SAFETY TALK FIRED HEATERS M.C JOMON 1

Heater operation

Embed Size (px)

Citation preview

Page 1: Heater operation

SAFETY TALK

FIRED HEATERS M.C JOMON

1

Page 2: Heater operation

Kochi Refinery

HEATER

Heater is used to raise the temperature of a process fluid from lower temperature to higher temperature.

Services in Refinery

• Fractionation: Crude, Vacuum, Reboilers.• Thermal cracking: DCU , Visbreaker, Hydrocracker.• Catalytic cracking: Reformer, CCR.• Reaction: Hydrotreater

2

Page 3: Heater operation

Kochi Refinery

HEATER

3

Page 4: Heater operation

Kochi Refinery

HEATERTypes

Vertical tube cylindrical heater• Most common type refinery heaters.• Vertical radiant tubes and horizontal convection tubes.• Smallest plot area required.• Tubes expand vertically.• Less number of tube supports. One at top and one guide at the bottom for each tube.• Not preferably used for highly vaporizing services.• Heat duty up to 40 MM K cal/hr.

4

Page 5: Heater operation

Kochi Refinery

HEATERTypes

Horizontal box type[ single shell/ twin shell ]• Heat duty from 20-125 MM Kcal/hr.• Horizontal radiant/convection tubes.• Requires large plot area.• Choice of having heater outlet at the radiant section bottom or top.• Large number of tube supports required.• 20-25% costlier than vertical heater.• Used in crude vacuum coker heaters.

5

Page 6: Heater operation

Kochi Refinery

HEATERTypes

Arbor or wicket type heater [for very low pressure drop [ .2-.3 kg/cm2]

• Tubes are like inverted U shape.• All vapour flow. Non coking services.• Low pressure heaters.• Heat duties of 17.5-100 MM Kcal/hr. eg. CCR , • Bottom manifold.• Free draining.• Can be combination firing because of bottom firing.

6

Page 7: Heater operation

Kochi Refinery

HEATERTypes

Inverted wicket type

• Horizontal firing.• Single or double firing.• In situ hydro testing not possible.• Eg. CCR

7

Page 8: Heater operation

Kochi Refinery

HEATERTypes

Helical coil heater

small heat duties up to 15 mm kcal/hr.

Not used in refineries.

8

Page 9: Heater operation

Kochi Refinery

HEATERTypes

Classification based on firing.

• Side fired -One side / both side.• Bottom fired• Top fired.

• Side fired Bottom fired Top fired 9

Page 10: Heater operation

Kochi Refinery

HEATERTypes

Classification based on fuel• Gas firing• Oil firing• Combination firing

Gas firing Oil firing Oil + Gas firing

10

Page 11: Heater operation

Kochi Refinery

HEATERTypes

Classification based on Draft

• Natural Draft-

• Forced Draft - using F.D fan

• Induced Draft – using I.D fan and drop out doors.

• Balanced Draft – using F.D and I.D fans.

11

Page 12: Heater operation

Kochi Refinery

HEATER

Draft

Draft is the difference in pressure which causes the flow of air into the furnace and flue gases through the heater. The pressure differential is caused by the difference in densities of the flue gas in the heater and stack and the air surrounding the furnace.

• Positive draft means flue gas pressure is below ambient pressure.• Negative draft means fluid pressure is above ambient pressure at the same

elevation.• Draft is controlled by stack damper or by ID fan.• Ideal draft in a natural draft furnace is -1 mm wc.

12

Page 13: Heater operation

Kochi Refinery

HEATER

Impact of higher draft

• Taller flame• Flame lift –off• High air flow through burners[ in

natural draft burners only]• Air leakages thru joints of heater

body/ explosion door/peepholes.• Excess air more.

Impact of lower draft

• Damaging heater structure.• Flame or hot air leakage to

atmosphere• Low air flow through burners , low

excess air [ in natural draft]• Pressurization of heater.

