shows the Index Map of Flood Embankments in Angul District).

The constituency-wise embankments are as follows :

(Length in Km.)

1. Pallahara Constituency. 1.650

2. Talcher Constituency 2.739

3. Athamallik Constituency. 1.270

4. Chhendipada Constituency. 1.430

Total 7.089Km.

(vii) FLOOD CONTROL WORKS IN DHENKANAL DIST.

Angul Irrigation Division is looking after flood embankments of river Brahmani and

its left tributary, Ramial in the districts of Dhenkanal and Angul i.e. erstwhile Dhenkanal district.

This report pertains to Flood Embankments in Dhenkanal District only. There are 65.826Kms. of

Marginal Flood Embankment(M.F.E), 18.102 Kms. of O.A. Embankment (O.A.E) & 11.09Kms.

of T.R. Embankment (T.R.E) on both sides of river Brahmani and Ramial. The embankments are

not continuous but in piece-mill basis. The Flood Sub-Division is located at Kamakhyanagar

having three flood sections i.e. at Kamakhyanagar, Analaberini and Dhenkanal to deal with flood

control works and flood fighting measures pertaining to Dhenkanal District. (Annexure – H

shows the Index Map of Flood Embankments in Dhenkanal District).

14| Page

Page 16: [-] Angul Irrigation Division, Angul

The constituency-wise embankments are as follows :

(Length in Km.) 1. Parjang Assembly Constituency. 2.59

2. Hindol Assembly Constituency. 11.00

3. Dhenkanal Assembly Constituency. 1.520

4. Kamakhyanagar Assembly Constituency. 79.908 Total 95.018 Km.

4. ACTIVITIES

(a) IRRIGATION POTENTIAL Project wise Khariff & Rabi Irrigation Provided during 2015-16 is as follows:

Sl. No.

Name of the Project. Certified Ayacut Area

Irrigation Provided during Kharif

Irrigation Provided

during Rabi

Remarks

1 Derjang Irr. Project 7392 ha 7310.47 ha 1343 ha Less Rabi area due to insufficient water

2 Aunli Irr. Project 1746 ha 1548.00 ha 95 ha - do-

3 Dadaraghati Irr. Project 4120 ha 4038.61 ha 20 ha do-

4 Ramial Irr. Project 6128 ha 5382.09 ha Nil Canal closer for ADB works

5 Sapua Badjore Irr. Project

2469 ha 2222.54 ha Nil Dry reservoir

(b) BUDGET/ALLOTTMENT (i) Allotment received & Expenditure incurred during the year under different

schemes for Operation and Maintenance / Improvement of Projects under the control of C.E. & B.M., BRB, Dhenkanal is as follows:

Sl.

No

.

Name of Project

Critical Lump ( C & D )

Maintenance of Roads &

Bridges

Maintenance of Non-Res

Building

Non Plan (M/R)

M & E

Allot. Exp. Allot. Exp. Allot. Exp. Allot. Exp. Allot. Exp.

1 Derjang 150 152.49 13.00 28.68 18.71 18.82 105.39 98.54

7.25

7.24

2 Aunli 28 28.13 10.00 8.49 - - 27.13 26.26

3 Dadaraghati 90 89.91 13.00 12.12 - - 49.68 44.13

4 Ramial 145 142.42 12.00 10.14 5.00 4.89 98.23 79.53

5 Sapua 25 25.04 10.00 16.40 - - 33.01 33.00

Total 438 437.99 75.94 75.93 23.71 23.71 313.43 281.46 7.25 7.24

(Note: List of projects under different schemes are enclosed herewith as Annexure- I)

15| Page

Page 17: [-] Angul Irrigation Division, Angul

(ii) Improvement and Rehabilitation works of Derjang and Sapua dam has been taken up as per suggestion of Dam Safety Review Panel during 2015-16 under Dam Rehabilitation and Improvement Projects (DRIP). Allotment received & Expenditure incurred during the year 2015-16 furnished below:-

Sl

No..

Name of

Project

Approved Project

Cost as Per PST( Lakh)

Budget in Lakh

Allotment in Lakh

Expenditure incurred During

2015-16

Remarks

1 Derjang 573.26 150.00 210.00

58.77 Work is under progress

2 Sapua 850.00 260.00 151.23 -do-

Total 1423.26 410.00 210.00 210.00

(Note: List of projects under DRIP are enclosed herewith as Annexure- J)

(iii) Allotment received & Expenditure incurred during the year under different schemes for Maintenance & Repair / Flood Control / Restoration works under the control of C.E. & B.M., LMB, Bhubaneswar is as follows:

Sl.

No.

Name of the scheme Financial Position (in Lakhs)

Sector wise Achievement

Allotment

Expenditure

Launching

( m)

Slope Packing ( m )

New Embank

ment ( m )

Spur ( No. )

Stone Masonry/ CC Wall ( m )

Road in m

(Morum

Topped)

1 Critical Lump (R E) 90.00 90.00 887 - 235 4 600

2 Maintenance of Roads & Bridges

22.00 22.00 - - - - - 1280

3 State Plan-Flood Control (R.E. )

270.00 270.00 1388 113 905 4 132 -

4 State Plan Restoration 230.00 207.96 598 - 1260 2 - - 5 Flood Fighting 3.97 3.97 - - - - - - 6 Maintenance & Repair 70.60 70.45 - - - - - -

Total 686.57 664.38 2873m 113m 2400m 10nos 132m 1880m

(Note: List of projects under different schemes are enclosed herewith as Annexure- K)

16| Page

Page 18: [-] Angul Irrigation Division, Angul

5. OTHER ACTIVITIES

This Division is also collecting Industrial water rate from various industries set up

inside Angul District. (Annexure – L shows the Progress Report of Industrial Water Rate for the

year 2015-16 in favour of Angul Irrigation Division).

6. STATUS OF COURT CASES There are 20 nos. of court cases regarding Pensionary Benefits under W/C

Establishment; 5nos of court cases Regarding Water Tax and 1 no of contempt cases of Angul

Irrigation Division, Angul. (Annexure – M shows the List of pending Court Cases of Angul

Irrigation Division).

7. IMPORTANT CONTACT DETAILS SL

No.

NAME OF OFFICER DESIGNATION CONTACT NO.

I Division Office, Angul

1 Shri Saroj Kumar Pradhan Executive Engineer 9437382746 06764–236343/236152(O) (Fax) [email protected]

2 Shri Madan Mohan Sethy Assistant Executive Engineer (Estimator)

9437529912

3 Shri Kaibalya Pradhan Assistant Engineer (Estimator) 9861008940 4 Mr. Ahmed Nizam Account Officer 8093499477

II Derjang-Aunli Sub Division Office, Angul 1 Shri Subrat Kumar Nayak Assistant Executive Engineer 9437170172 2 Shri Samir Das Assistant Engineer 3 Shri Jadavananda Sahu Assistant Engineer

III Dadaraghati Dam Sub Division Office, Dadaraghati 1 Shri Bijaya Kumar Sethi Assistant Executive Engineer 9437635640

IV Ramiala Dam Sub Division Office, Kankadahad 1 Shri Pramod Kumar Biswal Assistant Executive Engineer 9438628348

V Sapua Badjore Sub Division Office, Satmile 1 Shri Subrat Kumar Nayak Assistant Executive Engineer 9437170172

VI Flood Sub Division Office, Kamkhyanagar, Dhenkanal 1 Shri Pramod Kumar Biswal Assistant Executive Engineer 9438628348

17| Page

Page 19: [-] Angul Irrigation Division, Angul

ANNEXURE- A

JURISDICTION MAP OF ANGUL IRRIGATION DIVISION, ANGUL

18| Page

Page 20: [-] Angul Irrigation Division, Angul

ANNEXURE- B

INDEX MAP OF DERJANG IRRIGATION PROJECT

19| Page

Page 21: [-] Angul Irrigation Division, Angul

ANNEXURE- C

INDEX MAP OF AUNLI IRRIGATION PROJECT

20| Page

Page 22: [-] Angul Irrigation Division, Angul

ANNEXURE- D

INDEX MAP OF DADARAGHATI IRRIGATION PROJECT

21| Page

Page 23: [-] Angul Irrigation Division, Angul

ANNEXURE- E

INDEX MAP OF RAMIALA IRRIGATION PROJECT

22| Page

Page 24: [-] Angul Irrigation Division, Angul

ANNEXURE- F

INDEX MAP OF SAPUA BADJORE IRRIGATION PROJECT

23| Page

Page 25: [-] Angul Irrigation Division, Angul

ANNEXURE- G

INDEX MAP OF FLOOD EMBANKMENTS IN ANGUL DISTRICT

24| Page

Page 26: [-] Angul Irrigation Division, Angul

ANNEXURE- H

INDEX MAP OF FLOOD EMBANKMENTS IN DHENKANAL DISTRICT

25| Page

Page 27: [-] Angul Irrigation Division, Angul

ANNEXURE- I

(Rs. in lakh)Name of scheme Name of project No. of

workTotal

Budget Provision

Received Allotment

Total Expenditure

upto 31.03.2016

Remarks

Critical Works (Canal & Dam)

