Page 1: Robert’s Projects at Adams Building Contractors

Robert’s Projects atAdams Building Contractors

Page 2: Robert’s Projects at Adams Building Contractors

This project involved the addit ion of a 105 foot diameter steel bin.

ETHANOLFACILITY

Page 3: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Th is pro jec t u t i l i zed rammed aggregate p ie rs to improve the ex is t ing so i l s bear ing capac i ty fo r a new 105 foot d iameter b in .

The auger at the r ight dr i l l s a 20 inch d iameter ho le approx imate ly 25 feet deep. The ramming r ig on the le f t compacts aggregate in l i f t s o f approx imate ly 18 inches .

Th is dens ifi es the ex is t ing so i l s and improves the bear ing capac i ty.

RAMMED AGGREGATE PIERS – SOIL MODIFCATION

Auger Rig

TampingRig

Page 4: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Load testing of the rammed aggregate Geopiers

SOIL IMPROVEMENT FOR 105 FOOT DIAMETER BIN

Page 5: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Bin r ing wal l footing reinforcing is re-routed around the boot pit to maintain continuity.

105 FOOT DIAMETER BIN FOUNDATION

Page 6: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Ring footing and tunnel mat have been poured. Sett ing formwork for r ing wal l .

105 FOOT DIAMETER BIN FOUNDATION

2’-0” x 10’-0”Ring Footing

Page 7: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Ring footing and boot pit have been poured.

105 FOOT DIAMETER BIN FOUNDATION

Page 8: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Back fi l l ing operations in the interior of the bin r ing wal l and reclaim tunnel. Backfi l l consisted of crushed l imestone materials.

105 FOOT DIAMETER BIN FOUNDATION

ReclaimTunnel

Crushed stonebackfill

RingWall

Page 9: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the bin r ing wal l and foundation with the reclaim tunnel running down the center of the bin foundation.

105 FOOT DIAMETER BIN FOUNDATION

Ring Wall

Reclaim Tunnel

BinAnchorBolts

Page 10: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the construct ion of the new boot p i t ad jacent to the rec la im tunnel be low the b in .

The rec la im conveyor w i l l feed the new bucket e levator which w i l l s i t in the boot p i t . Bucket e levator capac i ty is 15,000 bushel per hour.

NEWBOOTPIT

Boot Pit Walls

TowerAnchorBolts

Page 11: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

View looking down the reclaim tunnel towards the exist ing bin.

105 FOOT DIAMETER BIN FOUNDATION

Page 12: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Formwork and steel beam header at tunnel opening in r ing wal l foundat ion.

The steel beam carr ies uni form wal l loads from the bin of approximately 50 k ips per foot over the tunnel opening in the r ing wal l .

105 FOOT DIAMETER BIN FOUNDATION

W18x86

Page 13: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the completed rec la im tunnel be low the b in fl oor. The s l ide gates have been insta l led at the fl oor sump locat ions. Recla im conveyor has not been insta l led.

RECLAIM TUNNEL

SlideGate

BootPit

Page 14: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photograph shows the instal led reclaim conveyor connected to the sl ide gate with spouting.

RECLAIM TUNNEL

Reclaimconveyor

Spout

SlideGate

Page 15: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photograph is in the bucket elevator boot pit .

BUCKET ELEVATOR BOOT PITBucket Elevator Legs

ReclaimConveyor

Page 16: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Two horizontal wal l r ings and roof framing have been constructed.

The bin is almost ready to be jacked up to i t ’s ful l height.

105 FOOT DIAMETER STEEL BIN

Page 17: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photograph i l lus t rated the roof construct ion for a s tee l s torage b in .

The fi rs t two wal l r ings are set and then the roof f raming is bui l t . After the roof i s constructed , they jack the ent i re b in up and insert wal l r ings a sect ion at a t ime. Th is sequence cont inues unt i l the b in reaches i t ’ s fi nal eave he ight .

105 FOOT DIAMETER STEEL BIN

Page 18: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Two horizontal r ings are complete and the roof is sheeted. The bin is now ready for jacking to bui ld up it ’s ful l height.

