Decongesting Nairobi Roads
Commuter Rail Upgrade Programme
NDUVA MULIMANAGING DIRECTOR
10/04/23
2
ENCROACHMENT ALONG MAINLINE AT MUKURU
EMERGENCY LOADING CONDITION OF COMMUTER TRAINS
A LITTLE CROWDED
TOILET
INTERIOR CONDITION OF EXISTING COACHES
10/04/23 5
PROPOSED CONDITION OF TRACK FOR COMMUTER TRAINS
April 10, 2023
610/04/23 6
END PRODUCT: TYPICAL DIESEL ELECTRIC MULTIPLE UNIT FOR PROPOSED NAIROBI RAIL COMMUTER SERVICES
TYPICAL INTERIOR OF A MODERN DEMU COACH
10/04/23
8
PROPOSED MODERN RAILWAY STATION
The has been no significant investment in commuter rail transport in Nairobi for many years,
No rapid mass transit system exists, Except for the new road bypasses the road
network has not expanded, The population has grown exponentially, Vehicle numbers have increased significantly, AS A RESULT THE CITY IS FACED WITH
SERIOUS TRAFFIC CONGESTION.
KR has a significant rail network around the city of Nairobi that can play a significant role in providing fast, efficient and reliable commuter services around the city
This network is under utilized and with expansion and modernization the system can provide a major alternative to commuter transport in Nairobi
KR has therefore developed concrete plans to modernize and expand the commuter rail services in Nairobi to provide a High quality High capacity Fast Reliable SafeCommuter Rail Service
April 10, 2023
1210/04/23 12
LIMURU
THIKA
NAIROBI
AIRPORT
LUKENYA/KITENGELA
MAKADARAPROPOSED RAILCOMMUTER SERVICES ROUTES - NRB
E/VILLAGE
KR has a project development plan to guide the way forward with regard to implementation of the expansion and modernization of the commuter rail transport services for Nairobi.
This commenced in April 2009 and the plans are complete.
The next step is to move to implementation.
The project will be implemented in three phases:
Phase 1 (the core system) considered financially viable will cover the following routes:o Nairobi – JKIAo Nairobi – Embakasi Villageo Nairobi – Ruiru, ando Nairobi – Kikuyu
Phase 2 will extend rail commuter services to Thika, Limuru and Lukenya/Kitengela
04/10/23 KR initiatives
15
Core system Destinations
PHASE 1 AND PHASE 2 IMPLEMENTATION PLANS
Phase 3 will provide the missing links as follows:From To Passing through km
Nyayo Stadium
Kiserian
Bomas, O/Rongai 33
Riruta Kiserian
El Bulbul, Ngong, Matasia 42
Nairobi Kikuyu Westlands, Kangemi, Uthiru, Rironi,
35
JKIA Dandora
Ruai 15
Kiambu Githurai
15
TOTAL 140
04/10/2317
PLANS FOR RAIL COMMUTER SERVICES GREATER NAIROBI
New Stations will be developed at: Embakasi Village Pipeline Donholm Githurai, Mwiki Buru Buru, Imara Daima, Jomo Kenyatta International Airport, Kibera and Lenana.
Justification: Provide alternative faster means of
passenger transport to the Airport Presently it takes 90 minutes on
average to travel from CBD to Airport Stakeholders including KQ, KAA and
KCAA support KR initiative
Legend
Phase 1Phase 2
Project activities: Construct a 6.5 Km branch line from Embakasi
Station Upgrade the track between Nairobi Railway Station
and Embakasi Station Construct new passenger platforms and canopies at
Makadara, Imara Daima and JKIA Construct new car parks at JKIA and Makadara
Stations Construct a new station building at JKIA
Progress made Detailed design of the proposed branch line from
Embakasi Station to the edge of Mombasa Highway completed
Detailed design of stations, platforms and parking areas completed
Inspection of track and rolling stock for intended rehabilitation completed
KR through MoT requested GoK for funding Implementation will begin in June 2010 to be
complete by December 2010
To proceed to implementation a number of issues need to be progressed by NCC: Discourage informal settlements within the
railway reserve; Control of waste disposal within the railway
reserve The Matatu park at Nairobi Railway station
needs to be reorganised for easy flow of traffic;
Expeditious development approvals of plans;