Derjang (Civil) 16 145.00 147.49 Completed

Derjang (Mech.) 2 5.00 5.00 CompletedAunli (Civil) 4 28.00 28.13 CompletedDadaraghati (Civil) 11 90.00 89.91 CompletedRamial (Civil) 18 141.00 138.42 Completed

Ramial (Mech.) 1 4.00 4.00 CompletedSapua (Civil) 3 25.00 25.04 Completed

Total 55 438.00 438.00 437.9913th Finance

Derjang 1 20.00 28.68 Completed (Arrear of Rs. 8.51 Lakhs)

Dadaraghati 2 13.00 12.22 Completed

Ramial 1 12.00 10.14 Completed

Sapua 1 10.00 16.40 Completed (Arrear of Rs. 8.03 Lakhs)

Aunli 1 10.00 8.49 Completed Total 6 65.00 76.00 75.93 Addl. Allotment of 11.00lakh

for clerance of arear biillsDerjang 1 17.00 18.82 1 No.- Work in progress

Ramial 1 5.00 4.89 1 No.- Work completed

Total 2 22.00 23.71 23.71 Addl. Allotment of 1.71 lakh for clerance of arear biills

Derjang 2 150.00 58.77 1 No.- Work in Progress 1 No.- Re-tender invited

Sapua 2 260.00 151.23 1 No.- Wort in progress 1 No- Agt. to be drawn

Total 4 410.00 210.00 210.00Derjang - Works 60.62 56.00 56.00

Establishment 50.85 49.39 42.54Sub-Total 111.47 105.39 98.54

Aunli - Works 21.88 19.00 19.00Establishment 8.41 8.13 7.26Sub-Total 30.29 27.13 26.26

Dadaraghati-Works 38.54 34.00 33.98Establishment 16.21 15.68 10.15Sub-Total 54.75 49.68 44.13

Ramial - Works 63.91 59.00 58.99Establishment 39.91 39.23 20.54Sub-Total 103.82 98.23 79.53

Sapua - Works 39.42 33.00 33.00Establishment 0.00 0.00Sub-Total 39.42 33.00 33.00

Total 339.75 313.43 281.461274.75 1061.14 1029.09

438.00

Maintenance of Roads & Bridge

20-3054-80-800-2450-21033

ABSTRACTStatus of works under Angul Irrigation Division for the year 2015-16

C.E. & B.M., B.R.B. Dhenhanal

Non-Plan (M/R to Canal & Dam) 20-2701-…… -101-0851-02001/ 03001 / 06003 / 21072 / 21073 / 21111 / 21033

20-2701-80-800-1729-21033

Repair & Maintenance works with

Wages & Work charged Establishment Expenditures

23.71

76.00

210.00

Dam Rehabilitation & Improverment Project (DRIP)

Maintenance of Non-Residential Building 20-2059-80-053-2448-21033

Grand Total

26| Page

Page 28: [-] Angul Irrigation Division, Angul

Status Report under Critical Lump for the year 2015-16 ( Canal & Dam ) Sl. No.

Name of work Budget Provision in lakh.

Agt. Amount Rs. in lakh

Agt. No.

Agency Date of commencement

Date of completion

E.O.T.

Expenditure (Rs. in lakh)

upto 31.03.2016

Status of work

Achievement ( C.C. Lining

in m )

1 2 3 4 5 6 7 8 9 10 11 Derjang Irrigation Project 1 Improvement to Jarasingha Minor from

R.D. 1500m to R.D. 1600m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

6.00 5.82 20 P1 / 2015-

16

Manas Ranjan Sahu

01.06.2015 31.08.2015 5.80 Work Completed

170.00

2 Improvement to Ghuchapal Minor from R.D. 1300m to R.D. 1450m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

6.00 5.86 43 P1 / 2015-

16

Narayan Naik 07.06.2015 06.09.2015 5.85 Work Completed

169.00

3 Improvement to Suleimal Minor from R.D. 00m to R.D. 550m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

4.50 4.24 67 P1 / 2015-

16

Narayan Naik 29.06.2015 28.08.2015 4.24 Work Completed

195.00

4 Improvement to H.R. and canal of Kumanda Minor from R.D. 00m to R.D. 100m of Derjang Irrigation Project. ( C.C. Guard wall & Lining)

4.50 4.21 56 P1 / 2015-

16

Bimal Ch. Behera 10.06.2015 09.08.2015 4.15 Work Completed

172.00

5 Repair to Laterite lining and strengthening of Right Bank of A.M.C. from R.D. 2000m to 2500m of Derjang Irrigation Project.

7.00 7.96 41 P1 / 2015-

16

Manas Ranjan Sahu

05.06.2015 04.09.2015 7.94 Work Completed

Repair

6 Providing C.C. Protection wall and strengthening of Right Bank of A.M.C. from R.D.5200m to 5500m of Derjang Irrigation Project.

7.00 6.57 79 P1 / 2015-

16

Manas Ranjan Sahu

08.07.2015 07.10.2015 6.57 Work Completeds

30.00

7 Improvement to Raniguda Distributary from R.D. 2800 m to R.D. 3520m of Derjang Irrigation Project. ( Renovation of Falls and C.C. Guard wall & Lining )

15.00 14.99 72P1 / 2015-

16

Biranchi Dalei 05.07.2015 02.10.2015 15.02 Work Completed

166.00

8 Improvement to Nuapada Distributary from R.D. 650m to m to R.D. 1340 m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

10.00 8.50 70 P1 / 2015-

16

Manas Ranjan Sahu

01.07.2015 30.09.2015 8.50 Work Completed.

93.00

27| Page

Page 29: [-] Angul Irrigation Division, Angul

9 Improvement to Khalari Distributary from R.D. 1105m to R.D. 1585 m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

15.00 15.00 75 P1 / 2015-

16

Biranchi Dalei 05.07.2015 02.10.2015 15.00 Work Completed

176.00

10 Improvement to Santri Minor from R.D. 1002 m to R.D. 1202 m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

15.00 12.70 88 P1 / 2015-

16

Barun Ku. Behera

27.07.2015 24.10.2015 12.70 Work Completed

200.00

11 Improvement to Santri Minor from R.D. 4400 m to R.D. 4550 m of Derjang Irrigation Project. ( C.C. Guard wall & Lining )

15.00 14.45 74 P1 / 2015-

16

Bimal Ch. Behera 05.07.2015 02.10.2015 14.45 Work Completed

150.00

12 Improvement to Balaramprasad Branch Canal of Derjang Irrigation Project. (Construction of C.C. Guard wall R.D.3725m to 3867m)

15.00 14.78 85 P1 / 2015-

16

Bimal Ch. Behera 15.07.2015 12.10.2015 14.78 Work Completed

142.00

13 Improvement to Kuspangi Minor of Derjang Irrigation Project. (Construction of C.C. Lining and Re-sectioning of Canal R.D.330 m to R.D.535m )

9.00 7.91 22 P1 / 2015-

16

Uttam Behera 02.06.2015 01.09.2015 7.91 Work Completed

205.00

14 Improvement to Kurudol Minor of Derjang Irrigation Project. (Construction of C.C. Lining and Re-sectioning of Canal R.D.330 m to R.D.535m )

6.00 7.51 73 P1 / 2015-

16

Biranchi Dalei 04.07.2015 03.10.2015 7.51 Work Completed

205.00

15 Improvement to Balaramprasad Tail Distributary of Derjang Irrigation Project. (Construction of C.C. Guard wall R.D.5100 m to R.D.5210m )

10.00 9.91 71 P1 / 2015-

16

Debadatta Pradhan

03.07.2015 02.10.2015 9.91 Work Completed

110.00

Add

l. W

ork

Construction of Guard wall along the service road of Angul Main Canal from R.D 8800m to 8814m & R.D 9400m to 9427m of Derjang Irrigation Project.

