5

Click here to load reader

Solved area

Embed Size (px)

Citation preview

Page 1: Solved area

Eng:Da’arEng:Da’ar

Page 2: Solved area

Eng:Da’arEng:Da’ar

2G Statistic KPI

Page 3: Solved area

Eng:Da’arEng:Da’ar

2G Statistic KPI

Page 4: Solved area

Eng:Da’arEng:Da’ar

2G Statistic KPI

Page 5: Solved area

Eng:Da’ar

Summary

after optimization there is improvement in Suuqa Area thatfacing SDCCH blacking and TCH congestion , as we see in the figurethere is big change in maxkamada cell-B and cell –E. after thischange the Suuqa complaining is finished.