13

Page 14: Heater operation

Kochi Refinery

HEATER

Complete Combustion• Complete combustion occurs when 100% of the energy in the fuel is extracted There must be

enough air in the combustion chamber for complete combustion to occur.

• The combustion process is extremely dependent on time, temperature, and turbulence.

Excess Air • In order to ensure complete combustion, combustion chambers are Fired with excess air.

• Excess air increases the amount of oxygen and nitrogen entering the flame increasing the probability that oxygen will find and react with the fuel. [ Nox formation ]

• Addition of excess air greatly lowers the formation of CO.

14

Page 15: Heater operation

Kochi Refinery

HEATER

Excess Air = 100 x (20.9%) / (20.9% -O2m%) - 100%

Where O2 m% = The measured value of oxygen in the exhaust.

Examples:

When O2m% = 5%

Then: excess air = 100 x (20.9%) / (20.9%-5%) - 100% = 100 x (20.9%) / (15.9%) - 100% = 100 x (1.31) - 100%

excess air = 31%

15

Page 16: Heater operation

Kochi Refinery

HEATER sections

• Convection section.

• Radiant section

• Header box: internally insulated structural compartment separated from the flue gas stream which is used to enclose a number of headers or manifolds.

• Stack

16

Page 17: Heater operation

Kochi Refinery

HEATER sections

Convection section• Bare tubes at the bottom of the convection section shields the studded tubes from direct

radiation.• Normally 3 rows. Absorbs remaining 40-20% of total duty.• Core bells to prevent flue gas by passing around tubes.• May have additional waste heat recovery coils or super heating coils for efficiency

improvement.• Soot blowing area.

17

Page 18: Heater operation

Kochi Refinery

HEATER sections

Radiant section

• Absorbs 60-80% of total duty.• Radiation contribution -90%• Tubes are in Vertical or Horizontal.

18

Page 19: Heater operation

Kochi Refinery

HEATERParts/ terminology

• Bridge wall : Wall separating two adjacent heater zones.

• Arch: Flat or sloped portion of the radiant section opposite the floor.

• Damper: A device for regulating the flow of air or flue gas.

• Pilot : Small burner that provides the ignition source for the mail burner

• Atomizer : Device used to reduce a liquid fuel to fine mist using steam.

• Breeching: Heater section that where the flue gases are collected after the last convection coil for transmission to the stack or the outlet duct.

• Jump over: Inter connecting pipe work within a heater coil section.

19

Page 20: Heater operation

Kochi Refinery

HEATERParts / terminology

• Louver damper: Damper consists of several blades [ Combustion air Control]

• Corbel : Projection from refractory surface generally used to prevent flue gas bypassing the tubes in the convection section. if they

are triangular pitch.• Duct: conduit for air or flue gas

• Anchor / Tieback/ Jagger : a metallic or refractory material that holds refractory or insulation.

• Ceramic wool / Refractory bricks : Insulators

• SOB : Shut off Blind./guillotine blind : single blade isolation of air ducts in a heater , like blind.

20

Page 21: Heater operation

Kochi Refinery

HEATERParts / terminology

• Pass: flow streams: Flow circuits consisting of one or more tubes in parallel.

• Plenum wind box: Chamber surrounding the burner that is used to distribute air to the burners or reduce combustion noise.

• Primary air: Portion of the total air that first mixes with fuel.

• Setting loss: Radiation loss: heat lost to the surroundings from the casing of the heater and the ducts and auxiliary equipment's.

• Secondary air: Air supplied to the fuel to supplement primary air.

• Shield section/ shock section: Tubes that shield the remaining convection section tubes from direct radiation.

• Target wall/ reradiating wall: Vertical refractory brick which is exposed to direct flame impingement on one or both

sides.- mainly in DCU heaters. 21

Page 22: Heater operation

Kochi Refinery

HEATERParts terminology

• Tube guide: Device used with vertical tubes to restrict horizontal movement while allowing the tube to expand horizontally while firing.

