Page 1: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Welcome to this presentation.

It will test you general knowledge as a Project Engineer.

Good luck!

Comments are most welcome ([email protected]),

which I will incorporate for the benefit of all.

Hervé

Page 2: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The Heat & Material Balance (HMB) shows the flowrate, conditions and

composition of process and utility streams.

Right or Wrong?

Page 3: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The Heat & Material Balance (HMB) shows the flowrate, conditions and

composition of process and utility streams.

Right or Wrong?

Wrong, only the process streams. Utility streams, such as cooling water

flowrate etc., are defined later on, once equipment is sized.

Page 4: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Consider a process unit with an INPUT and OUTPUT.

The following is true:

� INPUT flow rate (kg/hr) = OUTPUT flow rate (kg/hr) – True (mass

balance)

� INPUT flow rate (kmol/hr) = OUTPUT flowrate (Kmol/hr) – False, if

chemical reaction has occured

� INPUT enthalphy (kJ/hr) = OUTPUT enthalpy (kJ/hr) – False, if heat or

mechanical work has been exchanged with outside

PROCESS UNITINLET OUTLET

Page 5: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Consider a process unit with an INPUT and OUTPUT.

The following is true:

� INPUT flow rate (kg/hr) = OUTPUT flow rate (kg/hr) – True (mass

balance)

� INPUT flow rate (kmol/hr) = OUTPUT flowrate (Kmol/hr) – False, if

chemical reaction has occurred

� INPUT enthalpy (kJ/hr) = OUTPUT enthalpy (kJ/hr) – False, if heat or

mechanical work has been exchanged with outside

PROCESS UNITINLET OUTLET

Page 6: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which Engineering document do I need to estimate the cost of a

pressure vessel?

� The Process data sheet

� The Mechanical data sheet

Page 7: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which Engineering document do I need to estimate the cost of a

pressure vessel?

� The Process data sheet

� The Mechanical data sheet, as it indicates the equipment weight from

which I can estimate the cost (for pressure vessels, for instance, USD

4/kg for carbon steel and USD 12/kg for SS)

Page 8: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Per ASME B31.3, at which pressure shall piping be hydraulically tested?

� 1.5 times the design pressure

� 1.2 times the design pressure

� The design pressure

Page 9: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Per ASME B31.3, at which pressure shall piping be hydraulically tested?

� 1.5 times the design pressure

� 1.2 times the design pressure

� The design pressure

Page 10: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Mention 3 different ways to measure engineering progress

Page 11: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Mention 3 ways to measure engineering progress

� Weighting of documents and issue

� Milestones, e.g. Plot Plan IFC, P&ID IFC, etc.

� IFC issuance curves, e.g. m3 of IFC concrete, tons of IFC steel, tons of

IFC piping isometrics

Page 12: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which document issued by the Engineering Manager serves as reference

to all Engineering disciplines?

Page 13: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which document issued by the Engineering Manager serves as reference

to all Engineering disciplines?

The Engineering Design Data

Page 14: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which document issued by the Engineering Manager serves as reference

to all Engineering disciplines?

The Engineering Design Data

What are the contents of this document?

Page 15: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which document issued by the Engineering Manager serves as reference

to all Engineering disciplines?

The Engineering Design Data

What are the contents of this document?

� Feedstock conditions, composition,

� Products flow and specifications, performance guarantees

� Battery limits & battery limits conditions

� Design criteria

� Site climatic conditions: Min/max temperature, rain/snow, wind, seismic

� Applicable codes and standards

� Utilities conditions: Fuel gas composition, pressure, electric power: voltage etc.

� Regulatory requirements: Emission limits etc.

Page 16: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Put the following tasks in order

� HAZOP

� P&ID review meeting between COMPANY and CONTRACTOR

� Issue of P&IDs for Review (IFR)

� Issue of P&IDs for Design (IFD)

� Issue of P&IDs for Construction (IFC)

Page 17: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Put the following tasks in order

� Issue of P&IDs for Review (IFR)

� P&ID review meeting between COMPANY and CONTRACTOR

� Issue of P&IDs for Design (IFD)

� HAZOP

� Issue of P&IDs for Construction (IFC)

Page 18: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are these items reviewed in HAZOP or HAZID?