4.55 110 P1 / 2015-

16

Pratap Ku. Sahu 26.11.2015 23.02.2016 4.55 Work Completed

41.00

Repair to Apex Building at Kumanda of Derjan Irr Project

2.27 Work Completed

Breach closing to right bank from RD 1270 to 1275m of Barsingha Distributary of Derjan Irr Project

0.17 Work Completed

28| Page

Page 30: [-] Angul Irrigation Division, Angul

Bed clearance of Purukia minor no 2 from RD 550 to 1050m of Derjan Irr Project

0.17 Work Completed

Mechanical Works 145.00 144.96 147.49 2224.00 17 Repair / Renovation including Painting,

greasing and rubber seal changing of H/R and C/R gates of Main Canal, Branch Canal, Distributary and Minor and Sub-Minors of Derjang Irrigation Project.

3.50 3.50 3.50 Allotment to be diverted to Stores & Mechanical

Divn., Hirakud.

18 Repair & Maintenance including Painting, greasing and rubber seal changing of Radial Gates of Derjang Dam.

1.50 1.50 1.50 -do-

Total 150.00 149.96 152.49

Aunli Irrigation Project 1 Improvement to Aunli Main Canal from

R.D. 1980m to 2030m of Aunli Irrigation Project. ( C.C. Guard wall & Lining )

10.00 8.45 62 P1 / 2015-

16

Trinath Sahu 17.06.2015 16.09.2015 8.45 Work Completed

50.00

2 Improvement to Jaripal Minor from R.D. 1920m to 2050m of Aunli Irrigation Project. ( C.C. Guard wall & Lining )

10.00 8.49 64 P1 / 2015-

16

Anchal Ku. Behera

17.06.2015 16.09.2015 8.48 Work Completed

144.00

3 Repair & Renovations of structures of Dangapal Minor of Aunli Irrigation Project.

8.00 6.85 46 P1 / 2015-

16

Shuvendu Sekhar Pradhan

06.06.2015 05.09.2015 6.85 Work Completed

Repair of 3 No. Falls

Add

l. W

ork Improvement to Nuagaon Minor of Aunli

Irrigation Project. 4.37 118 P1

/ 2015-16

Srinibash Sahu 14.12.2015 12.03.2016 4.35 Work Completed

Total 28.00 28.16 28.13 194.00

Dadaraghati Irrigation Project

1 Construction of C.C. lining from R.D 5746m to R.D 6000m of Dadaraghati Irrigation Project.

10.00 8.47 30 P1 / 2015-

16

Nirakar Mohapatra

03.06.2015 02.09.2015 8.46 Work Completed

254.00

2 Construction of C.C. lining to Tail Distributary of RMC from R.D 401m to R.D 560m & R.D 1025m to R.D 1100m

7.50 8.41 47 P1 / 2015-

16

Biren Ku. Rout 06.06.2015 05.09.2015 8.41 Work Completed

234.00

29| Page

Page 31: [-] Angul Irrigation Division, Angul

of Dadaraghati Irrigation Project.

3 Construction of C.C. lining to RMC from R.D 6775m to R.D 7030m of Dadaraghati Irrigation Project.

10.00 8.46 40 P1 / 2015-

16

Rama Ch. Seth 06.06.2015 05.09.2015 8.46 Work Completed

255.00

4 Construction of C.C. Guard wall from R.D 3450m to R.D 3560m in L.B.C of Dadaraghati Irrigation Project.

10.00 8.45 45 P1 / 2015-

16

Narayan Naik 07.06.2015 06.09.2015 8.20 Work Completed

110.00

5 Construction of C.C. Guard wall from R.D 3393m to R.D 3500m and C.C. lining from R.D 3500m to R.D 3700m of tail Distributary of R.M.C of Dadaraghati Irrigation Project.

9.50 8.48 18 P1 / 2015-

16

Krushna Ch. Sahu

30.05.2015 29.08.2015 8.48 Work Completed

307.00

6 Construction of C.C. Guard wall from R.D 2575m to R.D 2665m & 2735m to R.D 2835m of Tail Distributary of R.M.C of Dadaraghati Irrigation Project.

8.00 8.45 27 P1 / 2015-

16

Samir Ku. Burma 04.06.2015 03.09.2015 8.47 Work Completed

190.00

7 Construction of C.C. Lining from R.D 172m to 229m, 264m to R.D 334m and C.C. Guard wall from R.D 334m to R.D 454m of Tail Distributary of Rangathali Branch Canal of Dadaraghati Irrigation Project.

10.00 8.46 44 P1 / 2015-

16

Narayan Naik 07.06.2015 06.09.2015 8.45 Work Completed

247.00

8 Construction of C.C. lining to Kulei Sub-Branch canal from R.D 20m to 520m of Dadaraghati Irrigation Project.

10.00 8.46 28 P1 / 2015-

16

Benudhar Patra 03.06.2015 02.09.2015 8.45 Work Completed

500.00

9 Construction of C.C. Guard wall from R.D 2650m to 2755m of Rangathali Branch Canal of Dadaraghati Irrigation Project.

10.00 8.43 76 P1 / 2015-

16

Subash Ch. Behera

05.07.2015 04.10.2015 8.43 Work Completed

105.00

10 Renovation of Patuapali Minor of Dadaraghati Irrigation Project.

5.00 4.24 16 P1 / 2015-

16

Bibhuti Bhusan Sethy

28.05.2015 27.07.2015 4.23 Work Completed

84.00

Add

l. W

ork Construction of C.C. Guard wall from

R.D 3393m to R.D 3450m with Bed concrete from R.D 3237m to R.D 3337m of Left Branch Canal of Dadaraghati Irrigation Project.

5.84 101 P1 / 2015-

16

Nirakar Mohapatra

01.10.2015 31.12.2015 5.84 Work Completed

157.00

30| Page

Page 32: [-] Angul Irrigation Division, Angul

Construction of C.C. Bed concrete in between R.D. 7472m to 7533m of R.M.C. of Dadaraghati Irrigation Project.

1.08 91 F2 / 2015-

16

Baneswar Pani Panchayat

01.03.2016 31.03.2016 1.08 -do- 61.00

Construction of C.C. guard wall from R.D. 1439m to 1506m in Tail Distributary of Left Branch Canal of Dadaraghati Irrigation Project.

2.80 101 F2 / 2015-

16

Subash Ch. Behera

04.03.2016 31.03.2016 2.80 -do- 67.00

Construction of C.C. Guard wall from R.D 3610m, 5130m to 5140m, 5230m to 5254m and C.C. Lining from R.D. 5197m to 5212m and 6293m to 6298m of R.M.C. of Dadaraghati Irrigation Project.

0.15 102 P1 / 2015-

16

0.15 Part Payment for Clearance of

Bill

Total 90.00 90.18 89.91 2571.00 Ramial Irrigation Project 1 Improvement to Akhuapal Minor from

R.D. 322 m. to R.D. 700 m of Ramial Irrigation Project ( C.C. Guard wall & Lining )

9.00 7.67 86 P1 / 2015-

16

Santosh Ku. Sahoo

20.07.2015 19.10.2015 7.67 Work Completed

191.00

2 Renovation of Canal syphon at R.D. 55m & Vertical fall at R.D. 275m and Construction of CC Guard wall of Sasapasi Minor of Ramial Irrigation Project

9.00 7.87 90 P1 / 2015-

16

Bira Kishore Das 01.08.2015 31.10.2015 7.87 Work Completed

30.50

3 Improvement to Dangapal Minor from R.D. 895m. to 1200m. of Ramial Irrigation Project ( C.C. Guard wall & Lining )

9.00 7.66 87 P1 / 2015-

16

Balaram Naik 18.07.2015 17.01.2015 7.66 Work Completed

272.50

4 Improvement to Budhibil Minor from R.D. 370 m. to R.D.550 m, and R.D. 1200m to R.D.1400m and Re- sectioning from R.D. 1400m to R.D. 1700m of Ramial Irrigation Project ( C.C. Guard wall & Lining )

9.00 7.65 98 P1 / 2015-

16

Deepak Ku. Nayak

28.09.2015 27.12.2015 7.65 Work Completed

195.00

5 Improvement to Sardhapur Minor of Kanapura Distributary of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 1200 m. to R.D.1300 m and renovation of Canal syphon at R.D.1170 m )

9.00 8.47 25 P1 / 2015-

16

Sanjaya Ku. Behera

03.06.2015 02.09.2015 8.45 Work Completed.