• Tube supports: Device used to support tubes.

• Tube retainer: Device used to retain horizontal radiant tubes from lifting off the intermediate tube supports during operation

• Vapour barrier: Metallic foil placed between layers of refractory as a barrier to flue gas flow.

• Soot blower: device used to remove soot or deposits.

• Strake/spoiler: metal attachment to a stack that prevent the formation of vortices that can cause wind induced vibration.

22

Page 23: Heater operation

Kochi Refinery

HEATERTUBES

• Bare Tubes.• Tubes with extended surface.

• Fins• Studs• Segmented fins

Bare tubes Studded tubes Fins Segmented fins

23

Page 24: Heater operation

Kochi Refinery

HEATER Tubes with extended surface

Solid fins.

• Most commonly used in gas firing heaters.

• Soot deposit chance is more.• Easy to fabricate.• Less pressure drop.

Segmented fins

• More prone to damage.• Higher heat transfer rate than

solid fins.• Higher pressure drop.• Rarely used in refinery.

24

Page 25: Heater operation

Kochi Refinery

HEATERTubes with extended surface

Studded tubes

• Used for oil firing /combination firing case.• Easier to clean.• Strong.• Costlier than fins.

25

Page 26: Heater operation

Kochi Refinery

HEATERTUBES

• Horizontal tubes –maximum 25m due to construction /handling problems.

• Vertical tubes- maxi. 18m due to limit large variation in the longitudinal heat flux distribution.

• Convection area -Normally all tubes are horizontally.

26

Page 27: Heater operation

Kochi Refinery

HEATERTube Metallurgies

• Carbon steel:- Reboiler, steam generator, super heater, hot oil etc.

• 5 Cr/ 9cr :- Crude, Vacuum ,Visbreaker, DCU.

• SS316L/317L:- Crude with high TAN. Vacuum with high TAN.

• SS347H:- Hydrotreter ,Hydrocracker, and Hydrogen.

27

Page 28: Heater operation

Kochi Refinery

HEATERSoot blower

Soot blowers.

• Soot blower remove the soot from the studded tubes in convection section.• Dry MP steam is used.• After soot blowing flue gas temperature leaving convection section increases.• Soot blower frequency is depended on the fuel used.• In case of Fuel oil case daily is recommendable.

28

Page 29: Heater operation

Kochi Refinery

HEATER Burner

Burners

Classification based on fuel• Fuel gas burner.• Fuel oil burner.• Combination burner.

Classification based on draft

•Natural draft.•Forced draft

29

Page 30: Heater operation

Kochi Refinery

HEATER Burners

Classification based on fuel air mixing

• Premix gas burner• Raw gas/oil burner.• Staged fuel burner• Staged air burner. Low Nox Burners.• Flue gas recirculation burner.

Classification based on NOx emission.

• Low NOx burner [ less than 50 ppm]• Ultra NOx burner. 20-50 ppm• Next generation or new technology burner -less than 10 ppm.

30

Page 31: Heater operation

HEATERBurners

Raw gas/ oil burner

• Can fire fuel oil fuel gas or combination.• Typical turn down ratio 3:1 [oil] and 5:1 [ gas ]

31mcj

Page 32: Heater operation

HEATERBURNERS

Staged Fuel Burners

• Low Nox burner [ 40 ppm vd]• Typically 30% primary fuel and• 70% secondary fuel• High excess air in primary tip reduces flame temperature.• Low O2 in secondary tip results in longer combustion time

32mcj

Page 33: Heater operation

HEATERBURNERS

Staged Air Burner

• Low Nox burner - [50-70 ppm vd]• More effective with combination firing.• Air is split into 2-3 zones to slow the combustion• Primary air to initiate combustion.• Secondary air to complete the combustion and maintain flame shape.• Tertiary air to control the flame outer temperature.