750,000 BUSHEL BIN CAPACITY

Page 19: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the new 105 foot diameter steel bin under construction. The bin is just over the half way mark of i t ’s fi nal 88 foot eave height.

750,000 BUSHEL CAPACITY BIN

Page 20: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

The completed bin at i t ’s 88 foot eave height.

750,000 BUSHEL CAPACITY STEEL BIN

Page 21: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the aerat ion fans instal led at the aerat ion trenches on the b in foundat ion. In the background is the steel tower which supports the fi l l conveyor above.

AERATION FANS

AerationFan

NewBootPit

Page 22: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

The ex ist ing b in is on the left and the new 105 foot d iameter b in is on the r ight .

This photograph shows the erect ion of the two towers which wi l l support a new catwalk t russ and fi l l conveyor to feed the new bin.

750,000 BUSHEL STEEL STORAGE BIN

NewTowersErected

Page 23: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Bin erection has been completed. Tower and catwalk truss are erected.

The next step wi l l be instal l ing the fi l l conveyor on the catwalk truss.

TOWERS AND TRUSSES

NewTower

New Catwalk Truss

Page 24: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

This photo shows the completed towers and catwalk trusses in place. Exist ing bin is on the left and the new bin is on the r ight.

TOWERS AND CATWALK TRUSS

ExistingBin

NewBin

New catwalk truss, conveyor,and towers

Page 25: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

The completed project.

105 FOOT DIAMETER BIN

NewBin

Page 26: Robert’s Projects at Adams Building Contractors

ETHANOL FACILITY

Completed 105 foot diameter bin structure.

105 FOOT DIAMETER BIN

Page 27: Robert’s Projects at Adams Building Contractors

135 FOOT DIAMETER BIN FOUNDATION

135 FOOT DIAMETER STORAGE BIN

Page 28: Robert’s Projects at Adams Building Contractors

BIN FOUNDATION

Aer ia l v iew of one quarter o f the b in foundat ion. S lab concrete has been poured and b lock outs are in p lace to form the future aerat ion t renches. Addi t ional ly , the recla im tunnel roof s lab has been poured and sump inserts have been set .

135 FOOT DIAMETER BIN FOUNDATION

Page 29: Robert’s Projects at Adams Building Contractors

BIN FOUNDATION

Aerial view of the 135 foot diameter bin foundation. Slab is being poured with block outs for the aeration trenches.

135 FOOT DIAMETER BIN FOUNDATION

Page 30: Robert’s Projects at Adams Building Contractors

BIN FOUNDATION

Aerial view of the nearly complete bin foundation. Metal aerat ion trench covers are almost complete.

Steel tower in the foreground wi l l support the catwalk truss that carr ies the fi l l conveyor.

135 FOOT DIAMETER BIN FOUNDATION

Page 31: Robert’s Projects at Adams Building Contractors

BIN FOUNDATION

Erecting the last section of catwalk truss for the fi l l conveyor.

135 FOOT DIAMETER STORAGE BIN

Page 32: Robert’s Projects at Adams Building Contractors

This project involved the addit ion of a new 90 foot diameter bin and the towers, catwalk trusses, conveyor, etc. to feed the bin.

GRAIN FACILITY

Page 33: Robert’s Projects at Adams Building Contractors

GRAIN FACILITY UPGRADE

Oversaw the bin foundation design provided by an outside consultant. Designed foundations for the various steel tower.

90 FOOT DIAMETER STEEL STORAGE BIN

New90 foot ϕBin

Page 34: Robert’s Projects at Adams Building Contractors

GRAIN FACILITY UPGRADE

Erecting the catwalk trusses on top of the steel towers.

The towers and trusses were suppl ied by an outside vendor.

TOWERS AND TRUSSES

Page 35: Robert’s Projects at Adams Building Contractors

GRAIN FACILITY UPGRADE

View from the catwalk truss looking down the length of the new conveyor back towards the bucket elevators.

CATWALK TRUSS AND FILL CONVEYOR

Page 36: Robert’s Projects at Adams Building Contractors

GRAIN FACILITY UPGRADE

Tower foundation adjacent to an exist ing bui lding foundation.