117.00

31| Page

Page 33: [-] Angul Irrigation Division, Angul

6 Improvement to Kanapuara Minor of Kanapura Distributary of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 360m. to R.D. 580m )

8.00 7.86 39 P1 / 2015-

16

Nakula Parida 05.06.2015 04.09.2015 7.83 Work Completed

150.00

7 Improvement to Ragadi Distributary No. I of L.M.C. of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 380 m. to R.D.550 m )

9.00 8.50 51 P1 / 2015-

16

Ranjan Behera 09.06.2015 08.09.2015 8.49 Work Completed

110.00

8 Improvement to Brahmania Minor No.II of Kanapura Distributary of Ramial Irrigation Project ( Renovation of fall at R.D 398m and Canal Syphone at R.D. 495m and renovation of canal )

6.00 5.11 82 P1 / 2015-

16

Gobardhan Rout 10.07.2015 09.10.2015 5.11 Work Completed

84.00

9 Improvement to Khajuria Minor No.II of Khajuria Distribytary of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 00 to R.D.200 m and renovation of slope Fall at R.D.90m & R.D. 238m )

7.00 5.95 48 P1 / 2015-

16

Pradipta Ku. Sahoo

09.06.2015 08.09.2015 5.95 Work Completed

159.00

10 Improvement to Ektali Minor of Kanpura Distribytary of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 410m to R.D.665m )

8.00 7.72 29 P1 / 2015-

16

Sanjaya Ku. Behera

03.06.2015 02.09.2015 7.72 Work Completed

142.00

11 Improvement to Kairatanger Minor of Batagaon Distributary of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 636m to R.D. 750m and renovation of canal syphon at R.D. 750m )

6.00 5.45 23 P1 / 2015-

16

Monalisha Priyadarsani

Parida

03.06.2015 02.09.2015 5.44 Work Completed

88.00

12 Improvement to Kankadahad Distributary No.I from R.D 1400m to 1748 m. of R.M.C. of Ramial Irrigation Project

7.00 5.93 35 P1 / 2015-

16

Pradipta Ku. Sahoo

03.06.2015 02.09.2015 5.93 Work Completed

370.00

13 Improvement to Kankadahad Distributary No.II of from R.D 1550m to 1800.m. R.M.C. of Ramial Irrigation Project

7.00 5.45 99 P1 / 2015-

16

Deepak Ku. Nayak

28.09.2015 27.12.2015 5.45 Work Completed

300.00

32| Page

Page 34: [-] Angul Irrigation Division, Angul

14 Improvement to Kalda Distributary of R.M.C. of Ramial Irrigation Project from R.D. 435m to 800m of Ramial Irrigation Project.

7.00 5.92 37 P1 / 2015-

16

Deepak Ku. Nayak

03.06.2015 02.09.2015 5.90 Work Completed.

360.00

15 Improvement to Rupabeda Distributary of R.M.C. of Ramial Irrigation Project from R.D. 405m to 850m. of Ramial Irrigation Project

6.00 5.12 31 P1 / 2015-

16

Sudhir Nayak 03.06.2015 02.09.2015 5.12 Work Completed

225.00

16 Improvement to Kusumundia Minor of Kandhara distributary of R.M.C. of Ramial Irrigation Project from R.D. 430m to 820m.

6.00 5.06 26 P1 / 2015-

16

Sudhir Nayak 03.06.2015 02.09.2015 5.06 Work Completed

415.00

17 Improvement to Kantapal Minor No.II of Kandhara Distributary of R.M.C. of Ramial Irrigation Project from R.D 1595m to 2100m.

10.00 8.49 57 P1 / 2015-

16

Manoranjan Sahoo

10.06.2015 09.09.2015 8.49 Work Completed

400.00

18 Improvement to Kirtanpur Distributary from R.D 00m to 941m. of R.M.C. of Ramial Irrigation Project

9.00 7.59 36 P1 / 2015-

16

Deepak Ku. Nayak

03.06.2015 02.09.2015 7.59 Work Completed

350.00

Add

l. W

ork Improvement to Odisha Minor from R.D

2030m to 2120m of Ramial Irrigation Project.(Providing C.C Guard wall)

3.98 107 F2/ 2015-

16

Alok Kumar Panda

08.03.2016 27.03.2016 3.98 Work Completed

92.00

Add

l. W

ork Improvement to Khajuria Minor No.I of

Khajuria Distribytary of Ramial Irrigation Project ( Construction of C.C. lining from R.D. 106m to R.D.270 m )

3.61 112 F2/ 2015-

16

Monalisha Priyadarsani

Parida

08.03.2016 27.03.2016 3.51 Work Completed

164.00

Add

l. W

ork Improvement to Odisha Minor of

Kirtanapur Distributary of RMC of Ramial Irrigation Project.(Providing C.C Lining from RD 433m to 533m & 820m to 920m)

3.41 113 F2/ 2015-

16

Deepak Ku. Nayak

08.03.2016 27.03.2016 3.41 Work Completed

200.00

Add

l. W

ork Improvement to Ragadi Distributary No.

I of L.M.C. of Ramial Irrigation Project ( Construction of C.C. Guard wall from R.D. 30 m. to R.D.80 m )

4.15 117 F2/ 2015-

16

Manohar Sahoo 10.03.2016 29.03.2016 4.14 Work Completed

50.00

Total 141.00 138.62 138.42 4465.00 Mechanical work

33| Page

Page 35: [-] Angul Irrigation Division, Angul

50 Repair / Renovation including Painting, greasing and rubber seal changing of Gate works of Ramial Irrigation Project.

4.00 4.00 4.00 Allotment to be diverted to Stores & Mechanical

Divn., Hirakud.

Total 145.00 142.62 142.42 Sapua Badajore Irrigation

Project

1 Construction of C.C. protection wall

from R.D. 1422m to 1482m of RMC of Sapua Badjore Irrigation Project

9.00 7.77 80 P1 / 2015-

16

Debaraj Lenka 10.07.2015 09.10.2015 25.01.2016

7.76 Work completed.

60.00

2 Construction of C.C. protection work from R.D. 1482 m to 1534 m of RMC of Sapua Badjore Irrigation Project

8.00 6.78 68 P1 / 2015-

16

Sudhir Ku. Pati 29.06.2015 28.09.2015 30.01.2016

6.78 Work completed.

52.00

3 Construction of C.C. protection work from R.D. 1534 m to 1586 m of RMC of Sapua Badjore Irrigation Project

8.00 6.77 81 P1 / 2015-

16

Debaraj Lenka 10.07.2015 09.10.2015 25.01.2016

6.75 Work completed.

52.00

Add

l. W

ork

Construction of Guard wall from R.D. 20m to 38m of Rasol Minor, Toe wall from R.D. 670m to R.D. 690m of Left bank of Rasol Minor, Guard wall from R.D. 1400m to 1414m of SLC of Sapua Badjore Irrigation Project

3.75 119 P1 /

2015-16

Saroj Ku. Sahoo 28.01.2016 26.04.2016 3.75 Work Completed

(Part Payment )

Total 25.00 25.07 25.04 164.00 Grand Total 438.00 435.99 437.99

34| Page

Page 36: [-] Angul Irrigation Division, Angul

Status report under 13th F.C. Grant for Maintenance of Roads & Bridges for the year 2015-16

Sl. No.

Name of work Budget Provision in lakh.

Agt. Amount Rs. in lakh

Agt. No.

Agency Date of commencement

Date of completion

Expenditure (Rs. in

lakh) upto 31.03.2016

Remarks Length in Mtr.

1 2 3 4 5 6 7 8 9 10 11 C.E & B.M., BRB, Dhenkanal 1 Improvement to Service Road from R.D.

6.00 km to 6.36km and from R.D. 8.80km to R.D. 10.21km of A.M.C. of Derjang Irrigation Project.