33mcj

Page 34: Heater operation

HEATERBURNERS

Flue Gas Recirculation Burner

• Ultra Nox burner [ 25- 30 ppm]• A part of flue gas is circulated back into the flame to dilute air/fuel mixture.• Delayed combustion as well as cooler flame.• Very large spacing required between burners And burners are bigger in size.• Very tall flames.

34mcj

Page 35: Heater operation

HEATERBURNERS

New technology next generation Ultra Nox burner

• Nox less than 10 ppm• Employ combination of staged air, staged fuel, flue gas recirculation methods.

35mcj

Page 36: Heater operation

HEATEROur fuel specifications

Fuel oilLHV 9500-10000Viscosity @ 185oc 19-23 cstSulphur .4-.7 %N2 2000ppmNa 90-170ppmVa 2.5 ppmCCR 14-19 %C/H ratio 8.1 -8.3Nickel 36-52ppm

Fuel GasLHV 9000

H2S 300ppm

H2 15-20 %

C1 25.3%

C2 19.6%

C4 4%

C5 .2%

C6 Nil

mcj 36

Page 37: Heater operation

HEATEREfficiency

Fuel efficiency• Total heat absorbed divided by the total input of heat derived from the combustion of fuel

only. [Lower heating value basis.]

Thermal efficiency• Total heat absorbed divided by the total input of heat derived from the combustion of fuel plus

sensible heats from air fuel and any atomizing medium.

• The heat absorbed is equal to the total heat input minus the total heat losses from the system.

Total heat input – Stack losses – Radiation heat losses Efficiency = X 100 Total heat input

37mcj

Page 38: Heater operation

HEATERChecking

1. Tube external corrosion ,tube crack , colour change, bend.2. Arch area refractory damage.3. Bottom refractory damage, refractory bulging, bottom body bulging.4. Flame impingements on tubes.5. Coking on oil/ gas burners.6. Atomization of fuel oil.7. Fuel oil temperature/ viscosity.8. Tube over heating by flame impingement/ coking/ low coil flow.9. Tube support / retainer damages.

38mcj

Page 39: Heater operation

HEATERChecking

11 . Heater body red hot / paint damage due to over heat12 . Refractory damage.13 . Flame flash back.14 . Flame lift off [ high draft, high fuel gas pressure, atomizing steam / fuel oil

Dp more]15 . After burning or secondary combustion.[ re- ignition CO in convection

section ]16 . Pilot burner tip damages17 . Flue gas / combustion air leakages through burner plenum chamber.18 . Pilot lite off.19 . Skin temp raise20 . Arch temp raise

39mcj

Page 40: Heater operation

HEATERChecking

21 . Stack temp high/low.22 . Fuel oil/ gas leaks.23 . Incomplete combustion [ black smoke ]24 . More excess air [ over bright flame, and white smoke on stack]25 . Intermittent flame/ flame height more.26 . Condensate in atomizing steam[ sparkling flame].27 . Condensate in fuel gas.28 . High fuel oil/ gas firing pressure29 . Hot spots on tubes.30 . Flue gas leaks through air ducts.

40mcj

Page 41: Heater operation

HEATERChecking

31 . Check fuel oil pressure temp and flow , and steam tracing.32 . Ensure atomizing steam pressure, and condensate free.33 . Skin temperature- normal value 450- 4800C

34 . Stack damper condition35 . Air leaks[ open doors ,bolts joints]36 . Burner flame shape height , smoke.37 . Abnormal flue gas temperature in convection section.38 . O2 level in stack- 2-3% normal39 . Draft/ arch pressure.40 .Combustion air damper, opening. hot spot ,flame back up.

