Upload
orkunbeydagi
View
231
Download
2
Embed Size (px)
DESCRIPTION
Citation preview
IndividualsAT HOMElittle e�ect over the boundary more e�ect over the boundary
with social interaction
OUTSIDE
body gesturesclothes...
digital personal background
+
building
ground level
underground
three of these conditions de�nes what kind of activity will be held in the area. They are the physical boundaries that form with human activities and de�ne them.
in between - no programfor meetings - games - ...public space
people come together in city in di�erent patterns, which is changing upon time
people always get together for activities - however - as location based social networks arise, the chance of getting together for activities with the
people we don’t know yet, becomes an important point
city turns into a big scene of unintended activities
worldtransformsitselfwhat would be the new typology and (topology) of public
space in the time of location based social networks
deforming city fabric
sections in di�erent states
di�erent states checkin data
shorter buildings - scattered layout
taller buildings - denser population - gathered layout
shorter buildings - larger streets - pointed layout
two instances of the density of people
P 1
possible other designes from di�erent particle clouds
the instantenously created space will stay after the activity has been changed. almost like for a week period space will remain and the other activities will join and make the space grow through those new activities
growing space
distributed art institutionthere will be no information storage that we learn about things, but only a constant experience that produces new information each time
i m dealing with interactivity - try to create a new communication method between people through geometries
related to that interactive performance, I shaped this sculpture as a solid form of the di�erent states changed in the transformation
this changing shape on the facade seems interesting
�oor / ceiling interaction is what I intented to show for negotiation of boundary between neighbours
particles invisible visible
particlespolarized
- +- - + +
+
+ - -- -
--
----
-
-+
+
++
++
+
+
+
charge
charge
charge
attractors
attractors
attractors
notr
notr
notr
notrnotr
-
-
-
-
+
+
+
+
+
there are n points
when a user charge a surface in city and particles start to accumulate over that surface
--
-------- --------- ---------- --------
- -
-2+1
-2+1
-2+1
-2+1
the bond are formed between two sets of particles
depending on the distance between particles the radius of the particles
changes and the strength of the bond
bonds
n/2 n/2
1 3 5 7 ---- 2 4 6 8 ----*particle number
P 2
polarized
soundsample generation
manipulationtransmission
wind
external sound
receiver
vibration
vibration
bacteriasde�ning pH degree
paintingcolor receiving
gradientcolor fog
water - culture institution in meatpackingP 3
digital fabrication - exhibition wallP 4
Parameter A: manipulation of the two surfaces
Parameter B: determination of the layers in Z-axis
The parametric exhibition wall, change it’s shape accordingly to the manipulation of two surfaces, in direct relation.
surface A
surface B
Assembly method
fibrous structuresP 5
P 6life proposal in kadikoy
Boğaziçi University Life Sciences BuildingŞANAL architecture - planning
My role is to get involved into the design and developing BIM system for the design process of the Science and Technology Center building.A campus to inspire the scienti�c mind set in the natural ecology of the Bophorus.Context of multi-disciplinary research and innovation for the 21st Century: RASATHANE SCIENCE & TECHNOLOGY CAMPUS is envisioned as a mix of university long-term research and advancement of knowledge application to end-users. This new campus plan in the Üsküdar Rasathane peak unites the ongoing pursuits and goals of BOGAZICI UNIVERSITY and Istanbul Greater Municipality’s aspiration to revitalize the urban cores. The master plan for the 300,000+ m2 campus calls for a multiple phased full build-out of 30,000 m2 of project based research, laboratories, learning areas, communi-cation areas, social life, visitor areas, cultural activities and open space. The plan for BUKK combines an intricate play between urban design, architecture and complex programmatic requirements of specialized advanced research and social-life. The designing a new advanced science center hub along the Bosphorus in Istanbul meant a precise notion for the facilities of a global research hub that could simultaneously work as a dynamic urban design concept and become an inspiring architectural expression.
project team:Alexis SanalMurat SanalMerve Akdağ ÖnerOrkun BeydağıHazar Arasan
RAP-PAR: augmenting spatiality
The ambient qualities of urban ecologies as we as civilizations create them in speci�c geographic locations are coming to the forefront of cultural production. With the advent of digital media and environmental consciousness more than any other point in human history we are able to access the formal qualities of the ambient environment in terms of the built, social and natural environ-ments. Through sensors, databases and visualization we can collect information on the ambient dynamics of cities, sound, light, air quality, acoustics, human movement, ecological dimensions, social preferences and their multiplicity of interactions. And while social media and global commerce has transcended the con�nes of place, its impact on culture has made place-centric experiences and spatial awareness more important not less.
