8.2 Joyce WeeBeam A-B/4 (Ground Floor | Secondary Beam)
Dead Load: Slab (A-B/ 3-4) = 3.6kN/m2 x (1.91m/2)
= 3.44kN/m
Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3= 3.72kN/m
Brick wall weight = 3m x 0.1m x 19kN/m3
=5.7kN/m
Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48
= 13.34kN/m
Live Load: Slab (A-B/ 3-4)= Bathroom x (1.91m/2)
= 2.0kN/m2 x (1.91m/2)= 1.91kN/m
Slab (A-B/ 4-6)= Bedroom x (3.1m/2)= 1.5kN/m2 x (3.1m/2)= 2.33kN/m
Total Live Load:Total Live Load = 1.91kN/m + 2.33kN/m
=4.24kN/m
Ultimate Load:Ultimate Load = TDL(1.4) + TLL(1.6)
= 13.34(1.4) + 4.24(1.6)= 25.46kN/m
Load Diagram for Beam (A-B/4)
Reaction Force:∑m = 0
(RA x 3.1) – (25.46 x 3.1)(1.55) = 0 RA(3.1) – 122.34 = 0
RA = 122.34/3.1 RA = 39.46kN -----∑fy = 0
RA + RB + (-25.46 x 3.1) = 0 -----Substitute into
39.46 + RB – 78.926 = 0
RB = 78.926 – 39.46
RB = 39.5kN
building structure project 2: beam and column 2
Shear Force Diagram
Point 1 = 39.46kN
Point 2 = 39.46 + (-25.46 x 3.1)
= 39.46 x 78.926
= -39.5K
Point 3 = -39.5 + 39.5
= 0kN
Bending Moment Diagram
Peak = (39.46 x 1.55) x ½
= 30.58
building structure project 2: beam and column 3
Beam B-D/5 (Ground Floor | Secondary Beam)
Dead Load: Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) 2/3
= 3.85kN/m
Slab (B-D/5-6) = 3.6kN/m2 X (3.21m/2)2/3
= 3.85kN/m
Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 3.85 + 3.85 + 0.48= 8.18kN/m
Live Load:
Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
building structure project 2: beam and column 4
Slab (B-D/3-5) = Corridor x (3.21m/2)2/3
= 4.0kN/m2 x (3.21m/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α= 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
Slab (B-D/3-5) = Corridor x (3.21/2)2/3
= 4.0kN/m2 x (3.21/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α= 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
Total Live Load:
Total Live Load at (B-C) = 0.7 + 0.7= 1.4kN/m
Total Live Load at (C-D) = 2.41 + 2.41= 4.82kN/m
building structure project 2: beam and column 5
Ultimate Load:Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)
= 8.18(1.4) + 1.4(1.6)= 13.69kN/m
Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6)= 8.18(1.4) + 4.82(1.6)= 19.16kN/m
Load Diagram of Beam (B-D/5):
Reaction Forces:
∑m = 0
RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0
RB(3.21) – 31.56 – 34.36 = 0
RB = 65.92/3.21
RB = 20.54kN/m -----
∑fy = 0
RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----
Substitute into ,
20.54 + RD – 19.17 – 34.68 = 0
RD = 53.85 - 20.54
RD = 33.31kN/m
building structure project 2: beam and column 6
Shear Force Diagram:
Point 1 = 20.54
Point 2 = 20.54 – (13.69 x 1.4)
= 1.374
Point 3 = 1.374 – (19.16 x 1.81)
= -33.31
Point 4 = -33.31 + 33.31
= 0
Bending Moment Diagram:
Bending Moment 1
= (20.54 + 1.374)/2 x 1.4
= 15.34
Bending Moment 2
= 15.3398 + (1.374 x 0.3)/2
= 15.55
building structure project 2: beam and column 7
Beam B/3-6 (Ground Floor | Primary Beam)
Dead Load: Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) 2/3
= 2.29kN/m
Slab (A-B/4-6) = 3.6kN/m2 x (3.1m/2)= 5.58kN/m
Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m
Slab (B-D/5-6) = 3.6kN/m2 x (3.21m/2)= 5.78kN/m
Brick wall weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44
= 15.21kN/m
Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44= 18.5kN/m
Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44= 18.5kN/m
Live Load: Slab (A-B/ 3-4)= Bathroom x (1.91m/2) 2/3
= 2.0kN/m2 x (1.91m/2) 2/3= 1.27kN/m
Slab (A-B/ 4-6)= Bedroom x (3.1m/2)= 1.5kN/m2 x (3.1m/2)= 2.33kN/m
Slab (B-D/ 3-4) = Stairs x (3.21m/2)= 1.5kN/m2 x (3.21m/2)
building structure project 2: beam and column 8
= 2.41kN/m
Slab (D-F/ 5-6)= Stairs x (3.21m/2) = 1.5kN/m2 x (3.21m/2)= 2.41kN/m
Total Live Load:Total Live Load at (B/3-4) = 1.27 + 2.41
= 3.68kN/m
