The 50 years old concrete roof of BAT Bangladesh was leaking, and leaking in spite of numerous efforts by its maintenance division. Their latest step of 'roofing felt' too failed to control the leaking. Astec Re-Ply System was installed by its authorized applicator in Bangladesh (Rafsha BD Ltd) in December 2012. The project management was very happy with the work because 'the problem roof' never leaked again till date. The presentation unfolds the waterproofing work in BAT Bangladesh. It was a tough job, but done easily.
Citation preview
BATB 28000 SFT Concrete Roof
Covered with bituminous felt for water proofing
? •But roofing felt did not sustain, and started leaking
Water got trapped under the felt and damaged the concrete surface
Cleaned andcleaned again
Carry our repairs where necessary
Pressure wash the surface at 3500-4000 psi
Bring in material of Astec Re-Ply System
Keep material in order and organized
1
• Apply masonry primer (CMCE)
• Apply the water proofing 1st coat (WPM#9)
2
• Water proofing in details
3
• Reinforce water proofing as and where necessary
4
• Commitment of 100% water proofing…
5
• ASTEC WPM#9 makes a seamless membrane over the surface
6
• 100% water proof roof surface all over…
7
• ASTEC#2000: Protective ceramic 1st coat in progress…
8
• 2nd coat of ASTEC#2000 complete.9
• Protected by ASTEC Re-ply System .
• Before ASTEC Re-ply System…• BATB roof with roofing felt
• Before ASTEC Re-Ply System BATB Roof... (After removing roofing felt)
• Before ASTEC Re-ply System…
• After ASTEC Re-ply System…
• BATB protected with ASTEC Re-ply System in 2013