1
Date of lesson What scenes are being filmed Where will filming take place What crew and cast are needed What props and costumes are needed What equipment is needed October 24 th 2013 1,2 Main hall stage, main hall corridor and sixth form Brooke, Libby and Jozie Foam gun Tripod and cannon 1100d October 25 th 2013 3 Technology block Brooke and Jozie none Tripod and cannon 1100d Novembe r 4 th 2013 4 Geography mirror English block staircase Brooke, Jozie and Luke Foam gun Tripod and cannon 1100d

Production schedule

Embed Size (px)

Citation preview

Page 1: Production schedule

Date of lesson

What scenes are being filmed

Where will filming take place

What crew and cast are needed

What props and costumes are needed

What equipment is needed

October 24th 2013

1,2 Main hall stage, main hall corridor and sixth form

Brooke, Libby and Jozie

Foam gun Tripod and cannon 1100d

October 25th 2013

3 Technology block

Brooke and Jozie

none Tripod and cannon 1100d

November 4th 2013

4 Geography mirror English block staircase

Brooke, Jozie and Luke

Foam gun Tripod and cannon 1100d