20.00 20.17 77 P1/ 2015-

16

Biranch Dalei 05.07.2015 02.10.2015 20.17 Work completed

1891.00

2 Improvement to Canal Service Road from Apex Building to Karnapal Record Room of Aunli Irrigation Project

10.00 8.49 60 P1/ 2015-

16

Bimal Ch. Behera 16.06.2015 15.09.2015 8.49 Work completed

670.00

3 Improvement to canal service Road from R.D. 4000m to 4600m of R.M.C. of Dadaraghati Irrigation Project.

8.00 7.55 96 P1/ 2015-

16

Nirakar Mohapatra 28.09.2015 27.12.2015 7.54 Work completed

690.00

4 Improvement to canal service Road from R.D. 2990m to 3500m of R.M.C. of Dadaraghati Irrigation Project.

5.00 4.68 97 P1/ 2015-

16

Rama Singh 28.09.2015 27.12.2015 4.68 Work completed

730.00

5 Improvement with Repair & Renovation of Canal Service road form R.D. 00 to 11.00km of L.M.C. of Ramial Irrigation Project

12.00 10.15 33P1/ 2015-

16

Santosh Ku. Sahoo 04.06.2015 01.09.2015 10.14 Work completed

820.00

6 Improvement to Service Road from R.D. 500m to R.D. 1200m of L.M.C. of Sapua Badajore Irrigation Project.

10.00 8.46 92 P1/ 2015-

16

Santosh Ku. Sahoo 26.08.2015 25.11.2015 8.37 Work Completed

875.00

Cle

aran

ce o

f A

rr.B

ills

Improvement to Approach Road from R.D. 00 to 800m of Nuabaga barrage of SBI Project

11.00

8.03 71 P1/ 2014-

15

Manas Ch. Dehury 09.01.2015 31.03.2015 8.03 Clearance of Arrear Bill

Improvement to Service Road from R.D. 00 to 2500m of Santri Minor of Derjang Irrigaiton Project.

8.51 74 P1/ 2014-

15

Bimal Ch. Behera 21.01.2015 31.03.2015 8.51 Clearance of Arrear Bill

Total 76.00 76.04 75.93

35| Page

Page 37: [-] Angul Irrigation Division, Angul

Status report under 13th F.C. Grant for Maintenance of Non Residential Building for the year 2015-16

Sl. No.

Name of work Budget in lakh.

Agt. Amount

Rs. in lakh

Agt. No. Agency Date of commencement

Date of completion

Exp. in lakh) upto

31.03.2016

Remarks

1 2 3 4 5 6 7 8 9 10 1 Improvement to Rest shed at Budhbil of

Ramial Irrigqation Project 5.00 4.24 89 P1/ 2015-

16 Sushanta Ku.

Sahoo 01.08.2015 31.10.2015 4.14 Work Completed

2 Improvement to Office Building of Angul Irrigation Division, Angul (Phase - IV )

17.00 16.93 108 P1/ 2015-16

Manas Ranjan Sahu

23.11.2015 21.03.2016 17.01 Work Completed

Cle

aran

ce o

f Arre

ar B

ill M/R to Section office and Quarter No. E- 4

at Jiridamali of Ramial Irrigation Project. 0.75 Clearance of

Arrear Bill M/R to Rest shed of Angul Irrigation Division (Construction of Compaund Wall)

0.10 -do-

Providing & fixinging Aluminium shutter and Painting to Rest shed of Angul Irrigation Division, Angul. 1.71

1.21 -do-

Renovation to Toilet in Rest shed of Angul Irrigation Division, Angul.

0.50 -do-

Total 23.71 23.71

36| Page

Page 38: [-] Angul Irrigation Division, Angul

ANNEXURE- J

STATUS REPORT UNDER DAM REHABILITATION AND IMPROVEMENT PROJECT (DRIP) FOR THE YEAR 2015-16 Sl. No.

Name of work Budget in lakh.

Agt. Amount

Rs. in lakh

Agt. No. Agency Date of commencement

Date of completion

Exp. in lakh) upto 31.03.2016

Remarks

1 2 3 4 5 6 7 8 9 10 Derjang 1 Improvement to Derjang Irrigation Project

under the Dam Rehabilitation and Improvement Project (DRIP).

194.53 165.55 NCB/ DRIP- 49 F2/ 2015-

16

Anil Kumar Sahoo 16.10.2015 15.12.2016 58.77 Work in progress

2 Improvement to Derjang Irrigation Project under the Dam Rehabilitation and Improvement Project (DRIP) (Package-02).

274.76 262.37 - Sri Muna Pani - - - Agreement to be Drawn

Sapua 469.29 427.92 58.77 1 Improvement to Sapua Badjore Irrigation

Project DRIP 525.96 444.38 NCB/ DRIP-

63 F2/ 2015-16

Sri Muna Pani 09.12.2015 06.05.2017 115.62 Work in progress

2 Improvement to Sapua Badajore Irrigation Project under DRIP (Package-02).

250.19 207.03 NCB/ DRIP- 90 F2/ 2015-

16

Ashok Kumar Meher 17.02.2016 15.02.2017 35.61 Work in progress

Total 776.15 651.41 151.23

Grant total 1245.44 1079.33 210.00

37| Page

Page 39: [-] Angul Irrigation Division, Angul

ANNEXURE- K

ABSTRACT Status of works under Angul Irrigation Division for the year 2015-16 ( As on 31.03.2016)

(Rs. in lakh)

Name of scheme Name of Division/ Project

No. of work

Total Budget

Provision

Received Allotment

Total Expenditure

upto 31.03.2016

Remarks

C.E. & B.M., L.M.B., BBSR.

Maintenance of Critical Flood Control Works (River Embankment) 20-2711-01-800-1214-21087

Angul Irrigation Division

10 + 2 90.00 90.00 90.00 10 Nos. - Work completed Additional Work 2 Nos. - Work completed

13th Finance

Maintenance of Roads & Bridge 20-3054-80-800-2450-21033

Angul Irrigation Division

3 22.00 22.00 22.00 3 Nos. - Work completed

STATE PLAN

Flood Control Scheme 20-4711-01-103-0101-37107 / 37217 / 789 / 796

Angul Irrigation Division

20 + 4 270.00 270.00 270.00 20 Nos.- Work completed Additional Work 4 Nos. - Work completed

Flood Fitening 20-4711-01-103-0101-37293

Angul Irrigation Division

4 3.97 3.97 3.97 Work completed

Restoration work - 20-4711-01-103-0101-37217-000

Angul Irrigation Division

5 230.00 207.96 207.95 5 Nos. - Work Completed

Total 503.97 481.93 481.92

Maintenance of River Embankment - M/R (Wages & Work charged Estt / Works,) 20-2711-01-800-1214-02001-03001-21033 /21111 / 21112 /21154 / 31003

Angul Irrigation Division

Work 50.00 50.00 50.00 Repair & Maintenance works with

Wages & Work charged establishment

Expenditures Esst. 20.60 20.60 20.44

70.60 70.60 70.44

Total 686.57 664.53 664.36

38| Page

Page 40: [-] Angul Irrigation Division, Angul

Status report under Critical Lump for the year 2015-16 (River Embankment)

( Demand No. 20-2711-01-800-1214-21087 )

Sl. No.

Name of work Budget Provision in lakh.

Agt. Amount Rs. in lakh

Agt. No.

