1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM

2007 presentation

Embed Size (px)

Citation preview

Page 1: 2007 presentation

1

THE

OFFICE 2 OFFICEPROJECT COLLABORATION SYSTEM

Page 2: 2007 presentation

2

A web-based project collaboration systemDESIGNED SPECIFICALLY FOR CONSTRUCTION PROFESSIONALS

Developed by

OFFICE 2 OFFICE LLC.

ARCHITECT

OWNER

CONTRACTOR

SUBCONTRACTOR

SUPPLIER

ENGINEER

REALTORDATA

BANKER

Page 3: 2007 presentation

3

Why is a system needed?

In today’s fast paced design and construction environment good, reliable and instant communication is a necessity for the success of design and construction projects.

Page 4: 2007 presentation

4

Traditional Management Hurdles Slow communication Lack of organization Fragmented data located in

disparate systems Lack of standardized document

formats Difficulty in assessing project

progress

Page 5: 2007 presentation

5

Overcoming the Hurdles Use a web based, accessible system Provide standard interface for

information management Store data centrally on a web server Implement standard document forms

to be used by all Make calendars, project schedules

and important documents available for instant assessment

Page 6: 2007 presentation

6

Proposed Solution

An online communication and collaboration system can be used to assist all team members in achieving the goal of superior communication. The system to be employed is the “Office 2 Office Project Collaboration System”.

Page 7: 2007 presentation

7

What is Office 2 Office?

Office 2 Office is an online communication system designed to facilitate project communication throughout the life of a project AND BEYOND. Effective collaboration among all team members is facilitated through the use of Windows SharePoint Services to incorporate essential collaboration and communication technologies into a single web-based environment.

Page 8: 2007 presentation

8

How is the site organized?The site is organized to mirror the project workflow, including the following major areas:

Project Dashboard Project Information Project Administration Programming Schematic Design Design Development Construction Documents Bidding and Negotiations Construction Administration Post Project Activities

Page 9: 2007 presentation

9

What does it do?Office 2 Office facilitates the capturing and sharing of ideas, information, communications and documents. It also facilitates team participation in discussions, shared documents and collaboration. It has been designed by experienced architects and computer programmers to meet YOURspecific needs.

Page 10: 2007 presentation

10

Office 2 Office Tools

AnnouncementsProject CalendarDiscussion BoardsTask ListsContact ListsDocument LibrariesWeb Site Notifications

How does it work?

Page 11: 2007 presentation

11

Announcements This tool contains information about the project on a current basis to be disseminated to all team members. The Announcement Area is on the opening page.

Office 2 Office Tools

Page 12: 2007 presentation

12

Calendar This tool assists in informing team members about project related meetings and events. This tool encompasses the project lifecycle and will have events associated with it that will relate to all phases.

Office 2 Office Tools

Page 13: 2007 presentation

13

Discussion Boards

This tool is used to provide an organized and easily accessible location for discussing specific topics as they relate to each phase. The discussions are displayed as a “thread” which allows for an easy to use interface.

Office 2 Office Tools

Page 14: 2007 presentation

14

Task Lists

The Task List tool is used to assign a task to a member of the team, specifying its due date and priority, and indicating its status and progress. Tasks lists are available for both the entire project as well as each phase.

Office 2 Office Tools

Page 15: 2007 presentation

15

Document Library

Documents, drawings, pictures and forms will be organized for easy understanding and retrieval in an organized fashion within document libraries. Each password protected area will be accessible by appropriate team members.

Office 2 Office Tools

Page 16: 2007 presentation

16

Web Site NotificationsAutomatic notifications enable you to be alerted by e-mail of any changes made to the content of the system. The system will alert you when any of the previous tools has had an item added, modified, or deleted.

Office 2 Office Tools

Page 17: 2007 presentation

17

Shorter design, review and construction time.

Cost reductions Better communication Faster decision making More detailed project documentation Better organization of documentation Ability to retain documents for future

use in Facilities Management Through efficient Project

documentation the project profitability will increase for the design professional and the owner

Office 2 Office Benefits

Page 18: 2007 presentation

18

Visit Office 2 Office

We invite you to visit our web site at www.ofc2ofc.com. There you will find plenty of useful information about Office 2 Office and the service we provide. Come take a look and see how your firm can take it’s first step towards the technology of the future.

Office 2 Officewww.ofc2ofc.com(813) 839-7379