Future Service Station Energy Future Service Station Energy- Feasibility Feasibility BP Case Study – Average Daily kWp Power Consumption The daily average Peak power usage is ± 40 kWp. The daily average Peak power usage is ± 40 kWp. Our System is designed to generate 40 kWp aſter losses. Our System is designed to generate 40 kWp aſter losses. Using 260 Wa panels, the quanty needed is 170 Panels with Panels area being 354 m Using 260 Wa panels, the quanty needed is 170 Panels with Panels area being 354 m ² ² The cost being approx. R600 000 with R25 000 per month savings. The cost being approx. R600 000 with R25 000 per month savings. Please note that the financial figures are based on the case study, and may vary due to power usage being different for ever Please note that the financial figures are based on the case study, and may vary due to power usage being different for ever y s y s taon. To be taon. To be able to aain a quotaon, please contact us for a feasibility study and a energy audit. able to aain a quotaon, please contact us for a feasibility study and a energy audit. www.greenhabitat.co.za www.greenhabitat.co.za

Summary & green habitat bp case study

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Summary & green habitat bp case study

Future Service Station EnergyFuture Service Station Energy-- FeasibilityFeasibility

BP Case Study – Average Daily kWp Power Consumption

The daily average Peak power usage is ± 40 kWp.The daily average Peak power usage is ± 40 kWp.

Our System is designed to generate 40 kWp after losses.Our System is designed to generate 40 kWp after losses.

Using 260 Watt panels, the quantity needed is 170 Panels with Panels area being 354 mUsing 260 Watt panels, the quantity needed is 170 Panels with Panels area being 354 m² ²

The cost being approx. R600 000 with R25 000 per month savings.The cost being approx. R600 000 with R25 000 per month savings.

Please note that the financial figures are based on the case study, and may vary due to power usage being different for everPlease note that the financial figures are based on the case study, and may vary due to power usage being different for every sy station. To be tation. To be

able to attain a quotation, please contact us for a feasibility study and a energy audit.able to attain a quotation, please contact us for a feasibility study and a energy audit.