1
Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Rm 1512-13,Grand Century Place, Tower 1, 193 Prince Edward Road West, Mongkok, Kowloon, Hong Kong SAR Tel: (852) 2311-1123 Fax: (852) 2723-6019 E-mail: [email protected] TM Sun Yat Sen Memorial Park and Swimming Pool Complex Contract No.: SS S311 Application: Field Drainage Product: Goldline 300mm, Multi-Flow 150mm Main Contractor: China State Construction & Engineering Company Limited Date: August 2009 Traditionally, corrugated HDPE sub-soil pipes are used for the removal and relocation of excess soil water. In this job, Goldline pipes are responsible for turf drainage with comply the flow rate requirement of FIFA. In order to cater the surface flooding at the planter area, Multi-Flow drainage system has been installed. Goldline drainage system provides economical method for turf drainage. It is the most traditional drainage system for constructing new turf. For the planter drainage, 1” thick Multi-Flow drainage system is used to remove the excess soil water and prevent from surface flooding. Multi-Flow pipes were installed vertically and the outlets are connected to the PVC pipes for discharging. Multi-Flow requires no trenching due to its flat profile and strength. A thin layer of filters sand is recommended for better drainage performance.

Sun yat sen memorial park and swimming pool complex

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Sun yat sen memorial park and swimming pool complex

Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History

Rm 1512-13,Grand Century Place, Tower 1, 193 Prince Edward Road West, Mongkok, Kowloon, Hong Kong SARTel: (852) 2311-1123 Fax: (852) 2723-6019 E-mail: [email protected]

TM

Sun Yat Sen Memorial Park and Swimming Pool Complex

Contract No.:

SS S311

Application:

Field Drainage

Product:

Goldline 300mm, Multi-Flow 150mm

Main Contractor:

China State Construction & Engineering

Company Limited

Date:

August 2009

Traditionally, corrugated HDPE sub-soil pipes are used for the

removal and relocation of excess soil water. In this job, Goldline

pipes are responsible for turf drainage with comply the flow rate

requirement of FIFA. In order to cater the surface flooding at the

planter area, Multi-Flow drainage system has been installed.

Goldline drainage system provides economical method for turf

drainage. It is the most traditional drainage system for

constructing new turf. For the planter drainage, 1” thick Multi-Flow

drainage system is used to remove the excess soil water and

prevent from surface flooding.

Multi-Flow pipes were installed vertically and the outlets are

connected to the PVC pipes for discharging. Multi-Flow requires

no trenching due to its flat profile and strength. A thin layer of filters

sand is recommended for better drainage performance.