Page 1: Royal enfield company ltd   copy

1. NISHANT SADHWANI - 47

2. ARNAV KHAMKAR - 24

3. VENKATESH CHOUTAPELLI - 12

4. VISHAL WAVHAL - 66

Page 2: Royal enfield company ltd   copy
Page 3: Royal enfield company ltd   copy

In 1893, the Enfield Manufacturing Company Ltd was registered to manufacture bicycles, adopting the branding Royal Enfield.

The legacy of weapons manufacture is reflected in the logo, a cannon, and their motto "Made Like A Gun". Their first motorcycle was built in 1901.

In 1955, Enfield Cycle Company partnered with Madras Motors in India in forming Enfield of India, based in Chennai, and started assembling the 350 cc Royal Enfield Bullet motorcycle in Madras.

The original Redditch, Worcestershire based company dissolved in 1971, but Enfield of India continued, and bought the rights to use the Royal Enfield name.

Page 4: Royal enfield company ltd   copy

Master Production Schedule (MPS)

MPS is a means of communication, a Link or Contract between Marketing and Manufacturing.

It is a plan of what is to be produced and when

It is an agreed upon plan between marketing and manufacturing.

The MPS is a priority Plan for Manufacturing.

It is not meant to be rigid. It is the basis to make changes that are consistent with the demands of the marketplace and the capacity of manufacturing.

Page 5: Royal enfield company ltd   copy

Manufacturing Planning & Control System (MPC) : Framework

Page 6: Royal enfield company ltd   copy
Page 7: Royal enfield company ltd   copy

Manufacturing Resource Planning

Page 8: Royal enfield company ltd   copy

MarketDemand

Productionplan

Problems?

Rough-cutcapacity planning

Yes No YesNo

Finance

Marketing

Manufacturing

Adjustproduction plan

Masterproduction schedule

MRP

Capacityplanning

Problems?Requirements

schedules

Adju

st m

aste

r sc

hedu

le

Page 9: Royal enfield company ltd   copy

JIT/Lean Production

CustomerAssembly

Assembly

Production

Production

Production

Page 10: Royal enfield company ltd   copy

Production Planning & Control(PPC)

Page 11: Royal enfield company ltd   copy

PRODUCTION SYSTEM

System is a whose function is to convert a set of inputs into a set of desired outputs.

Page 12: Royal enfield company ltd   copy

Planning+ Control = Productivity

Page 13: Royal enfield company ltd   copy

PRODUCTION PLANNING

Given a specific process planning, process technologies and production conditionspredetermine varieties, quantities, quality, and scheduled of products to be produced according to market demand of products.

Page 14: Royal enfield company ltd   copy

TIME DIMENSIONS• Long Range Planning;

is done annually and focus on a planning horizon greater than one year.

• Medium Range Planning; usually covers a period from 6 months to 18 months, with monthly or sometimes quarterly time increments.

• Short Range Planning; covers a period from one day or less to six months, with weekly time increment usually.

Page 15: Royal enfield company ltd   copy

PRODUCTION PLANNING

• PLANNING• ROUTING• SCHEDULING• LOADING

Page 16: Royal enfield company ltd   copy

PRODUCTION CONTROL

• DISPATCHING• FOLLOWING UP• INSPECTION• CORRECTIVE

Page 17: Royal enfield company ltd   copy

CONCLUSION…

Royal Enfield is now the oldest motorcycle brand in the world still in production with the Bullet model enjoying the longest motorcycle production run of all time. Royal Enfield of India now sells motorcycles in over twenty countries.