Prepared by John Petak 1
Change Over / Set up Reduction
War on Waste
Prepared by John Petak 2
Session Length: Varies depending on operation.
Objectives:1.To understand the concepts and principles of Setup Reduction.2. To understand the benefits of Setup Reduction.3. To apply the concepts, principles and techniques of Setup Reduction.
Change Over Reduction / Setup
Prepared by John Petak 3
Materials: Setup Reduction
Forms:Set-up Operations Analysis
ChartSet-up Operations Standard
forms Summary of Results Sheet.
Change Over Reduction / Setup
Prepared by John Petak 4
Producing At Minimum
Quantity
Prepared by John Petak 5
Introduction:You must ensure that all individuals understand:
•Decreasing setup time•Reducing Inventory Need•Creating Flexibility & Capacity•Serving the Customer
Change Over Reduction / Setup
Prepared by John Petak 6
Furthermore, it is key to developing and maintaining a company’s competitiveness in today’s market. This session will highlight these factors through the use of Change Over Setup Reduction.
Change Over Reduction / Setup
Prepared by John Petak 7
To respond more quickly to customer demand : Constantly reduce process change time. Decrease the cost of each process change . Be able to make more process changes in the
same opening time . Produce the precise quantities within a
minimizedlead time .
Be able to reduce the size of the batches manufactured .
WHY Change Over Reduction / Setup?
Producing and Servicing in small batches … has its advantages !
•Stock Reduction• Improved Reaction•Surface Reduction• Improved Lead Times• Improved Management
8
Prepared by John Petak 9
The drawback ………
…………………………… production change times are too long
Producing in small batches is economically acceptable only if production change times are reduced .
10
What is Changeover / Setup Reduction?
Method of reducing production change time .
Batch no. 1last good part
Batch no. 2first complyingpart
TIME
11
Prepared by John Petak 12
Implementation Process
Implementthe
actions
Measureand
stabilize
Adjustand
correct
Setup / Reduction
Form the Work
group Set theobjective
Observe what exists
Extract Convert Propose
improvement actions
Prepared by John Petak 13
The old production is in process: determine the events to observe, determine the elements to measure, define the ‘‘triggers’’ which delimit the events
The old production is stopped: start-up of continuous observation; any gesture or action lasting more than 30 seconds must be recorded;
The machine is freed (of the residual elements of the
preceding series) The tool is changed The adjustments are made The new production is launched
Observe What Exists
Prepared by John Petak 14
EXTRACTION : "internal" operations possible to convert into "external " operations .
SIMPLE CONVERSION : "external" operations which can be "extracted" immediately .
CONVERSION TO BE STUDIED: "external" operations which can be "extracted" after a technical modification.
REDUCE : make the operation quicker, safer, less tiring
Draw up the "ACTIVITY DIAGRAM"
Synthesis of the observation
Prepared by John Petak 15
Classify internal/external operations
" INTERNAL " operation = operation which must be performed when the machine is stopped (ex.: loosening a tool to be changed) ;
" EXTERNAL" operation = operation required by the production change but which does not require that the machine be stopped (ex.: filling in a document) ;
Prepared by John Petak 16
• Formalize the action plan.• Rank priorities.• Evaluate gains action per action.• Estimate the investment and
request it.• Appoint a leader and a lead time
for each action.
Propose Improvement Actions
Prepared by John Petak 17
Implementing the Actions
• The ACTION PLAN becomes the structure for the progress achieved.
• The APPLICATION of decisions engages the future.
• The project must be GUIDED with prudence, determination and rigor .
Prepared by John Petak 18
Stabilize, Adjust, Correct
• Above all, it is indispensable to measure results *:
• AT THE STATION - duration of operations , throughput buildup, incidents , etc.
• ON THE TOOLS - number , uses, modifications , etc.
• ON THE ENVIRONMENT - customer order, inventory, administration , etc.
Prepared by John Petak 19
Changeover Tracking Chart
Prepared by John Petak 20
Weekly Tracking Chart
Prepared by John Petak 21
Selecting Machines and Setups
• When selecting the machines to be studied and part setups to be analyzed one must consider:
• machine utilization• assigned product mix• current setup lengths
• Efforts should be focused on the setups that will yield the most gain. Identifying the appropriate setups on a machine should not last more than a day.
Prepared by John Petak 22
Adopting a Systematic Approach
• Videotape setup operations• After scheduling a setup videotaping, a
short informal meeting (10-15 minutes) should be conducted with the machine operator responsible for setting up the machine.
• Explain to the operators that they must remain as natural as possible.
• The team at this time may also determine where to set up the video camera.
• Set up recording starts when the last part of the preceding lot is processed, and the recording stops when the first good part of the next lot is processed.
Prepared by John Petak 23
Adopting a Systematic Approach
• Videotape setup operations• Enough blank tapes must be
available as some setups last several hours.
• The camera must not be stopped when the operator leaves the machine for any setup related operation.
• Take notes! One team member controls the camera while another takes notes.
Prepared by John Petak 24
Adopting a Systematic Approach
• Analyze the videotape• Decompose the setup into elementary
operations. Manually or using spreadsheet software.
• Define each operation.a. An operation is the smallest identifiable
action performed by the operator.• Determine beginning and ending times.
a. Each operation has a well defined starting and ending point.
• Calculate operation length.a. Subtract the current operation’s beginning
from the next operation’s beginning time.
Prepared by John Petak 25
Adopting a Systematic Approach
• Analyze the videotape• Group operations into classes.
a. 10 classes maximum and break down the setup into sequential categories.
• Compute and chart class-time percentages.
a. time spent on each class and percentage of the initial setup are computed.
b. each class total time is computed.
Prepared by John Petak 26
Adopting a Systematic Approach
• Identify problems and search for solutions.
• Team members develop ideas for improvement by answering, what can be eliminated, simplified or transferred to an external operation.
• To give the meetings structure Pareto charts or cause and effect diagrams may be used.
• Every idea is discussed and the list of final solutions is recorded.
Prepared by John Petak 27
Adopting a Systematic Approach
• Evaluate the improvements: Estimate the gains.
• Operation improvements are listed by writing solution numbers and estimated time reductions.
• Internal time(when machine is not running), external time (while machine is running), and total time reductions ( internal-time reduction subtracted from the setup time to be performed externally).
Prepared by John Petak 28
Adopting a Systematic Approach
• Evaluate the improvements: Estimate the costs.
• Consult internal resources, as a function of internal hourly rate and cost of materials.
• Present the solutions to management. Include the following:
• Brief machine description• List of classes and percentage
breakdown (pie chart)• List of solutions and time-reduction
breakdown (pie chart)• Time reduction• Brief description of each proposed
solution.
Prepared by John Petak 29
Adopting a Systematic Approach
• Implement the solutions• Solution implementation immediately follows solution validation.
• Necessary equipment is purchased and machine modifications are made.