Agency Date of commence

ment

Date of completio

n

Expenditure (Rs. in lakh)

upto 31.03.2016

Remarks Achivement

1 2 3 4 5 6 7 8 9 10 11 1 Protection to scoured bank on Brahmani left

near village Kirtanpur of Bhuban block. 7.00 6.23 38 P1 /

2015-16

Jayanta Ku. Rout

04.06.2015 03.09.2015

6.22 Work completed

Launching -90m

2 Raising and strengthening of O.A.E. on Brahmani left from Chandipal to Mahulpal from RD. 2.00 km to RD. 3.00 Km.

12.00 11.65 34 P1 / 2015-

16

Chandra Sekhar Rout

03.06.2015 31.08.2015

11.63 Work completed

Raising & Srengthning - 1.00km

3 Protection to scoured bank on both side of River Ramial near Irrigation Office in village Kankadahad.

8.00 6.00 66 P1 / 2015-

16

Rasmi Ranjan Khuntia

2306.20 22.09.2015

5.97 Work completed

Spur -1 No. Launching -15m

4 Protection to scoured bank on Brahmani left near village Odhana of Bhuban block.

9.00 7.33 11 P1 / 2015-

16

Susanta Ku. Behera

12.05.2015 11.08.2015

7.33 Work completed

Warth work - 90m

5 Protection to scoured bank on Sirimula nallah (Tributary of Brahmani left) near village Tumusinga.

8.00 6.88 24 P1 / 2015-

16

Jyoti Sankar Sahoo

03.06.2015 02.09.2015

6.87 Work completed

Earth work - 65m Packing-Launching- 65m

6 Protection to scoured bank on Brahmani left near village Basulei of Parjang Block.

10.00 8.48 12 P1 / 2015-

16

Trilochan Rout 22.05.2015 21.08.2015

8.48 Work completed

Gully filling - 35m Launching - 94m

7 Improvement to O.A.E. on Brahmani right from Sankulei to Naganahill from R.D. 4.50Km. to R.D. 5.15Km.

8.00 7.83 04 P1 / 2015-

16

Priyabrata Khuntia

01.05.2015 31.07.2015

7.82 Work completed

Earth work - 430m Mooum toping - 600m

8 Protection to scoured bank on Brahmani right at Raneswar Temple near village Dhalpur of Odapad Block

8.00 6.80 05 P1 / 2015-

16

Kausalya Bhoi 01.05.2015 31.07.2015

6.80 Work completed

Spur - 15m - 1 No. Launching - 3m

9 Protection to scoured bank on Brahmani right near village Brundabanpur of Gondia Block.

10.00 8.49 06 P1 / 2015-

16

Abhimanyu Sethi

08.05.2015 07.08.2015

8.49 Work completed

Launching -86m

10 Protection to scoured bank on Bauli Left near village Inkarabandha (Launching apron to D/S of Spur No.5).

10.00 8.46 19 P1 /

2015-16

Saroj Ranjan Samanta Singhar

31.05.2015 30.08.2015

8.46 Work completed

Spur - 6m -1 No. Launching - 30m

11 Protection to scoured bank on Ramial Left near village Marthapur (D/S of R.D. Bridge) of Bhuban Block. A

ddl.

Wor

k 6.78 115 P1 / 2015-

16

Saroja Sahoo 10.12.2015 08.03.2016

6.78 Work completed

Launching - 60m

39| Page

Page 41: [-] Angul Irrigation Division, Angul

12 Protection to scoured bank on Sapua Right near village Baliborei of Odapada Block.

4.76 109 P1 / 2015-

16

Bikram Ku. Satapathy

26.11.2015 23.02.2016

4.74 Work completed

Launching - 44m

Improvement to scoured bank on Brahmani Left near village Odhana.

Cle

aran

ce o

f Bill

0.22 0.22

Improvement ot T.R.E. on Ramial Left near village Balisahi

0.13 0.13

Improvement ot M.F.E. on Brahmani Right near village Parbatakani.

0.06 0.06

Total 90.00 90.10 90.00

Status report under 13th F.C. Grant for Maintenance of Roads & Bridges for the year 2015-16

( Demand No. 20-3054-80-800-2450-21033-000) Sl.

No. Name of work Budget

Provision in lakh.

Agt. Amount Rs.

in lakh

Agt. No. Agency Date of commencement

Date of completion

Expenditure (Rs. in lakh)

upto 31.03.2016

Remarks Achivement

1 2 3 4 5 6 7 8 9 10 11 C.E & B.M., LMB, Bhubaneswar

1 Improvement to Service road on Brahmani Left from Kamagara to Jhagadapada from 2.00 km to 2.50 km.

7.00 6.00 83 P1 / 2015-16

Jyoti Sankar Sahoo

14.07.2015 13.10.2015 6.00 Work completed

Earth work & Moorum toping

2 Improvement to Service road on Ramial Left from Origaon to Khantakhol from 1400m to 1800m.

7.00 6.89 15 P1 / 2015-16

Deepak Ku. Nayak

27.05.2015 26.08.2015 6.88 Work completed

Earth work & Moorum topping- 400m

3 Improvement to Service road on Brahmani Right from Sankulei to Naganahill from R.D. 4.00 km to 5.00 km. (Working R.D. 3300m to 3680m).

8.00 7.32 78 P1 / 2015-16

Nakula Parida 06.06.2015 05.10.2015 7.30 Work completed

Moorum toping - 380m

4 Improvement to service road from Chandipal to Mahulpal RD 2975 m to 3310 m.

2.09 111 F2 / 2015-16

Jayanta Ku. Rout

08.03.2016 27.03.2016 1.81 Work completed

Total 22.00 22.30 21.99

40| Page

Page 42: [-] Angul Irrigation Division, Angul

Status report under Flood Control State Plan for the year 2015-16 (River Embankment) Demand No. 20-4711-01-103 / 789 / 796 -0101-37107 (Rs. in

lakh) Sl. No.

Name of work Budget Provision in lakh.

Agt. Amount Rs. in lakh

Agt. No.

Agency Date of commencement

Date of completion

Expenditure (Rs. in lakh)

upto 31.03.2016

Remarks

1 2 3 4 5 6 7 8 9 10 1 Protection to scoured bank on Brahmani left near

village Prachandapur of Bhuban block. 20.00 19.28 42 P1 /

2015-16 Tukun Dalei 06.06.2015 03.09.2015 19.28 Work completed

2 Protection to scoured bank on Brahmani left near village Malapura (Construction of 2nd spur on U/S) of Bhuban block.

30.00 25.94 59 P1 / 2015-16

Srinath Ku. Mishra 16.06.2015 13.10.2015 25.92 Work in progress

3 Construction of flood protection embankment along Kalabila nallah (U/S side of bridge ) near village Kusia of Kamakhyanagar Block.

20.00 17.10 14 P1 / 2015-16

Prasanna Ku. Jena 27.05.2015 24.08.2015 17.10 Work completed

4 Protection to scoured bank on Brahmani left near village Kamagara (D/S of bridge).

20.00 17.12 58 P1 / 2015-16

Madhabananda Marandi

12.06.2015 09.09.2015 17.12 Work completed

5 Protection to scoured bank on Ramial right near village Pimpala of Kamakhyanagar Block.

10.00 8.45 07 P1 / 2015-16

Parameswar Sahoo 08.05.2015 07.08.2015 8.44 Work completed

6 Protection to scoured bank on Brahmani right near village Majhipal of Gondia Block.

10.0 8.47 01 P1 / 2015-16

Dharmananda Biswal 01.05.2015 31.07.2015 8.46 Work completed

7 Protection to scoured bank on Brahmani right near village Dalar under Mandar G.P

20.00 17.68 65 P1 / 2015-16

Abhimanyu Sethy 19.06.2015 16.09.2015 17.67 Work completed

8 Protection to scoured bank on Sapua right near Mandapa Sahi of village Panamuruga of Odapada Block.

10.00 8.46 13 P1 / 2015-16

Satyabhama Behera 22.05.2015 21.08.2015 8.46 Work completed

9 Protection to scoured bank on Lingara right near village Angarbandh. (Construction of launching apron on U/S of Mahimagadi).

10.00 8.48 55 P1 / 2015-16

Bimal Ch. Behera 10.06.2015 09.09.2015 8.46 Work completed

10 Flood protection works to River Aunli near village Tangiri in Chhendipada Block

20.00 18.95 63 P1 / 2015-16

Amiya Ku. Behera 17.06.2015 14.09.2015 18.93 Work completed

11 Protection to scoured bank of Demphajore nalla near Balikiara in village Badatribida of Kaniha Block.

10.00 8.50 69 P1 / 2015-16

Pramod Behera 30.06.2015 29.09.2015 8.50 Work completed

12 Protection to scoured bank of river Bauli Right near village Phulapada ( Protection to existing guard wall ) of Banarpal Block