STEEL TOWER AND FOUNDATION

Page 37: Robert’s Projects at Adams Building Contractors

GRAIN FACILITY UPGRADE

Erecting sections of the fi l l conveyor inside the catwalk truss.

CATWALK TRUSS ERECTION

Page 38: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Provided in-house structural engineering services for miscel laneous service platforms, manl i ft , etc.

NEW GREENFIELD GRAIN FACILITY

Page 39: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This is the headhouse port ion of the manl i ft on top of the s i los.

The knee braced platform al lows access to the machine room for the man l i ft .

Below the s i lo roof , the man l i ft r ides with in a s l ip formed concrete shaft ins ide the s i lo.

MANLIFT HEADHOUSE

Manlift

LiftMachineRoom

Page 40: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Provided in-house s t ructura l eng ineer ing serv ices for misce l laneous serv ice p lat forms, des ign of the 100 foot ta l l s tee l tower , and coord inat ion wi th an outs ide eng ineer ing consul tant who des igned the s i los .

GREENFIELD GRAIN FACILITY – SOUTH DAKOTA

Page 41: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Sl ipforming of the eight 36 foot diameter si los.

SOUTH DAKOTA

The two 76 foot d iameter s i los were s l ip formed in one operation. The second s l ip forming operation shown here includes the eight 36 foot d iameter s i lo group.

Page 42: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

The second sl ip formed group of eight 36 foot diameter si los nearing the topping out elevation of 140 feet above grade.

GREENFIELD GRAIN FACILITY

140

feet 2 - 76’ Ø

Silos 8 – 36’ ØSilo Group

Page 43: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Conveyor instal lat ion on the si lo group roof deck.

GREENFIELD GRAIN FACILITY

Page 44: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the two 76 foot diameter si los in the background and the 8-36 foot diameter si lo group in the foreground.

GREENFIELD GRAIN FACILITY

Page 45: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Si lo group topped out and start ing conveyor instal lat ion on the roof deck.

GREENFIELD GRAIN FACILITY

Page 46: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Conveyor instal lat ion on the roof deck.

GREENFIELD GRAIN FACILITY

Page 47: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Instal l ing conveyor support frames on the roof.

GREENFIELD GRAIN FACILITY

Page 48: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Bucket elevator instal lat ion passing the top of the si lo roof deck.

This is the area where the steel bucket elevator tower wi l l s i t .

GREENFIELD GRAIN FACILITY

ManliftShaft

Page 49: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

The fi rst sect ion o f s tee l tower be ing erected.

The stee l tower wi l l extend 100 feet above the top o f the gra in s i los .

The stee l tower prov ides support fo r the bucket e levators , sc reeners , and d is t r ibutors that channel the gra in to the var ious conveyors and s i los .

GREENFIELD GRAIN FACILITY

Page 50: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Crane picking the fi rst section of steel bucket elevator tower.

GREENFIELD GRAIN FACILITY

Page 51: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Erection of the fi rst section of bucket elevator tower.

GREENFIELD GRAIN FACILITY

Page 52: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Crane picking a section of the steel bucket elevator tower.

GREENFIELD GRAIN FACILITY

Page 53: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Steel erection of bucket elevator tower

GREENFIELD GRAIN FACILITY

Page 54: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Erection of a ful ly fabricated conveyor service platform.

GREENFIELD GRAIN FACILITY

Page 55: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Conveyor service platform.

GREENFIELD GRAIN FACILITY

Page 56: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

The stee l bucket e levator tower r i ses 100 feet above the top o f the s i lo roof deck which i s 140 feet above grade.

Th is photograph shows the tower at approx imate ly the ha l f way po int .

GREENFIELD GRAIN FACILITY

GrainDryer(1 of 2)

SteelBucketElevatorTower(Galvanized)

TruckReceivingBuilding

Page 57: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Erection of the bucket elevator tower.

GREENFIELD GRAIN FACILITY

BucketElevatorTower

GrainDryer

TruckReceiving

Page 58: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the W27 transfer girder spanning across the u shaped opening in the si lo group. The middle column of the tower sits on the transfer girder.

