43
Dufferin Station Preliminary Design Display Panels 1/25/2012 Open House#1 – January 25, 2012

Dufferin Station: Preliminary Design Consultation

Embed Size (px)

DESCRIPTION

Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. This is the preliminary station design consultation for Dufferin. Visit www.thecrosstown.ca for more information.

Citation preview

Page 1: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Preliminary Design

Display Panels

1/25/2012

Open House#1 – January 25, 2012

Page 2: Dufferin Station: Preliminary Design Consultation

Welcome to the Dufferin Station

Preliminary Design Open House

Please sign-in so that we may provide

you with updates on future events.

1/25/2012 2

Dufferin Station Preliminary Design

Page 3: Dufferin Station: Preliminary Design Consultation

Part 1Part 1Part 1Part 1

•Introduction•Introduction•Introduction•Introduction

••••CrosstownCrosstownCrosstownCrosstown UpdateUpdateUpdateUpdate

•Station Design 101 •Station Design 101 •Station Design 101 •Station Design 101 ---- Design PrinciplesDesign PrinciplesDesign PrinciplesDesign Principles

Part 2Part 2Part 2Part 2

••••DufferinDufferinDufferinDufferin Station Preliminary Design Station Preliminary Design Station Preliminary Design Station Preliminary Design

Open House Overview

1/25/2012 3

3

••••DufferinDufferinDufferinDufferin Station Preliminary Design Station Preliminary Design Station Preliminary Design Station Preliminary Design

****Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions

about existing development applications at about existing development applications at about existing development applications at about existing development applications at DufferinDufferinDufferinDufferin or the or the or the or the

future Land Use Study around future Land Use Study around future Land Use Study around future Land Use Study around CrosstownCrosstownCrosstownCrosstown StationsStationsStationsStations

Dufferin Station Preliminary Design

Page 4: Dufferin Station: Preliminary Design Consultation

The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House

• Provide a brief Crosstown project update

• Present the Crosstown station design philosophy

• Explain the anatomy of a station and challenges

• Display the preliminary design of Dufferin Station

Most importantly: Most importantly: Most importantly: Most importantly:

*Get your input on the *Get your input on the *Get your input on the *Get your input on the PreliminaryPreliminaryPreliminaryPreliminary Design early in this Design early in this Design early in this Design early in this

1/25/2012 4

*Get your input on the *Get your input on the *Get your input on the *Get your input on the PreliminaryPreliminaryPreliminaryPreliminary Design early in this Design early in this Design early in this Design early in this

process. process. process. process.

• Architectural Station design will be prepared for Open House #2 in

Spring 2012. Significant outreach will follow on construction.

Dufferin Station Preliminary Design

Page 5: Dufferin Station: Preliminary Design Consultation

Open House #1 - Jan 25, 2012

Online Consultation - Jan 25 to Feb 10, 2012

Open House #2 - Spring, 2012•Response to Open House #1 input

•Architectural Treatments

•Final Station Design Open House

Open House #3 - Fall 2012

Dufferin Station Design Process

1/25/2012 5

Open House #3 - Fall 2012• Construction staging Ongoing Outreach on Construction

Tunnelling (Head walls at Tunnelling (Head walls at Tunnelling (Head walls at Tunnelling (Head walls at DufferinDufferinDufferinDufferin station box) station box) station box) station box) End 2012 – 2013 (TBD)

Dufferin Station construction - 2014 (TBD)

Dufferin Station Preliminary Design

Page 6: Dufferin Station: Preliminary Design Consultation

Format for Feedback

• Please speak with the project team at the displays, we’re here

to answer your questions

• There are tables to write comments and for group discussions

• Please submit a feedback form tonight if possible , or send us

comments

via e-mail, mail, or online at www.thecrosstown.ca by February

1/25/2012 6

via e-mail, mail, or online at www.thecrosstown.ca by February

10, 2012

• A consultation report to inform the designers will be posted

online at: www.thecrosstown.ca

Dufferin Station Preliminary Design

Page 7: Dufferin Station: Preliminary Design Consultation

Presentation Part 1:

Crosstown Overview &

Construction Update

1/25/2012 7

Dufferin Station Preliminary Design

Page 8: Dufferin Station: Preliminary Design Consultation

1/25/2012 8

The Crosstown* Final number and location of stations subject to review

Dufferin Station Preliminary Design

Page 9: Dufferin Station: Preliminary Design Consultation

1/25/2012 9

Congestion Today

9Dufferin Station Preliminary Design

Page 10: Dufferin Station: Preliminary Design Consultation

1/25/2012 10

The Eglinton-Scarborough Crosstown Plan

• $8.4 billion transit investment from the Province of Ontario

through Metrolinx

• 25 km east-west transit corridor between Black Creek Drive and

Scarborough Centre

• 60% faster than bus service today (e.g. only 15 minutes from

Keele to Yonge) Keele to Yonge)