� ESD logic

� Equipment spacing

� Overflow of equipment

� PLANT location

� Overpressure hazard

� Building blast resistance

� Fire & Gas detection

Page 19: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are these items reviewed in HAZOP or HAZID?

� ESD logic - HAZOP

� Equipment spacing - HAZID

� Overflow of equipment - HAZOP

� PLANT location - HAZID

� Overpressure hazard - HAZOP

� Building blast resistance - HAZID

� Fire & Gas detection - HAZID

Page 20: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are the following documents used in HAZOP or HAZID?

� P&IDs

� Cause & Effects

� PFDs

� Plot Plan

� H&MB

Page 21: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are the following documents used in HAZOP or HAZID?

� P&IDs - HAZOP

� Cause & Effects - HAZOP

� PFDs - HAZID

� Plot Plan – HAZID

� H&MB - HAZID

Page 22: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are the following disciplines attending HAZOP, HAZID or both?

� Process

� Safety

� Plant layout

Page 23: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Are the following disciplines attending HAZOP, HAZID or both?

� Process - HAZOP

� Safety - HAZID

� Plant layout - HAZID

Page 24: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The Inspection and Test Plan specifies the extent of Non Destructive

Examination and tests.

Right or wrong?

Page 25: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The Inspection and Test Plan specifies the extent of Non Destructive

Examination and tests.

Right or wrong?

Wrong, it specifies the attendance -or not- of the Purchaser to these

examination and tests. The extent is specified of examination/tests in

the code.

Page 26: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

To specify means to define the duty whereas to design is to size.

Right or wrong?

Page 27: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

To specify means to define the duty whereas to design is to size.

Right or wrong?

Right

Page 28: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The material requisition contains

� The quantities to be supplied

� The technical requirements

� The inspection requirements

� The list of applicable documents

Page 29: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The material requisition contains

� The quantities to be supplied

� The technical requirements – Wrong: The technical requirements are

contained in the specification(s) and the data sheet. The MR gives the

list of the applicable specification(s) and data sheet but does not

contain the technical requirements themselves.

� The inspection requirements – Wrong: these are found in the

spec/code.

� The list of applicable documents

Page 30: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

For more information and…

to get on top of Engineering in hours, not years!

Get the Guide!

Page 31: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

Get familiar with the 200 most common engineering deliverables

Page 32: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

Get familiar with the 200 most common engineering deliverables

Page 33: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

Get familiar with the 200 most common engineering deliverables

Page 34: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

For more information and…

to get on top of Engineering in hours, not years!

A unique synthesis and

reference manual

200 pages, 250 illustrations

Page 35: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

For more information and…

to get on top of Engineering in hours, not years!

A unique synthesis and

reference manual

200 pages, 250 illustrations

To browse the book:

http://goo.gl/dfDrS

Page 36: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

For more information and…

to get on top of Engineering in hours, not years!

A unique synthesis and

reference manual

200 pages, 250 illustrations

To browse the book:

http://goo.gl/dfDrS

To order with a 30% discount:

http://goo.gl/J3TkE

Page 37: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which discipline defines the diameter of lines?

Page 38: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which discipline defines the diameter of lines?

Process

Page 39: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Not endorsed data and rely-upon data mean the same thing.

Right or Wrong?

Page 40: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Not endorsed data and rely-upon data mean the same thing.

Right or Wrong?

Right. It means the Engineer is not responsible for this data. If it changes,

the Engineer is entitled to a change order.

Page 41: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

On an typical large EPC Project of 3 year duration, the IFC P&IDs are

usually issued at which month of the Project?