GREENFIELD GRAIN FACILITY

W27x84TransferGirder

Page 59: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the second grain dryer ready to be jacked up to i t ’s ful l height similar to dryer #1.

GREENFIELD GRAIN FACILITY

Grain Dryer #1

Grain Dryer #2

Page 60: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View of the nearly topped out bucket elevator tower on top of the si lo group.

GREENFIELD GRAIN FACILITY

GrainScreener

Conveyor

BucketElevatorTower

Page 61: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Conveyor service platform on top of the si lo roof deck.

GREENFIELD GRAIN FACILITY

ConveyorServicePlatform

Page 62: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Steel erection on the bucket elevator tower.

GREENFIELD GRAIN FACILITY

Page 63: Robert’s Projects at Adams Building Contractors

GREENDFIELD GRAIN FACILITY

Grain distr ibutors instal led.

GREENFIELD GRAIN FACILITY

Page 64: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View looking up at the grain distr ibutor instal lat ion.

GREENFIELD GRAIN FACILITY

Page 65: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View look ing up at the gra in d is t r ibutors . The square ho les are where the spout ing wi l l connect .

The d is t r ibutors a l low the gra in fl ow to be d i rected to the var ious conveyors which wi l l then carry the gra in to fi l l the s i los .

GREENFIELD GRAIN FACILITY

Page 66: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the nearly topped out bucket elevator tower.

The piece of equipment in the lower r ight hand corner is a grain screener.

GREENFIELD GRAIN FACILITY

Page 67: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Bucket e levator leg insta l la t ion i s cont inu ing on the le ft s ide o f the photograph.

The r ight s ide o f the photograph shows the completed head sect ion o f a bucket e levator leg at a lower leve l .

SOUTH DAKOTA

Page 68: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph is of the last section of tower to be erected. Note that al l structural steel for the bucket elevator tower was galvanized.

SOUTH DAKOTA

Page 69: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Picking the last section of bucket elevator tower.

SOUTH DAKOTA

Page 70: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Picking the last section of steel bucket elevator tower.

GREENFIELD GRAIN FACILITY

Page 71: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Setting the last section of steel bucket elevator tower.

The tower tops out at approximately 240 feet above grade.

GREENFIELD GRAIN FACILITY

Page 72: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Instal lat ion of fl oor bar grating around the bucket elevator legs. Al l grating is galvanized.

GREENFIELD GRAIN FACILITY

BucketElevatorLeg

BucketElevatorLeg

Page 73: Robert’s Projects at Adams Building Contractors

The manl i ft tower enclosed with siding. Two cross over bridges span over to the main bucket elevator tower.

GREENFIELD GRAIN FACILITY – SOUTH DAKOTA

Manlift tower

Cross overbridge

110’ Above silo roofdeck

Cross overbridge

Page 74: Robert’s Projects at Adams Building Contractors

Completed main bucket elevator tower with siding enclosing the manl i ft . Note the two cross over bridges from the manl i ft shaft to the main tower.

GREENFIELD GRAIN FACILITY – SOUTH DAKOTAManlift tower

conveyor

Cross overbridge

Cross overbridge

Grainscreener

HSS bracing struts

Page 75: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the main bucket e levator tower. This tower s i ts on two W36 beams that span 60 between s i lo groups. A l l the structural steel and bar grat ing was galvanized.

GREENFIELD GRAIN FACILITY - ILLINOIS

Page 76: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Wet grain bucket elevator tower. This tower contains a platform that is knee braced out 14 feet beyond the end of the si lo group.

ILLINOIS

Page 77: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View from main tower looking down on the si lo roof deck showing three enclosed conveyor systems on the roof slab.

ILLINOIS

Page 78: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View of the main bucket e levator tower between s i lo groups. The e levator legs are braced at 20 foot intervals . Bui ld ing under construct ion in the foreground is the gra in t ruck receiv ing bui ld ing.