• 19 km underground tunnel (Black Creek Drive to Kennedy

Station)*

• 6km seamless service will replace the SRT from Kennedy Station

to Scarborough Centre

• Up to 26 stations

• *Exact alignment west of Keele Street and east of Laird Drive TBD

Dufferin Station Preliminary Design

Page 11: Dufferin Station: Preliminary Design Consultation

1/25/2012 11

Crosstown Construction Update

� Crosstown tunnel preparation work

at Black Creek and Eglinton in

Keelesdale Park

� Piling rigs are building concrete

support walls for the future tunnel

launch shaft

� The shaft will enable tunnelling � The shaft will enable tunnelling

eastward in summer 2012

� Soil testing for the tunnel and

stations continues from Keele Street

to Kennedy Station in Scarborough

Dufferin Station Preliminary Design

Page 12: Dufferin Station: Preliminary Design Consultation

Conceptual Design of a Crosstown Station

1/25/2012 12

Urban Design and Architectural

Guidelines have been developed:

• ensure positive change along the

corridor

• guide individual station designs

and achieve consistency

• guide configuration of surface

elements

• integrate surface elements with

existing and future development

Dufferin Station Preliminary Design

Page 13: Dufferin Station: Preliminary Design Consultation

Stations 101

What’s needed to make a Station Work?

1/25/2012 13

• Main Entrance

• Secondary Entrance

• Passenger Transportation (elevators, escalators)

• Mechanical and Electrical Systems

• Ventilation Shafts and Ventilation Fan Rooms

• Traction Power Substations

Dufferin Station Preliminary Design

Guiding Principle:

Consolidate Surface Elements to enhance design &

minimize impacts

• Reduce construction impacts (traffic, staging area, noise, dust )

• Preserve public space and development potential

• Save $

Page 14: Dufferin Station: Preliminary Design Consultation

• Integrate with surrounding neighbourhood

• Safe and enjoyable user experience

• Full accessibility

• Preserve space for future re-development

• Enhance the local “sense of place”

Design Philosophy

1/25/2012 14

Accessibility for all users

14

• Enhance the local “sense of place”

• Long-term sustainability

• Reduce Construction Footprint & Impacts

• Reduce Costs

Compatible scale

Accessibility for all users

Dufferin Station Preliminary Design

Page 15: Dufferin Station: Preliminary Design Consultation

Accessibility Principles & Features

• Access for persons with all levels of mobility

• Elevators

• Escalators

• Low-Floor Access

1/25/2012 15

15

• Low-Floor Access

Dufferin Station Preliminary Design

Page 16: Dufferin Station: Preliminary Design Consultation

Safety and Security Features

• Monitored CCTV Security Cameras

• Urban Braille

• High Quality Lighting

1/25/2012 16

16Dufferin Station Preliminary Design

Page 17: Dufferin Station: Preliminary Design Consultation

1/25/2012 17

Public Realm Elements

• Streetscape & integration

of Public Realm Elements

• Wayfinding

• Bicycle Facilities

Elements to be determined

and considered:

Dufferin Station Preliminary Design

• Bicycle Facilities

Page 18: Dufferin Station: Preliminary Design Consultation

Architectural Design Approach

• Excellence in architectural/urban design treatments

• Cost effective and maintainable structures

• Standard station box configurations

• Creative use of materials, color,

1/25/2012 18

• Creative use of materials, color, textures, artwork, light

• Brand identification with graphics

• Use standard elements whenever

possibleEglinton West Station

Dufferin Station Preliminary Design

Page 19: Dufferin Station: Preliminary Design Consultation

Surface Elements

Guiding Principles

• Surface elements are

most visible to public

• Integrate into local

community

• Minimize property

implications

1/25/2012 19

implications

• High quality design

• Major focus on

consolidating:

– Entrances

– Vent Shafts

– Substations

Dufferin Station Preliminary Design

Page 20: Dufferin Station: Preliminary Design Consultation

� Any architectural finish can contain integrated artwork, including:

� walls

� floors

� ceilings

� glazing

Integrated Artwork

1/25/2012 20

� glazing

Dufferin Station Preliminary Design

Page 21: Dufferin Station: Preliminary Design Consultation

Traction Power Substations

What and Why?

• Required to provide power to the station

system

• Every two kilometres, at stations

• Many different configurations Toronto Hydro Substation in Scarborough

1/25/2012 21

• Many different configurations

• Above ground, surface, below-ground

• Guidelines to integrate substations

Leslie Station

Toronto Hydro Substation in Scarborough

Dufferin Station Preliminary Design

Page 22: Dufferin Station: Preliminary Design Consultation

Presentation Part 2:

Dufferin Station

1/25/2012 22

22Dufferin Station Preliminary Design

Page 23: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Preliminary Design

Preliminary Design by:

Crosstown Consortium

IBI Group

1/25/2012 23

IBI Group

SNC Lavalin

Lea Consulting Limited

Dufferin Station Preliminary Design

Page 24: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Local Context

1/25/2012 24

Crosstown Line

Dufferin Station Preliminary Design

Population Density within a 10 minute walk to Dufferin Station

Barrie GO Transit

Page 25: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Existing Uses

1/25/2012 25

Dufferin Station Preliminary Design

Page 26: Dufferin Station: Preliminary Design Consultation

Dufferin StationFuture Transit & Existing Bus Stops

1/25/2012 26

CROSSTOWN

Dufferin Station Preliminary Design

Page 27: Dufferin Station: Preliminary Design Consultation

1/25/2012 27

Dufferin StationBike Routes

Improved bike connections

to be identified

Dufferin Station Preliminary Design

Page 28: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Local ContextFairbank Village and York-Eglinton BIAs

1/25/2012 28

•www.fairbankvillagebia.com

•Chamberlain Avenue to Dufferin Street

www.yorkbia.com

•Dufferin Street to Winona Drive/Marlee Avenue

Dufferin Station Preliminary Design

Page 29: Dufferin Station: Preliminary Design Consultation

1/25/2012 29

Dufferin Station

2010 Environmental Assessment

Dufferin Station Preliminary Design

Page 30: Dufferin Station: Preliminary Design Consultation

DUFFERIN STREET

Secondary

Entrance

Dufferin Station

Station Entrances - 2012

1/25/2012 30

EGLINTON AVENUE WEST UNDERGROUND STATION BOX

Main Entrance

Dufferin Station Preliminary Design

Page 31: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Main Entrance & Station Support - 2012

1/25/2012 31

Dufferin Station Preliminary Design

Page 32: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Green Roof Plan - 2012EGLINTON AVENUE WEST

DUFFERIN STREET

1/25/2012 32

DUFFERIN STREET

Dufferin Station Preliminary Design

Page 33: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Preliminary Design Concept - 2012

1/25/2012 33

Dufferin Station Preliminary Design

Entrances

Substation

Vents

Page 34: Dufferin Station: Preliminary Design Consultation

1/25/2012 34

Dufferin Station

New Consolidated Layout

Key Advantages

� Improves look and feel from street for community

� Reduces number of properties affected

Dufferin Station Preliminary Design

� Reduces number of properties affected

� Preserves potential for investment and development

� Reduces construction footprint, cost & impacts

(station box shortened by 40 metres)

Page 35: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Passenger Circulation - 2012

LOOKING SOUTH

1/25/2012 35

Dufferin Station Preliminary Design

Page 36: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Station Daylighting - 2012

LOOKING SOUTH

1/25/2012 36

Dufferin Station Preliminary Design

Page 37: Dufferin Station: Preliminary Design Consultation

1/25/2012 37

Dufferin Station

Main Entrance & Station Support Building

EXISTING FUTURE

Dufferin Station Preliminary Design

SOUTHEAST CORNER OF DUFFERIN AND EGLINTON (GAS STATION)

Page 38: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Station Support Building

1/25/2012 38

EXISTING FUTURE

Dufferin Station Preliminary Design

SOUTHWEST CORNER OF DUFFERIN AND EGLINTON

Page 39: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Secondary Entrance Location

EXISTING FUTURE

1/25/2012 39

NORTHWEST CORNER OF DUFFERIN AND EGLINTON

Dufferin Station Preliminary Design

Page 40: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Underground Station Section

1/25/2012 40

Dufferin Station Preliminary Design

Page 41: Dufferin Station: Preliminary Design Consultation

Dufferin Station

St. Hilda’s ParkImportant opportunity to Enhance St. Hilda’s ParkPlease let us know what improvements are most important to

you. Please fill in our questionnaire which includes questions on

potential park improvements.

1/25/2012 41

Dufferin Station Preliminary Design

Page 42: Dufferin Station: Preliminary Design Consultation

Dufferin Station

Community Outreach for Construction

• At this early design stage, construction staging is not yet

developed

• Comprehensive Construction Management Plan &

1/25/2012 42

• Comprehensive Construction Management Plan &

individual construction plans for each station will be

developed with local consultation before construction

• Please contact us any time with questions you may

have about construction

Dufferin Station Preliminary Design

Page 43: Dufferin Station: Preliminary Design Consultation

1/25/2012 43

The Crosstown Team

Please Get in Touch with Us!

Community Office Hours — 2012

Monday, Wednesday, Friday:

9:00 a.m. – 5:00 p.m.

Tuesday: 8:00 a.m. – 4:00 p.m.

Devin Horne, Franca Di Giovanni,

Denise Jayawardene

E-mail: [email protected]

Online: www.thecrosstown.ca

Tel: 416-338-6310

Fax: 416-397-8193

Dufferin Station Preliminary Design

Tuesday: 8:00 a.m. – 4:00 p.m.

Thursday: 12:00 p.m. – 8:00 p.m.Fax: 416-397-8193

TTY: 416-481-2523

Visit our West Community Office at

1848 Eglinton Avenue West

(at Dufferin)