10.00 8.48 54 P1 / 2015-16

Bimal Ch. Behera 10.06.2015 09.09.2019 8.48 Work completed

41| Page

Page 43: [-] Angul Irrigation Division, Angul

13 Construction of protection wall of Kumbaria Nalla near Shiva Temple of Chhendipada

10.00 8.50 52 P1 / 2015-16

Sangeeta Garnayak 09.06.2015 08.09.2015 8.50 Work completed

14 Protection to scoured bank of river Brahmani right near village Karamula of Gondia Block.

10.00 8.46 17 P1 / 2015-16

Dharmananda Biswal 28.05.2015 27.08.2015 8.41 Work completed

15 Protection to scoured bank of river Sapua right near village Brundabanapur of Odapada Block

10.00 8.49 02 P1 / 2015-16

Dibakar Naik 01.05.2015 31.07.2015 8.49 Work completed

16 Protection to scoured bank on Brahmani right near village Parbatakani of Gondia Block

10.00 8.50 08 P1 / 2015-16

Dillip Ku. Sethy 08.05.2015 07.08.2015 8.49 Work completed

17 Protection to scoured bank on Brahmani right near village Nuapada of Dhenkanal Sadar Block

10.00 8.48 03 P1 / 2015-16

Kausalya Bhoi 01.05.2015 31.07.2015 8.48 Work completed

18 Protection to scoured bank on Ramial Left on U/S of R.D. Bridge at Jamunakote of Bhuban Block

10.00 8.43 09 P1 / 2015-16

Pradipta Ku. Sahoo 08.05.2015 07.08.2015 8.42 Work completed

19 Protection to scoured bank on Ramial left near village Mandapal of Bhuban Block

10.00 8.45 21 P1 / 2015-16

Ranjit Sahoo 01.06.2015 31.08.2015 8.44 Work completed

20 Protection to scoured bank on Brahmani left near village Surapratapapur of Bhuban Block

10.00 8.41 10 P1 / 2015-16

Jitendra Nayak 11.05.2015 10.08.2015 8.40 Work completed

21 Protection to scoured bank on Ramial Left near village Odhana of Bhuban Block.

8.80 11 P1 / 2015-16

Susant Ku. Behera 03.12.2015 01.03.2016 8.79 Work completed

22 Protection to scoured bank on river Sapua Left near village Similipatana of Dhenkanal Sadar Block.

8.49 106 P1 / 2015-16

Satyabhama Behera 20.11.2015 17.02.2016 8.49 Work completed

23 Protection to scoured bank on Sapua Right near village Panamuruga (Talapala Sahi ) of Odapada Block

8.30 107 P1 / 2015-16

Satyabhama Behera 20.11.2015 17.02.2016 8.30 Work completed

24 Protection to scoured bank on Ramial right near village Arakhapal of Bhuban Block.

8.02 111 P1 / 2015-16

Srinath Ku. Mishra 01.12.2015 28.02.2015 8.02 Work completed

Protection to scoured bank on Brahmani Right near village Parbatakani from 00 to 27.50m (D/S of Spur No.-I ) of Gondia Block.

1.95 1.95

Total 270.00 270.19 270.00

42| Page

Page 44: [-] Angul Irrigation Division, Angul

Status report under State Plan ( Restoration work ) for the year 2015-16 (Rs. in lakh)

Sl. No.

Name of work Budget Provision in lakh.

Agt. Amount Rs.

in lakh

Agt. No. Agency Date of commencement

Date of completi

on

Expenditure (Rs. in lakh) upto 31.03.201

6

Remarks Achivement

1 2 3 4 5 6 7 8 9 10 11 1 Protection to scoured bank on Brahmani Left

(Confluence point of River Brahmani & Ramial) near village Odhana.

48.00 41.62 93 P1 / 2015-16

Prativa Sahoo 23.09.2015

19.02.2016

41.62 Work completed

Spur - 1 No. Launching -100m

2 Protection to scoured bank on Brahmani Left near village Prachandapur of Bhuban Block (Construction of 2nd Spur).

35.00 32.28 94 P1 / 2015-16

Chandra Sekhar Rout 01.10.2015

27.02.2016

32.27 Work completed

Spur -1 No. Launching -10m

3 Protection to scoured bank on Ramial right near village Sasaposi.

25.00 21.30 100 P1 / 2015-16

Dharmananda Dash 01.10.2015

28.01.2016

21.29 Work completed

Launching -10m

4 Protection to scoured bank on Ramial Left of M.F.E. from Origoan to Khantakhol at R.D 900m to R.D 1100m near village Mathakaragola of Bhuban Block.

22.00 20.69 95 P1 / 2015-16

Shreekanta Parida 01.10.2015

28.01.2016

20.67 Work completed

Launching -180m

Extra Protection to scoured bank on Ramial Left near village Mathakaragola U/S of RD Bridge in Bhuban Block

4.51 4.40 116 P1 / 2015-16

Deepak Kumar Nayak

10.12.2015

08.03.2016

4.39 Work completed

Launching - 50m

Extra Protection to scoured bank on Ramial right near village Jamuanakote of Bhuban Block.

9.60 8.53 112 P1 / 2015-16

Sushanta Ku. Behera 03.12.2015

01.03.2016

8.53 Work completed

Lauching -93m

130.00 128.82

5 Construction of flood protection work of Ramial right from Badura to Sanabarahmpur including drainage sluice.

100.00 100.00 103 P1 / 2015-16

Akbar Mohammed 09.11.2015

08.10.2016

79.18 Work in Progress

Embankment . -1.26km Sluice - 1 No.

Total 230.00 228.82 207.95

43| Page

Page 45: [-] Angul Irrigation Division, Angul

ANNEXURE- L

PROGRESS REPORT OF INDUSTRIAL WATER RATE FOR THE YEAR 2015-16 IN FAVOUR OF ANGUL IRRIGATION DIVISION

Target for the Year 2015-16 : Rs. 4406 Lakhs (including arrear)

Collection for the Year 2015-16 : Rs. 8425.381 Lakhs (including arrear) Sl. No.

Name of Industry / Commercial

Establishments

Source of Drawal

Allocated Qnty. In cusecs

(Mention last date of

validity)

Agreement No. & Date

(Mention last date of

validity)

Agree -ment Qnty

(cusec)/ cum

Installation

of flow meter (Yes/No)

Actual

drawal

Qnty. (Cum

)

Unit water rate

(Rs./cum)

Details of Demand Notice Cummulative Collection for the Financial Year

Remarks

Current

Demand

Arrear including interest

& penalty

Total Demand (10+11)

Current

Demand

Arrear Demand

Total

1 M/s Aryan Energy (P) Ltd.

Rain water harvesting

pond

Recommended 0.035

(90cum/day)

Agreement No-04(IW)of 2015-2016 Valid upto 30.09.2018.

2610 Yes 1566 3.40 0.089 . 0.089 1.115 1.115 60th WAC recommended 0.035 cusec

water to Govt. for allocation.

2 M/s Bindal Spange Ltd., Talcher.

River Brahmani

0.810 (2000cum/day)

02(IW) 2005-06

dt.04.03.06 Valid upto 03.03.09

58000 Yes 20.40 (6

time penal rate)

11.832 1065.499 1077.331

0.000

3 Ganesh Spange (P) Ltd., Angul

Ground water

Not Allocated No. Agt. 4060 Yes 4124 6.80 0.280 0.280 2.397 2.397

M/s Global Coal & Mining Ltd., Talcher

Rain water harvesting

pond

Not Allocated 05(IW) 2015-16

dt.28.12.15. Valid

upto29.10.18.

3770 Yes 1784.60

3.40 0.128 0.128 2.157 0.137 2.294 60th WAC recommended 0.053 cusec

water to Govt. for allocation

5 Jindal India Thermal Power Ltd., Talcher

Ground water

182.751 182.751 0.000 2% compound interest has

been charged on arrear dues.

44| Page

Page 46: [-] Angul Irrigation Division, Angul

6 M.C.L., Talcher. River Brahmani

Allocated by Tahasildar,

Talcher 18.580 cusec

01(IW)2000-01

dt.08.06.2000 Valid upto

2003

1316600

No 27.00 (6

time norm

al rate)

355.482

35290.135

35645.617

5100.000

5100.000

Payment made in favour of E.E Main

Dam Division, Burla vide Letter No-

3384 dt30.03.2016.

of MCL 7 Monet Ispat &

Power Ltd., Angul.

Rain water harvesting

pond

50 cum/day upto

December' 2015

Valid upto 31st

December-2015

Agt. No. 01(IW) 2015-

16 dt.21.08.15.