41mcj

Page 42: Heater operation

HEATERChecking

41 . Individual burner valve opening [ should not be pinched]42 . Individual burner air damper opening [ should be same for all burners]43 . Fuel oil viscosity, return header flow, steam tracing.44 . Dp of atomizing steam / fuel oil.45 . Burner tile conditions46 . Abnormal noise, whistling sound.47 . Flue gas temperature at APH inlet and outlet.48 . ID suction temperature.49 .Fluid coupling loading/ VFD . rpm indication.50 . Bearing cooling water temperature/ flow.

42mcj

Page 43: Heater operation

HEATERChecking

51 . Any abnormal sound/ vibration on coil jump over.

52 . Coil jump over supports ,coil outlet supports outside heater.

53 . Convection inlet flange leak, pressure reading.

54 . Igniter working condition.

55 . ID , FD motor amperages.

56 . Leakages through ID, FD , and ducts.

57 .ID, FD inlet outlet damper opening.

58 Clogging of FD inlet filter.

59 . ID suction pressure.

60 . ID, FD bearing temperature, vibration, sound.

43mcj

Page 44: Heater operation

HEATERChecking

61 . Soot blower steam valve conditions62 . Soot blowing steam condensate traps.63 . Soot blower poppet valve opening / closing/ passing.64 . Soot blower shaft condition after soot blowing[ retract or not]65 . Damage of castable refractory after soot blowing.66 . Pilot conditions, pilot air register condition, any flame flash back through pilot.67 . Convection outlet temperature reading68 . Radiation outlet individual pass out let temperature.69 . COT.70 . Box purging steam any passing.

44mcj

Page 45: Heater operation

HEATERChecking

71 . Peep hole damages, glass damages, rope damages etc.72 . Atomizing steam, fuel oil, gas valves passing/ gland leaks/wheel damages.73. Lp gas burner status. Lp gas flame arrestor dp. Lp gas pressure.74 . Hot well gas burner conditions. Flame arrestor dp, line plugging, condensate

carryover etc.75 . Hot well gas knock out drum level.76 . Fuel gas knock out drum level.77 . Fuel gas c/v SDV status, opening, gland leaks, SDV solenoid valve.78 . Fuel oil c/v SDV supply and return status.79 . Fuel header PCV opening [ supply/ return tie up].80 . Fuel oil heater steam/ condensate flow, temperature.

45mcj

Page 46: Heater operation

HEATERChecking

81 . Fuel oil supply return header pressures at battery limit.82 . Oil leakages through oil guns.83 . Any abnormal fuel gas/ flue gas smell near heater.84 . Leakages through SOBs.85 . Any instrument air leaks, near c/v s stack dampers.86 . Stack damper openings.87 . Acid corroded spots on the body.88 . Explosion door opening.89 . Analyzers readings.90 . Insulation damages.

46mcj

Page 47: Heater operation

HEATERChecking

91 . Heat resistant paint damage on heater body.92 . Heater body red hot bulging.93 . Velocity steam dryness.94 . Any abnormal vibration of coils due to velocity steam.95 . Radiation out let/ swing elbow flange leaks.96 . Oil soaking in insulation while start up after shut down.97 . Heater transfer line flange [ at column nozzle ] leak. 98 . Pass control valve openings, gland leak, coil pressure.99 . Emergency steam to be closed while heater starting.100 . Ensure plant air line blinds.101 . Ensure coil minimum flow.

47mcj

Page 48: Heater operation

HEATERDecoking

Thermal decoking : Using air and steam inside tubes , controlled firing in heater. [ It take more time, chance to tube metallurgy damage]

Mechanical decoking : Using water with pigs inside the tubes.

On line Spalling : Steam inside tube and firing in heater. One individual pass can be done on line. Coke removed by thermal shock. [ only in DCU heater]

48mcj

Page 49: Heater operation

HEATERdry out

• To be done after heater long shut down work or refractory work .• Controlled fire inside the furnace and steam inside the tubes .

49mcj

Page 50: Heater operation

HEATERproblems - reasons

Internal tube corrosion sulphur and naphthenic acid corrosionExternal tube corrosion metal oxidation, and by H2S04Erosion High velocity with solids, impingement on

fitting

Polythionic acid corrosion [ for steel tubes]on tube outside.

