© 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor: Edward Szmit Presenter: Daniel Czarkowski Polski Rejestr Statków S.A. Electrical and Automation Department Gdańsk, POLAND Conference “Aeronautics and surface transport days” 11-12 April 2005, Warsaw

© 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

Embed Size (px)

Citation preview

Page 1: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

© 2005 PRS S.A.

Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control

Project supervisor: Edward SzmitPresenter: Daniel Czarkowski

Polski Rejestr Statków S.A.Electrical and Automation Department

Gdańsk, POLAND

Conference “Aeronautics and surface transport days”11-12 April 2005, Warsaw

Page 2: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

2© 2005 PRS S.A.

Ship electric power system

Page 3: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

3© 2005 PRS S.A.

Electromagnetic disturbances in a ship’s power network

380

400

420

440

460

U [V]

time [min.]0 41 2 3

Un=11%

59

59.5

60

60.5

61

f [Hz]

time [min.]0 41 2 3

fn=1,6%

Page 4: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

4© 2005 PRS S.A.

Voltage distortion

-400

-300

-200

-100

0

100

200

300

400

U [V]

time [s]

THD=4,4%

How to measure power quality?

TotalHarmonicDistortion

-800

-600

-400

-200

0

200

400

600

800

U [V]

time [s]

THD=13,5%

Un=220 V

Un=440 V

Page 5: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

5© 2005 PRS S.A.

From deviations to losses

Effects of the occurrence of voltage and current higher harmonics in electric power systems are as follows:

additional power losses in machines, transformers etc., additional power losses In capacitors and coils, dropping accuracy of measuring instruments, occurrence of mechanical vibrations.

What is the reason for calculating THD?

disturbances in power network

perturbs of devices

failurehazard conditions

on a ship

human lives at riskeconomical lossesdanger of pollution

Page 6: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

6© 2005 PRS S.A.

Classification societies:

International standard IEC 60092-101:2001 Electrical installations in ships - Part 101: Definitions and general requirements:

– THD ≤ 5%

– voltage deviations -10% +6%

– frequency deviations ±5%

– and other factors

Requirements

PRS LR DNV ABS GL

THD 10% 8% 10% 5% 10%

Different requirements?

Page 7: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

7© 2005 PRS S.A.

Results of measurements

type of parameter

THD required by classification

societies

mean THD measured on

a ship

maximum

THD

requirements

/ results5-10% 12-19% 24%

Electronic power converters in power consumer system are often installed on ships, e.g. Queen Mary II.

Ships’ main propulsion systems are more often electric.

Converters cause worse power quality.

Ship technology changes, what about requirements?

Page 8: © 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:

© 2005 PRS S.A.

The aim of the project is realisation of ship’s electric power systems based on a choice of appropriate and effective technical solutions as well as on elaboration of algorithms and procedures of proceedings under hazard conditions.

Thank you for your attention

Any further questions please contact me:

[email protected] or project supervisor: [email protected]