Yes 0.214 0.214 0.214 0.214 Demand Amount

Adjusted from adv. Payment

8 NALCO, Angul. River Brahmani

Not Allocated No. Agt. 3500000

Yes 3298796

4.50 157.500

43900.576

44058.076

1890.000

764.999 2654.999

9 Rana Spange Ltd. Gambharia Nallah & Ground water

0.000 0.000

10 TTPS(NTPC), Chainpal, Talcher

River Brahmani

16.490 02 (IW) / 2013-14

dt.11.06.13

1169802

Yes 1033970

4.50 52.641 52.641 664.362

664.362

Total 578.166

80438.961

77138.703

2560.245

5865.136

8425.381

45| Page

Page 47: [-] Angul Irrigation Division, Angul

ANNEXURE- M

LIST OF PENDING COURT CASES OF ANGUL IRRIGATION

DIVISION

Status of the Court Cases Regarding Pensionary Benefits under W/C Establishment of Angul Irrigation Division, Angul

Sl. No.

Case No. Name of the Applicant with Designation

Subject Status of the Case Remarks

1 2 3 4 5 6 1 O.A. Case

No.2036 ( C) / 2010

Sri Srikanta Kumar Sahu

Service Regularisation &

Pensionary Benefits

Approved counter submitted to the Govt.Advocate O.A.T.Cuttack vide

T.O.Letter No.1651/WE dt.03.04.2014.

2 O.A. Case No.2035 ( C) / 2010

Sri Gopinath Nayak Service Regularisation &

Pensionary Benefits

Approved counter submitted to the Govt.Advocate O.A.T.Cuttack vide

T.O.Letter No.1648/WE dt.03.04.2014.

3 O.A.Case No.3707/201

3

Smt. Arati Behera W/O Late Sri

Gangadhar Behera

Service Regularisation &

Pensionary Benefits

Approved counter submitted to the Govt.Advocate O.A.T.Cuttack vide

T.O.Letter No.253/WE dt.20.01.2015.

4 O.A.Case No.4195 (C)/2013

Sri Kangali Charan Das

Service Regularisation &

Pensionary Benefits

Approved counter submitted to the Govt.Advocate O.A.T.Cuttack vide

T.O.Letter No.105/WE dt.08.01.2015.

5 O.A. No.2183(C

)/2013

Sri Ramesh Chandra Rout

Service Regularisation &

Pensionary Benefits

Approved Addl. counter submitted to the Govt.Advocate O.A.T.Cuttack vide

T.O.Letter No.5375/WE dt.25.07.2015.

6 O.A. No.927 /2008

Sri Sarbeswar Swain Service Regularisation &

Pensionary Benefits

Correspendance has been made to the Prinicpal Secretary to Govt. ,DOWR, Odisa,

BBSR against his Writ Pitition vide this office Ltr. No.3586/WE dt.04.06.2008

7 O.A. No.2040/200

1

Sri Rabinarayan Mishra

Service Regularisation &

Pensionary Benefits

Submission of the Xerox copy of the Original Service Roll to Govt. Advocate, Cuttack

Bench , Cuttack vide this office ltr. No.230/WE dt.08.01.2009

8 O.A.Case No.340 (c)/2008

Sulachana Das Service Regularisation &

Pensionary Benefits

Submission of Approved Counter to Govt. Advocate, O.A.T. Cuttack Bench Cuttack vide T.O. Ltr. No.6067/WE dt.12.09.2008.

9 O.A.Case

No.339 (c)/2008

Sri Bhaskar Rout Service Regularisation &

Pensionary Benefits

Submission of Approved Counter to Govt. Advocate, O.A.T. Cuttack Bench Cuttack vide T.O. Ltr. No.6062/WE dt.12.09.2008.

10 O.A. Case

No.1490/2008

Sri Laxmidhar Mohapatra

Service Regularisation &

Pensionary Benefits

Draft Reply to Submitte to Govt. Advocate O.A.T , BBSR T.O Lr.738/WE dt.14.02.2013

& the case has not listed so far for hearing

11 O.A. Case No.38/2011

Sri Maghaban Mishra Service Regularisation &

Pensionary Benefits

Submitted of Greadtion list defunct Sapua Badjore Irrigation Division to Govt. Advocate O.A.T, Bhubaneswar T.O.

Lr.5535/WE dt.14.10.2011 12 O.A. Case

No.2241 (C)/2008

Sri Pradeep Kumar Singh

for service Continuity & Payment of Back Wages

P.W.C. submitted to Govt. D.O.W.R.ODISHA,BBSR vide Letter

No.9255/WE dt.21.11.2009 of E.I.C.W.R.,BBSR

13 O.A. Case No.2375 (C

)/2014

Sri Debananda Bhutia Revised Pay Benefit

Approved Counter sumitted to EIC,Wr,BBSR T.O. Lr. No.1878/WE

dt.12.03.2015 & Govt. Advocate Vide T.O. Ltr. 1165/WE dt.25.02.2015

46| Page

Page 48: [-] Angul Irrigation Division, Angul

14 O.A. Case No.2376 (C

)/2014

Sri Suresh Kumar Sahu

Revised Pay Benefit

Approved Counter sumitted to EIC,Wr,BBSR T.O. Lr. No.1870/WE

dt.12.03.2015 & Govt. Advocate Vide T.O. Ltr. 1170/WE dt.25.02.2015

15 O.A. Case No.347 (C

)/2008

Sri Dakhya Kumar Das

Service Regularisation &

Pensionary Benefits

Submitted Addl. Approved Counter to Govt. Advocate O.A.T. Cuttack vide ltr.

No.7083 dt.14.10.2015

16 O.A. Case No.850(C

)/2008

Sri Dushasan Rout Service Regularisation &

Pensionary Benefits

Submitted Addl. Approved Counter to Govt. Advocate O.A.T. Cuttack vide ltr.

No.3640 dt.28.05.2015

17 O.A. Case No.1606/201

5

Sri Jatadhari Majhi Service Regularisation

Incremental Benefits

Submission of Para wise Comment to the S.E.A.I.C.Angul vide T.O. Ltr. No.5476/WE

dt.30.07.2015 & Govt. Advocate No.5480 dt.30.07.2015.

18 O.A.No-2217/99

Misc.case No.223/2015

Ratani Sahoo Service Regularisation &

Pensionary Benefits

Submission copy of substitution petition of Misc.case No.223 of 2015 of Ratani Sahoo as party in place of Late Jugal kishor Sahoo,Ex-

Amin to the E.I.C.W.R.ODISHA,Bhubaneswer vide T.O.Letter No.5963/WE dt.25.08.2015

19 O.A.Case No.2171/201

5

Haramohan Nanda Service Regularisation &

Pensionary Benefits

Approved Counters submitted to OAT Bhubaneswar on 11.08.2016

20 M.S.

No.7404 of 2015

Sri Durga Charan Dash

Claimed price escalation &

release of withheld amount

Approved Counters filed in the office of Sr. Judge, Bhubaneswar

STATUS OF THE COURT CASES REGARDING WATER TAX OF ANGUL IRRIGATION DIVISION, ANGUL

Sl. No. Case No. Name of the

Applicant with Designation

Subject Status of the Case Remarks

1 2 3 4 5 6 1 OJC Case

No.3783/1994 NALCO

Protest by the Industries

against Water Rate

Case Pending Hon'ble High Court at Full Bench hearing (Chief Engineer Water Services is looking after the

Case 2 OJC Case

No.1149/1995 3

WPC (C ) Case No.18907/2014

M/S Ganesh Sponge Ltd

Protest by the Industries

against Water Rate

Interim order passed by Hon'ble High court, Cuttack So that the Company to Deposit the Water Rate minus penalty & to Draw the Agreement subject to full fillment of water management &

water Stroage Plan. 4

WPC(C ) Case No.18971/2015

Jinal Steel & Power LTD

Protest by the Industries

against Water Rate

Approved Counter Submitted to Hon'ble High Court for Judgement

5 WPC(C ) Case

No.745/2014 M/S Mahanadi Coal field LTD

and another Vrs-State of Odisha

and Others

Protest by the Industries

against Water Rate

Order passed by Hon'ble High court, Cuttack to Submit Show Cause Notice to MCL why the company will not pay the appropriate Demand raised by the

Department & the Notice has been Served.

47| Page

Page 49: [-] Angul Irrigation Division, Angul

Status of the Contempt Cases of Angul Irrigation Division, Angul Sl.

No. Case No. Name of the

Applicant with Designation

Subject Status of the Case Remarks

1 2 3 4 5 6 1 SLP (C) No.3833

/ 2015 arrising to W.P. C

No.19550/2011

Sri Chandra Nadi Service Regularisation & Pensionary Benefits

Appealed at Supreme Court of India on

dt.24.10.2014 vide SLP (C) No.3833/2015

------

48| Page