Total Live Load at (B/4-5) = 2.33 + 2.41= 4.74kN/m
Total Live Load at (B/5-6) = 2.33 + 2.41= 4.74kN/m
Ultimate Load:Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6)
= 15.21(1.4) + 3.68(1.6)= 27.18kN/m
Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6)= 18.5(1.4) + 4.74(1.6)= 33.48kN/m
Load Diagram of Beam (B/3-6): Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN
building structure project 2: beam and column 9
Reaction Force:
∑m = 0
RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0
RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0
RB3 = 1042.91/7.09
RB3 = 147.1kN -----
∑fy = 0
RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----
Substitute into ,
147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0
RB6 = 138.5kN
building structure project 2: beam and column 10
Shear Force Diagram:
Point 1 = 147.1
Point 2 = 147.1 – (27.18 x 1.91)
= 95.19
Point 3 = 95.19 – 39.5
= 55.69
Point 4 = 55.69 – (33.48 x 1.79)
= -4.24
Point 5 = -4.24 – 20.76
= -25
Point 6 = -25 – (33.48 x 3.39)
= - 138.5
Bending Moment Diagram:
Bending Point 1
= (147.1 + 95.19)/2 x 1.91
= 231.39
Bending Point 2
= 231.39 + (55.69 x 1.662)/2
= 277.67
Bending Point 3
= 277.67 – (4.24 x 0.128)/2
= 277.4
Bending Point 4
= 277.4 – (25 + 138.5)/2 x 3.39
= 0
building structure project 2: beam and column 11
Beam J/1-3 (First Floor | Secondary Beam)
Dead Load at Beam (J-K/2):
Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3= 2.172kN/m
Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)= 2.88kN/m
Brick Wall Load = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
Beam Self-Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J-K/2):Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48
= 11.23kN/m
Live Load:1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3
= 2.0kN/m2 x (1.81m/2)2/3= 1.21kN/m
2 Slab (J-K/2-3) = Bedroom x (1.6m/2)= 1.5kN/m2 x (1.6m/2)= 1.2kN/m
Total Live Load at Beam (J-K/2):Total Live Load = 1.21 + 1.2
= 2.41kN/m
building structure project 2: beam and column 12
Ultimate Load at Beam (J-K/2):Ultimate Load = TDL(1.4) + TLL(1.6)
= 11.23(1.4) + 2.41(1.6)= 19.58kN/m2
Load Diagram of beam (J-K/2):
Reaction Force ∑m = 0
RJ (1.81) – (19.58 x 1.81)(0.91) = 0 RJ (1.81) – 32.35 = 0
RJ = 32.25/1.81 RJ = 17.82kN -----
∑fy = 0
RJ + RK – (19.58) (1.81) = 0 -----
Substitute into ,
17.82 + RK – 35.44 = 0
RK = 17.62kN
building structure project 2: beam and column 13
Dead Load at Beam J/1-3
Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)2/3
= 5.03kN/m
Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)
= 3.26kN/m
Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)2/3
= 1.92kN/m
Brick Wall Weight = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
Beam Self Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J/1-3):Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48
= 14.47kN/m
Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48= 13.13kN/m
Live Load at Beam J/1-3 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3
= 1.5kN/m2 x (4.19m/2)2/3= 2.095kN/m
Slab (J-K/1-2) = Bathroom x (1.81m/2)= 2.0kN/m2 x (1.81m/2)= 1.81kN/m
Slab J-K/2-3) = Bedroom x 1.6m/2)2/3= 1.5kN/m2 x 1.6m/2)2/3= 0.8kN/m
Total Live Load at Beam J/1-3:Total Live Load at (J/1-2) = 2.095 + 1.81
= 3.905kN/m
Total Live Load at (J/2-3) = 2.095 + 0.8= 2.895kN/m
building structure project 2: beam and column 14
Ultimate Load at Beam J/1-3Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6)
=14.47(1.4) + 3.905(1.6)= 26.51kN/m
Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6)= 13.13(1.4) + 2.9(1.6) = 23.02kN/m
Load Diagram of Beam (J/1-3): Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN
∑m = 0
RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0 RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0
RJ1 = 257.1/4.19 RJ1 = 61.36kN -----