In hydro cracking /hydrode-sulphurisation heaters only.

Creep rupture damage Due to high tube temp [ skin]Hot spot / tube bulging Due to coking inside tube , flame

impingement , and by low coil flow /velocity.

Coking on fuel oil gun / oil dripping High viscosity , poor atomization , improper gun guide tube fitting.

50mcj

Page 51: Heater operation

HEATERproblems - reasons

Flame lift off high draftBack fire High arch pressure, burner coking , burner

tip damage , block inside burner chamberFlame impingement on tubes Burner tip coking , tip damage ,poor

atomizing .Sparkling flame Condensate in atomizing steamOver bright flame [ combination firing ] More excess airSmoky flame High fuel firing pressure , low combustion

air , poor atomizing , and burner cokingHigh arch pressure Over firing , stack damper/ ID problem ,

burner coke purging

51mcj

Page 52: Heater operation

HEATERproblems - reasons

High arch temperature Over firing , flame lift off , high gas firing pressure , secondary combustion .

Pulsating fire [ alternately ignite and goes out]

Lack of air and low draft

Excess smoke on stack Incomplete combustion , burner coking , poor atomizing , burner tip damage , less combustion air , and heater tube failure

Burner tile damage Due to sodium Vandate corrosion , Tube coloure change Ash burning , coking inside tube , flame

impingement

Tube support damage Flame impingement , hammering of tubes high temp oxidation ,

52mcj

Page 53: Heater operation

HEATERproblems - reasons

Tube sheet damage in convection section After burning , If Na, Va in fuel oil is more corrosion chance is more.

Refractory damages High arch temp, improper dry out , thermal shock due to fast temperature raise, soot blowing steam condensate , poor casting .

Hot spot / acid corroded holes on heater body

Refractory damages , flue gas entry inside the refractory bed gaps .

mcj 53

Page 54: Heater operation

HEATER

mcj 54

EMERGENCIES ACTIONSPass flow control valve / flow failure Closely monitor individual pass outlet

temp , put c/v in MAN mode or open b/p b/v.

Fuel oil trip Rectify the problem and start oil firingFuel gas trip Rectify the problem and restart firingHeater total trip Restart after rectifying problem , ensure

proper coil flow , and furnace draft , and ensure pilot flame .

Heater tube failure shut down the heater from remote emergency switch , cut the coil flow, open emergency coil steam,

Page 55: Heater operation

DO NOT

mcj 55

• Do not run heater with by passed interlocks • Do not pinch individual burners• Do not keep different openings in individual air louvers • In case of tube failure do not admit air into heater , use steam only • Do not run heater with fully closed stack damper

Use proper PPE s [ gloves , thermal protecting face shields ]

Page 56: Heater operation

HEATERCrude heater start up after shut down

• Purge Fuel gas line with N2.• Reset FG / pilot SOVs and charge fuel gas.• Flush fuel oil lines to CBD , Reset supply /return SDV s.• Establish fuel oil circulation in supply and return headers.• Purge individual oil lines up to oil gun [ to a drum ] and insert oil guns.• Line up all instruments.• Start cold oil circulation inside heater coils.• Wide open stack damper and box purge heater with steam [ 20

minutes].ensure draft.

56mcj

Page 57: Heater operation

HEATERCrude heater start up after shut down

• Start FD fan , open combustion air louvers, and purge heater with air.• Lite the pilot burners.• Lite FG burners. [ never lite from the adjacent burner]• Purge the FO burner with steam.• After gun purging open FO atomizing steam, then slowly open fuel oil and

adjust the flame.• After stabilizing start ID fan , and kept stack damper opening minimum .• Control arch pressure using ID fan speed, and stack damper opening.

57mcj

Page 58: Heater operation

Thank Youmc jomon 58