this ppt is seminar on hindustan college of science & technology farah mathura in 2013. in ppt shows the work procedure of construction of road.

Citation preview

Page 1: cement road construction in the rural areas

1

PPT O

N SUM

MER

TRANIN

G

ANSH

UL KUM

AR

NEE

RAJ BABU

C

IVIL

ENGG. 7

TH SEM

B2

11

0640

0902

11

0640

0908

Page 2: cement road construction in the rural areas

2

Public works department Uttar Pradesh C. D.-3 Mainpuri

Page 3: cement road construction in the rural areas

Construction of

Cement Concrete

Road

Page 4: cement road construction in the rural areas

4

Page 5: cement road construction in the rural areas

5

Using mix Concrete , there some Point to construct the road-

1. Preparation of base2. Form working3. Preparation of subgrade4. Watering of base5. Joints6. Material mix & placing7. Compaction

Page 6: cement road construction in the rural areas

6

8. Finishing of surface8A. Floating8B. Belting8C. Brooming9. Curing10. Joint filling11. Edging12. Open to traffic

Page 7: cement road construction in the rural areas

7

1. Preparation of subgrade

1. Rolling on sub grade by roller2. Filling the granular soil in the weak part and

pot holes3. Correct the soil coat , Camber , longitudinal

slop When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , used water proof paper on entire length.

Page 8: cement road construction in the rural areas

8

Page 9: cement road construction in the rural areas

9

2. Preparation of base

Choose any one type of base1. W.B.M. base As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on W.B.M.2. Concrete base On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64)

Page 10: cement road construction in the rural areas

10

3. Granular medium material layer 10-15cm composite layer of sand , moorum , bajri are used for better drainage facilities4. Stabilization soil

Page 11: cement road construction in the rural areas

11

3. Form work Material for form work- Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, minerals.

1. before using form work, it should free from all type material like as dust ,cement. 2. To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden sheeting.

Page 12: cement road construction in the rural areas

12

3. The depth of wooden block must be same as level of slab thick. 4. After 24hrs form work displaced next length of road.

Page 13: cement road construction in the rural areas

13

4. Watering of base

If base is dryThan using the sprinkling process on it properly after that placing the concrete.

Page 14: cement road construction in the rural areas

14

5. JOINTS

Where is necessary to provide transverse, Longitudinal joints; there wedge of woods, metals fix on level of concrete. After setting of concrete it should be pull out. If provided the dowel bar in joints, bars should be fit at right position.

Page 15: cement road construction in the rural areas

15

6. Material mix & placing

Mixer is equipment that mix the concrete using distinct amount of cement , concrete, sand and water. Concrete slab should have more than 5-10cm thick cause of drying.Used two type mixer-1. Batch mixer- at site, used for small road construction2. Continuous mixer- Continuous mixer used for large construction . if distance is more from site , mix concrete transported at site within setting time.

Page 16: cement road construction in the rural areas

16

Page 17: cement road construction in the rural areas

17

Two methods generally used in placing of concrete-1. Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side . 1st side 2nd sideThis method have slow process due to road traffic problems.

Page 18: cement road construction in the rural areas

18

2. Continuous bay method- construct one side of road regularly, if completed some part of first side than construct other side. this method have fast process without no obstruction of traffic

Page 19: cement road construction in the rural areas

19

7. Compaction

Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1.mechanically surface vibrator 2. manually hand tempers

Page 20: cement road construction in the rural areas

20

8. Finishing of surface

1.Floating- For levelling the surface use floating, scree-ding , power trowel. So that there is no acceptable more than 3mm variation in concrete level surface.2.Belting- For making surface clean used belting process. Belt is nothing but a 15-30cm thick sheets of canvass which have more length than road.

Page 21: cement road construction in the rural areas

21

Page 22: cement road construction in the rural areas

22

3. Brooming- Brooming is the process in which we made rough surface parallel to road by brush. It useful in avoiding slip & comfortable travelling on road . the depth of line on road no more than 1.5mm.

Page 23: cement road construction in the rural areas

23

9. Curing

Curing is the name of increasing the hydration process of cement. after setting the concrete , curing process done till 14-28days.

Page 24: cement road construction in the rural areas

24

Some method of curing are-1.Shading concrete works2. Covering with hessian & gunny bags3. Sprinkling of water4.By ponding5. Membrane curing6. Steam curing

Page 25: cement road construction in the rural areas

25

Page 26: cement road construction in the rural areas

26

10. Filling joint

After drying road, clean the joints and fill the shelling compound or hot bitumen . also bitumen fill road bank.

Page 27: cement road construction in the rural areas

27

11. Edging

To protect damaging the sides of concrete pavements used over burnt brick work. in place of brick, provided kerb of pre mix concrete.

Page 28: cement road construction in the rural areas

28

12. OPEN TO TRAFFIC

Generally after a month, road should be open to traffic. If used rapid hardening cement it take 7 days to open traffic.