∑fy = 0
RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----
Substitute into ,
61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0
RJ2 = 61.95kN
building structure project 2: beam and column 15
Shear Force Diagram
Point 1 = 61.36
Point 2 = 61.36 – (26.51 x 2.59)
= -7.3
Point 3 = -7.3 – 17.82
= -25.12
Point 4 = -25.12 – (23.02 x 1.6)
= -61.95
Point 5 = -61.95 + 61.95
Bending Moment Diagram
Bending Point 1
= (61.36 x 2.3)/2
= 70.56
Bending Point 2
= 70.56 – (7.3 x 0.29)/2
= 69.5
building structure project 2: beam and column 16
Beam H-K/1 (First Floor | Primary Beam)
Dead Load:
Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)
= 7.542kN/m
Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3
= 2.17kN/m
Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44
= 14.68kN/m
Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44= 9.31kN/m
Live Load: Slab (H-J/1-3) = Bedroom x (4.19m/2)
= 1.5kN/m2 x (4.19m/2)= 3.14kN/m
Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3= 2.0kN/m2 x (1.81/2)2/3= 1.21kN/m
Total Live Load:Total Live Load at (H-J) = 3.14kN/mTotal Live Load at (J-K) = 1.21kN/mUltimate Load:Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6)
=14.68(1.4) + 3.14(1.6)= 25.57kN/m
Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6)
building structure project 2: beam and column 17
= 9.31(1.4) + 1.21(1.6)= 14.97kN/m
Load Diagram of Beam (H-K/1): Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN
∑m = 0RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0
RH (6.3) – 466.13 – 111.06 – 24.66 = 0 RH = 601.85/6.3 RH = 95.53kN/m -----
∑fy = 0
RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----
Substitute into ,
95.53 + RK – 61.36 – 114.81 – 27.1 = 0
RK = 107.34kN
building structure project 2: beam and column 18
Shear Force Diagram
Point 1 = 95.53
Point 2 = 95.53 – (25.57 x 4.49)
= -19.28
Point 3 = -19.28 – 61.36
= -80.64
Point 4 = -80.64 – (14.97 x 1.81)
= -107.34
Point 5 = -107.34 + 107.34
= 0
Bending Moment Diagram
Bending Point 1
= (95.53 x 3.73)/2
= 178.163
Bending Point 2
= 178.163 - (19.28 x 0.76)/2
= 170.837
Bending Point 3
= 170.837 – (80.64 + 107.34)/2 x 1.81
= 0
building structure project 2: beam and column 19
Beam I-K/3 (First Floor | Primary Beam)
Dead Load Slab (H-J/1-3) = 3.6kN/m2 x (4.49m/2)
= 7.54kN/m
Slab (I-N/3-5) = 3.6kN/m2 x (4.71/2)= 8.48kN/m
Slab (J-K/2-3) = 3.6kN/m2 x (1.6/2)= 2.88kN/m
Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44
= 23.16kN/m
Total Dead Load at (J-K) = 18.5kN/m
Live Load: Slab (H-J/1-3) = Bedroom x (4.49m/2)
= 1.5kN/m2 x (4.49m/2)= 3.37kN/m
Slab (I-N/3-5) = Living Room x (4.71m/2)= 4.0kN/m2 x (4.71m/2)= 9.4kN/m
Slab (J-K/2-3) = Bedroom x (1.6m/2)= 1.5kN/m2 x(1.6m/2)= 1.2kN/m
Total Live Load:
building structure project 2: beam and column 20
Total Live Load at (I-J) = 3.37 + 9.4= 12.77kN/m
Total Live Load at (J-K) = 9.4 + 1.2= 10.6kN/m
Ultimate Load:Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6)
= 23.16(1.4) + 12.77(1.6)= 52.85kN/m
Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6)= 18.5(1.4) + 10.6(1.6)= 42.86kN/m
Load Diagram of Beam (I-K/3): Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m
∑m = 0
RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0
RI(3.21) – 185.71 – 112.13 – 70.59 = 0
RI = 368.43/3.21
RI = 114.76kN -----
∑fy = 0
RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----
Substitute into ,
114.76 + RK – 61.95 – 73.99 – 77.58 = 0
RK = 98.76kN
building structure project 2: beam and column 21
Shear Force Diagram:
Point 1 = 114.76
Point 2 = 114.76 – (52.85 x 1.4)
=40.77
Point 3 = 40.77 – 61.95
= - 21.18
Point 4 = -21.18 – (42.86 x 1.81)
= -98.76
Point 5 = -98.76 + 98.76
= 0
Bending Moment Diagram
Bending Point 1
= (114.76 + 40.77)/2 x 1.4
= 108.87
Bending Point 2
= 108.87 - (21.18 + 98.76)/2 x 1.81
= 0