� Month 6

� Month 9

� Month 12

� Month 15

� Month 18

Page 42: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

On an typical large EPC Project of 3 year duration, the IFC P&IDs are

usually issued at which month of the Project?

� Month 6

� Month 9

� Month 12

� Month 15

� Month 18

Page 43: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which discipline defines the wall thickness of lines?

Page 44: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Which discipline defines the wall thickness of lines?

Piping

Page 45: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

As per the piping code for oil & gas plants (ASME/ANSI B31.3), the wall

thickness of a line

� Is proportional to the line diameter

� Is proportional to the square of the line diameter

� Is proportionally to the line pressure

� Is proportionally to the square of the line pressure

� Depends on the manufacturing process of the line pipe

Page 46: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

As per the piping code for oil & gas plants (ASME/ANSI B31.3), the wall

thickness of a line

� Is proportional to the line diameter

� Is proportional to the square of the line diameter

� Is proportionally to the line pressure

� Is proportionally to the square of the line pressure

� Depends on the manufacturing process of the line pipe: w.t. of

seamless pipe is less than that of welded pipe

Page 47: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The essential electrical power consumers are defined by

� Safety

� Electrical

� Process

Page 48: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The essential electrical power consumers are defined by

� Safety

� Electrical

� Process: they are the consumers to which backed-up (diesel) power

shall be supplied

Page 49: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

This question relates to the respective roles within the Engineering

personnel. The question is:

The designer performs the calculations and the Engineer check them.

Right or wrong?

Page 50: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

This question relates to the respective roles within the Engineering

personnel. The question is:

The designer performs the calculations and the Engineer check them.

Wrong, calculations are done by Engineers.

Page 51: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Carbon steel withstands temperature down to:

� -46°C

� -29°C

� -20°C

� 0°C

Page 52: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Carbon steel withstands temperature down to:

� -46°C

� -29°C

� -20°C

� 0°C

Page 53: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

For each of the following equipment, does Engineering specify of design?

� Heat exchangers

� Rotating equipment

� Packages

� Pressure Vessels

� Boilers

� Fired Equipment

Page 54: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

For each of the following equipment, does Engineering specify of design?

� Heat exchangers – design shell & tubes, specifies other types

� Rotating equipment - specifies

� Packages - specifies

� Pressure Vessels - designs

� Boilers - specifies

� Fired Equipment - specifies

Page 55: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

What is the governing factor that determine the strength of pipe-rack?

� Number and size of supported pipes

� Wind

Page 56: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

What is the governing factor that determine the strength of pipe-rack?

� Number and size of supported pipes

� Wind, as wind exercises horizontal loads, which have much more

impact on the design than vertical loads

Page 57: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

What is the governing factor for the sizing of steel members of pipe-

racks/structures?

� Steel yield strength

� Structure deflection

Page 58: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

What is the governing factor for the sizing of steel members of pipe-

racks/structures?

� Steel yield strength

� Structure deflection

Page 59: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The following is adjusted at Site during commissioning/Start-Up

� Settings of controllers

� Settings of alarms

� Setting of trips

Page 60: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The following is adjusted at Site during commissioning/Start-Up

� Settings of controllers

� Settings of alarms

� Setting of trips

Page 61: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The P&ID review entails:

� checking that the needed alarms and trips are provided

� checking that the required equipment and valves isolations are

provided

� checking that the drains, vents are provided

� checking versus similar equipment/unit P&ID

� checking the adequacy of the equipment design pressure and

temperature

� checking the allocation of piping class and insulation type

Page 62: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The P&ID review entails:

� checking that the needed alarms and trips are there

� checking that the required equipment and valves isolations are

provided

� checking that the drains, vents are provided

� checking versus similar equipment/unit P&ID

� checking the adequacy of the equipment design pressure and

temperature

� checking the allocation of piping class and insulation type

Page 63: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Piping (ASME) flanges exist up to

� 16” and 2500 lbs ?

� 24” and 2500 lbs?

� 36” and 1500 lbs?

� 48” and 1500 lbs?

