Six Sigma Intro
A brief overview on the breakthrough methodology for Quality
Management
Matteo Casadio Strozzi - all rights reserved 2
What is hidden behind “Six Sigma”?
A strange word and a blurred image, that is the most widespread knowledge on Six-Sigma.
There is lot of confusion on what is the real meaning of “Six Sigma”:• does it deal with statistics?• does it deal with numbers?• can only big companies run it?• is it quality-driven?• is it money-driven?• …
Let’s clarify what Six Sigma SHOULD be for a company.
Matteo Casadio Strozzi - all rights reserved 3
What is Six Sigma?Project
Management
Data driven DSS
Economic project selection
Training path
Money saving
DMAIC (Define, Measure, Analyze, Improve, Control ) is nothing but a PM method to build and manage strong and effective projects.
Six Sigma applies statistics to business case to enforce the reliability of choices.
Every project must be also evaluated for the economic impact, thus driving the improvement on the real priorities.
Only skilled person can be effective on projects. Belts, Champions are people that must be trained to follow the projects.
Improvement are economically evaluated and weighted. Cost and benefits can be easily compared.
Matteo Casadio Strozzi - all rights reserved 4
What is Six Sigma?Project
Management Organization
Tool box
Matteo Casadio Strozzi - all rights reserved 5
Why “Six Sigma”?
1
)( 2
n
xxi�
Sigma = = Deviation
( Square root of variance )-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7
Axis graduated in Sigma
68.27 %
95.45 %
99.73 %
99.9937 %
99.999943 %
99.9999998 %
result: 317300 ppm outside (deviation)
45500 ppm
2700 ppm
63 ppm
0.57 ppm
0.002 ppm
between + / - 1between + / - 2between + / - 3between + / - 4between + / - 5between + / - 6
What is Six Sigma goal?
Stop the waste of money managing changes through team
work.
Better use of resources
Is Six Sigma risk-free?Implementing Six Sigma, as well as any other changing management system (i.e Lean) is not risk free:1. Organizational changes: Six Sigma needs an internal structure to sustain the
improvement projects (Master Black Belt, Black Belt, Green Belt…) and this is a long-term project;
2. Long term commitment: like any other long term changing process, the reached goal is only a new starting point. Struggle to reach the best is the real push to be better, every day.
3. Failure: …the worst project is a never-ending one. It is better to celebrate failure rather than never close a project at all. Failure happens, that is why project selection is a focus phase at the beginning. Choosing the easy-to-go project can be a good trigger for empowering changing.
4. Holistic vision: if not sure, do not start. Six Sigma is a big, challenging and intense journey. Six Sigma is a incredible saving machine that (after all) needs fuel to work. A test-project is worth only to tune the effort, not if you still need to decide whether or not start.
Is Six Sigma flexible?Every company needs to have its own standard to implement Six Sigma. Even if there are some basics to “respect”, there is not a certified Six Sigma path or any ribbon to wear.Lean Six Sigma is the proof that not all the Company can follow GE or Motorola approach.
ISO has started an international work for standardizing the Six Sigma approach: is it still quite doubtful if or when it will deliver.
Every company should focus on what is needed to improve processes, then approach an improvement system.
No certification is worldwide acknowledge.
Six Sigma is without any doubt a powerful
mean,
It must be (carefully) handled.
Matteo Casadio Strozzi - all rights reserved 9
Six Sigma and projects
Mainly related on energy saving projects and improving test and R&D cost and time, Six Sigma project in Chemical Industry are now a reality.
Every process (operative and not) can be improved, Six Sigma is the breakthrough innovative system to manage changing from INSIDE.Six Sigma provides the structure, the methods, the tools to handle changing and improvement management.
Industry Project LT Investment Savings PBT
Chemical Air control 20 wks 1.500 € 13.500 € /yr
Chemical N2 use 16 wks 5.000 € 20.00 € /yr 3 monthes
Chemical Drying air 34 wks 50.000 € 76.000 € /yr 8 monthes
Compound Plant improvement 16 wk * 70.000 € 20.000 € /yr 3,5 yrs
* Improvement and Control phase excluded.
Matteo Casadio Strozzi - all rights reserved 10
Six Sigma: pro and consIs Quality improvement necessary to compete?
Is Six Sigma mandatory to improve Quality?
Is Lean or TPS mandatory to improve Quality?
Is Six Sigma a structured system developed through experience to help companies to reach best-in-class
standards?
Is Six Sigma free?
YESNO
NOYES
NOIs Six Sigma worth? THIS IS UP TO YOU!
Matteo Casadio Strozzi - all rights reserved 11