building structure project 2: beam and column 22
3.211.4
9.2 Joyce WeeColumn A/1 (Connected to All Floors)
-Roof Level-
Dead Load: Roof Slab = (3.155 x 2.09) m2 x 3.6kN/m2
= 6.59m2 x 3.6kN/m2
= 23.72kN
Roof Beam = (3.155 + 2.09) m x 1.44kN/m= 5.245m x 1.44kN/m= 7.55kN
Total Dead Load at Roof Level= 23.72kN + 7.55kN= 31.27kN
-First Floor-
Dead Load: Live Load: Slab = (3.155 x 2.09)m2 x 3.6kN/m2 Bedroom
= 6.59m2 x 3.6kN/m2 = (2.09m x 3.155m) x 1.5kN/m2
= 23.72kN = 9.89kN
Wall = (3.155m + 2.09m) x 5.7kN/m= 5.245m x 5.7kN/m= 29.9kN
Beam = (3.155m + 2.09m) x 1.44kN/m= 5.75m x 1.44kN/m= 7.55kN
Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN= 67.65kN
building structure project 2: beam and column 23
-Ground Floor-
Dead Load: Live Load: Slab = (3.155 + 2.09) m2 x 3.6kN/m2 Bedroom
= 6.59m2 x 3.6kN/m2 = (3.155m x 2.09m) x 1.5kN/m2
= 23.72kN = 9.89kN
Wall = (3.155m + 2.09m) x 5.7kN/m= 5.245m x 5.7kN/m= 29.9kN
Beam = (3.155 + 2.09) m x 1.44kN/m= 5.245m x 1.44kN/m= 7.55kN
Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN = 67.65kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN= 166.57kN = 19.78kN
Ultimate Load at Column D/3= TDL (1.4) + TLL (1.6)= 166.57kN (1.4) + 19.78kN (1.6) = 233.198kN + 31.648kN= 264.85kN
building structure project 2: beam and column 24
Column D/3 (Connected to All Floors)
-Roof Level-
Dead Load: Live Load: Roof Slab = (3.66 x 3.94) m2 x 3.6kN/m2
= 14.42m2 x 3.6kN/m2
= 51.91kN
Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m= 5.75m x 1.44kN/m= 8.28kN
Total Dead Load at Roof Level= 51.91kN + 8.28kN= 60.19kN
-First Floor-
Dead Load: Live Load: Slab = (3.36m2 + 2.98m2 + 3.79m2) x 3.6kN/m2 Bedroom
= 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2
= 36.468kN = 5.05kN
Wall = (2.09m + 1.61m) x 5.7kN/m Corridor= 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2
= 21.09kN = 27.08kN
Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m= 5.75m x 1.44kN/m= 8.28kN
Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN= 72.32kN = 32.13kN
building structure project 2: beam and column 25
-Ground Floor-
Dead Load: Live Load: Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2 Bedroom
= (3.66m x 3.94m) x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2
= 51.91kN = 5.05kN
Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m Corridor= 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2
= 32.78kN = 11.91kN
Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m Kitchen= 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2
= 10.944kN = 24.231kN
Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor= 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN +
24.23kN= 234.62kN = 41.19kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN= 234.62kN = 73.32kN
Ultimate Load at Column D/3= TDL (1.4) + TLL (1.6)= 234.62kN (1.4) + 73.32kN (1.6) = 328.47kN + 117.312kN= 445.78kN
building structure project 2: beam and column 26
Column D/6 (Acting on Ground Floor Only)
-Ground Floor-
Dead Load: Live Load: Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2 Corridor
= (3.04m x 5.444m) x 3.6kN/m2 = (1.61m x 1.7) x 4.0kN/m2
= 59.54kN = 10.95kN
Wall = (1.7m + 3.83m) x 5.7kN/m Living Room= 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x
4.0kN/m2
= 31.52kN = 29.16kN
Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m Storeroom= 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2
= 12.214kN = 16.28kN
Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor= 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN +
16.28kN= 109.75kN = 56.39kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 109.75kN = 56.39kN
Ultimate Load at Column D/3= TDL (1.4) + TLL (1.6)= 109.75kN (1.4) + 56.39kN (1.6) = 153.65kN + 90.22kN= 243.87kN
building structure project 2: beam and column 27
building structure project 2: beam and column 28