RAP PAR, a team from Istanbul, Turkey, proposes a sound and light installation, namely Augment-ing Spatiality for Abercrombie Lane. The installation’s premise is to reveal speci�c ambient qualities of Sydney and Istanbul as distinct urban ecologies, but also like a cultural exchange, put their sampled qualities into a dialogue that responds to one another. The dialogue will be framed on a spatial narrative referring to ‘equal’ volumes of spaces to create sequence, compression, gateway, perception and extension in the formal geometry of the space. Abercrombie Lane was speci�cally selected as it is the only site that is common to many of the urban spaces in Istanbul, but also as it does not receive direct sun to the ground which creates a very suitable environment for light installation. RAP PAR is taking Beyoğlu-Karaköy axis as its main spatial center to collect sound, and speci�cally İstiklal Street as the ‘main spine’ (with particular resemblances with the George Street, including current urban transformation urgencies) to form the background sound vocabulary of ‘equal’ volumes that are connected to this main axis. Project Team: Artist-Re�k Anadol, Curator-Pelin Dervis, Architect-Alexis Sanal, Orkun Beydagi, Media Designer-Sebastian Neitsch, Music-Kerim Karaoglu
installation
ŞANAL architecture - planning
Şişhane Park
My role is to test the di�cult construction solutions in BIM environment and construction site coordination
Providing over 800+ cars, public gathering for 1,000+, and four open park landscapes for engaging the city.
Where else in Istanbul to have snow gardens, a spring blossom park, sunset decks, a level sloped path to walk, lots of easy to navigate parking, bi-modal transit access, a market place for specialty goods, the outdoor theater of urban life, a public venue for cultural events…then the precipice of the PERA / GALATA / SIŞHANE / TÜNEL districts of BEYOĞLU, Istanbul
project team:Alexis SanalMurat SanalBegüm ÖnerOrkun BeydağıCibeles Sanchez
handrail manufacturing detailconcrete construction plan
BIM site diagram
3929
3751
3896
3679
3861
3611
3401
3401
3401
31833236
3316
3401
3876
3720
3495
3329
3461
3790
4000
3980
3800
3830
3960
3411
3890
3925
4050
34613491
3400
3611
3653
3671
3581
4070
39613961
3792
3959
4070
4050
3600
3791
3800
3690
3500
3465
3800
3460
3635
3450
3400
3350
3300
3250
3200
90°
KAYNAKHİZASI
KAYNAKHİZASI
METAL PROFIL
AHSAP KUPESTE
AHSAP KUPESTE
0°
5°
0°
5° MAKSİMUMKATLAMA AÇISI
MİNİMUMKATLAMA AÇISI
DIŞİÇ
GÖRÜNÜŞ
PASLANMAZ ÇELİK DİKME
KÜPEŞTEBAĞLANTIELEMANI
METAL PROFIL
ZEMİN BAĞLANTIELEMANI DETAYI
20°KATLANMAHİZASI
KAYNAKHİZASI
KAYNAKHİZASI
20°KATLANMAHİZASI
KAYNAKHİZASI
KAYNAKHİZASI
AÇILMIŞ GÖRÜNÜŞ
ZEMİN BAĞLANTI ELEMANI DETAYI
BIM stair construction diagram
4900
34.00
34.90
36.10 37.30
34.00
31.60
32.40
34.10
33.00
34.00
34.00
37.0035.80
34.6534.00
33.20
39.00
40.40
40.30
34.50 34.50
34.50
34.50
35.35
36.10
36.10
35.15
34.70
34.45
37.90
38.75
39.35
39.75
39.90
33.40
Hmin=230cm
Hmin=300cm
Hmin=300cm
34.30
34.70
37.00
34.30
34.65 36.35
34.45
35.00
36.80
36.80
39.10
39.50
38.68
38.35
34.00
33.00
29.40
34.00
34.00
35.00
34.00
PEN KONUMU- RAMPA HKOORDİNASYONU
PEN KONUMU- RAMPA HKOORDİNASYONU
82508250
SALT research libraryŞANAL architecture - planning