5
Deconstruct UK case study for the construction sector. Client: Blenheim House Construction Location: St Anne’s Court, London W1 Contractor: Deconstruct UK Ltd Completion Date: September 2011 Sector: Construction

Removal of asbestos containing materials prior to conversion

Embed Size (px)

DESCRIPTION

Removal of asbestos containing materials from former recording studios, prior to conversion into a hotel.

Citation preview

Page 1: Removal of asbestos containing materials prior to conversion

Deconstruct UK case study for the construction sector.

Client: Blenheim House ConstructionLocation: St Anne’s Court, London W1

Contractor: Deconstruct UK LtdCompletion Date: September 2011

Sector: Construction

Page 2: Removal of asbestos containing materials prior to conversion

About the Project:

Removal of asbestos containing materials from former recording studios, prior to conversion into a hotel.

Deconstruct were contracted to demolish theadjoining office building at Carlisle Street and stripthe St Anne’s Court building back to shell and core.

Asbestos was present throughout both propertiesand had to be completely removed prior to

demolition and strip out.

The majority of the asbestos was asbestos insulation board (AIB) located behind the acoustic panelling within the

basement recording studios.

Page 3: Removal of asbestos containing materials prior to conversion

Project Challenges:

With the asbestos insulation board being located behind the acoustic panelling, it was necessary to incorporate the removal of the panelling within the asbestos removal operation.

Deconstruct asbestos removal teams had to deconstruct 6 layers of acoustic boarding and panelling to access and remove the asbestos.

The fixings and fittings that secured the acoustic panelling, passed through the asbestos and had to be carefully removed, to avoid uncontrolled damage to the asbestos.

A considerable amount of contaminated waste was generated from these works. The waste needed to be carefully transferred from the basement working area, to ground floor level, for collection on a ‘wait and load’ basis.

The waste transfer process was a very labour intensive operation.

Page 4: Removal of asbestos containing materials prior to conversion

Services provided by Deconstruct UK:

Our services:

Deconstruction Services ✓Demolition Services ✓Enabling Works ✓Asbestos Removal Services ✓Asbestos Surveying Services ✓Ground Works Services ✓Piling Services

Steelwork Installations ✓Builders Works ✓Emergency Dangerous Structures

Temporary Works ✓

Page 5: Removal of asbestos containing materials prior to conversion

Contact Details:

Deconstruct (UK) LimitedSilver House, 31-35 Beak StreetLondonW1F 9DPTel: 020 7734 6655Fax: 020 7734 6626

Email [email protected] Address www.deconstructuk.com

For more information about this case study, visit our case studies page here: www.deconstructuk.com