Page 64: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Piping (ASME) flanges exist up to

� 16” and 2500 lbs, above that hubs (see picture) have to be used

� 24” and 2500 lbs?

� 36” and 1500 lbs?

� 48” and 1500 lbs?

Page 65: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Instrumentation discipline is split in 3 specialties:

� Field instrumentation

� Systems

� Installation

Right or Wrong?

Page 66: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Instrumentation discipline is split in 3 specialties:

� Field instrumentation

� Systems

� Installation

Right

Page 67: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Stress calculations are required for:

� large diameter lines

� thick lines

� fragile lines

� lines subject to high temperature

� lines connected to rotating equipment

Page 68: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Stress calculations are required for all the types listed!

� large diameter lines

� thick lines

� fragile lines

� lines subject to high temperature

� lines connected to rotating equipment

Page 69: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The NDE requirements for a pressure vessel are specified in:

� The engineering specification

� The engineering data sheet

� The engineering requisition

� The code

Page 70: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The NDE requirements for a pressure vessel are specified in:

� The engineering specification

� The engineering data sheet

� The engineering requisition

� The code

Page 71: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The wall thickness of lines is indicated on which of the following

engineering document(s)?

� the P&ID

� the line list

� the piping class specification

� the isometric drawing

Page 72: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The wall thickness of lines is indicated on which of the following

engineering document(s)?

� the P&ID

� the line list

� the piping class specification – not for large diameters for which the

w.t. is calculated with the line design pressure!

� the isometric drawing

Page 73: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Electrical discipline is split in 2 specialties:

� Medium Voltage (MV)

� Low voltage (LV), lighting and small power

Right or Wrong?

Page 74: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Electrical discipline is split in 2 specialties:

� Medium Voltage (MV)

� Low voltage (LV), lighting and small power

Wrong

Page 75: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Piping routing drawings are produced at FEED stage.

Right or Wrong?

Page 76: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Piping routing drawings are produced at FEED stage.

Right or Wrong?

Right, but for main process lines only. This is where the money is.

Remember that the FEED is to estimate the cost – and allow EPC

contractors to bid.

Page 77: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Engineering is a

� Linear

� Iterative

Process?

Page 78: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Engineering is a

� Linear

� Iterative: documents undergo revisions as design develops

Process?

Page 79: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The following documents contain redundant information

� P&ID and line list

� Process Data Sheet and consumers list

� Process Data sheet and Mechanical Data Sheet

� P&ID and instrument list

� Heat & Material Balance and Process Data Sheet

� All of the above

Page 80: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The following documents contain redundant information

� P&ID and line list: line numbers, piping class

� Process Data Sheet and consumers list: power consumption

� Process Data sheet and Mechanical Data Sheet: design pressure/temp

� P&ID and instrument list: instrument numbers

� Heat & Material Balance and Process Data Sheet: flowrate, operating

conditions

� All of the above

Page 81: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The design and construction code applied in the Oil & Gas industry for

pressure vessels is

� ASME VIII

� API 5L

� ANSI B31.3

� ASME I

Page 82: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

The design and construction code applied in the Oil & Gas industry for

pressure vessels is

� ASME VIII

� API 5L

� ANSI B31.3

� ASME I

Page 83: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Post Weld Heat treatment is specified by Piping and Pressure Vessel

codes above a certain

� Temperature

� Pressure

� Wall thickness

Page 84: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

The Oil & Gas Engineering Quiz

Post Weld Heat treatment is specified by Piping and Pressure Vessel

codes above a certain

� Temperature

� Pressure

� Wall thickness: above 19.7mm for piping (ANSI B31.3) and above

38mm for ordinary CS plates (ASME VIII div. 1)

Page 85: The oil & gas engineering quiz

HERVE

BARON

©2

01

3 –

He

rvé

Ba

ron

http://www.toblog.fr/en/baron.html

Not yet fed up?

Come for more!

Attend my classroom training

Find out the coming sessions near you on my blog:

Going further