ILLINOIS

76’ ØSilo Group

Page 79: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

This photograph shows the bulk weigh structure and bulk weigher. After the grain is weighed it is loaded into rai l cars for shipping.

ILLINOIS

BulkWeighEquipment

Page 80: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Bulk weigh structure and two story MCC bui lding. Rigid frames are being set for the rai l load out bui lding.

ILLINOIS

Page 81: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

View of wet grain bucket elevators going up. Grain dryer is in the foreground.

ILLINOIS

GrainDryer

38’ ØSilo

Page 82: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Overal l view of the new grain faci l i ty.

GREENFIELD GRAIN FACILITY

Page 83: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Aerial view of

the new ground pi le for addit ional grain storage.

ILLINOIS

Page 84: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY This photo

shows the wet grain bucket elevators and the dryer.

ILLINOIS

GrainDryer

Wet GrainBucket Elevators

38’Diameter

Silos

Page 85: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Overal l view of the project.

GREENFIELD GRAIN FACILITY - ILLINOIS

38’ ØSilos

76’ ØSilos

Page 86: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY - ILLINOIS

2-38’ ØSilos

4-76’ ØSilos

Dryer

Page 87: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Wet grain bucket elevators.

GREENFIELD GRAIN FACILITY - ILLINOIS

Page 88: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY View of the

conveyor bridge that feeds the ground pi le.

ILLINOIS

ConveyorBridge FeedingGround Pile

Page 89: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY View of the

bulk weigher equipment that feeds the rai l cars in the load out bui lding.

ILLINOIS

RailLoad OutBuilding

FallProtection

System

BulkWeighEquip.

Page 90: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Overal l view

of the bulk weigher equipment.

ILLINOIS

RailLoad OutBuilding

BulkWeighEquip.

FutureConveyorSupport

Page 91: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Photo of the

rai l car load out bui lding and the bulk weigher equipment.

ILLINOIS

RailLoad Out

GrainScreener

Page 92: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Photo of the truck receiving bui lding (2 pits) and the fi nes hopper tank.

ILLINOIS

FinesBinHopperTank

TruckReceivingBuilding

SiloAerationFans

Page 93: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Overal l

project view.

ILLINOIS

Main BucketElevator TowerWet Grain

ElevatorTower

76’ ϕSilos

Page 94: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Photo looking

down at the grain screener and a portion of the ground pi le.

ILLINOIS

GrainScreener

Page 95: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Photo of the

main bucket elevator tower.

ILLINOIS

Main BucketElevator Tower

MonorailHoist Beam

Bucket ElevatorHead Section

Conveyor

Page 96: Robert’s Projects at Adams Building Contractors

View of the manl i ft tower adjacent to the main bucket elevator tower.

GREENFIELD GRAIN FACILITY

ManliftHoist

ManliftTower

BucketElevatorHeadSection

Conveyor

Page 97: Robert’s Projects at Adams Building Contractors

Photograph of the manl i ft tower and hoist visible in the machine room.

GREENFIELD GRAIIN FACILITY - ILLINOIS

Page 98: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

New ground pi le for addit ional grain storage.

GREENFIELD GRAIN FACILITY - ILLINOIS

GroundPile

GrainStorage

Page 99: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY

Wet grain bucket elevators.

GREENFIELDGRAINFACILITY

Conveyor

Wet GrainBucketElevatorTower

Page 100: Robert’s Projects at Adams Building Contractors

View of the bulk weigh equipment supported above the rai l load-out bui lding.

ILLINOISGREENFIELD GRAIN FACILITY

BulkWeigher

FinesConveyor

Rail Load-out Building

Screener

UpperGarner

Page 101: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY This

photograph shows a steel bridge beam supporting the fi nes bin above and transferr ing the load over an exist ing tunnel below.

ILLINOIS

W24x104Bridge BeamOver Tunnel Below

Page 102: Robert’s Projects at Adams Building Contractors

GREENFIELD GRAIN FACILITY Bearing

st iff ener under the bin support column.

ILLINOIS

BearingStiffener

W24x104

Page 103: Robert’s Projects at Adams Building Contractors

Thank you for ViewingMy Project Profile