About us
Tau Icesa Group is a consolidated company in construction sector in Barcelona, after a
long time developing the idea, Tau Icesa Group has created PAR S.L., engineering
company specializing in development and production of industrialized constructive
systems, based on precast concrete panels, that can solve the construction of walls
and roofs in a fast way and with higher quality finish than conventional constructive
systems.
PAR takes part in all the phases of the project and the building works:
‐Project
‐Industrialization
‐Production Assembly of structure
‐Construction of the rest of the building
Project
PAR is in communication with the architects to industrialize the project to the highest
point. This is our advantage, all is planed before building works begin, then everything
goes faster. The architects also collaborate with PAR to reach a good esthetical level of
the building.
Industrialization
The PAR engineering department industrializes all the project, beginning by the
foundation up to the end of the building works. Then we achieve:
A project totally defined
Real measurements of all the materíals
Totally closed budget wíth no surprises
Real planning of the duratíon of building works
Minimized risks during building works
Minimize building works waste
Production
The panels are produced in a factory, but depending on the distance between factory
and building, or the number of panels that have to be produced, they can be done in
the same place where building is.
The manufacturing is done following the PAR system and specifications, according the
regulations about structures and concrete. A quality control will be made on all the
production. Main steps of manufacturing are the following:
‐Plank mould control
‐Manufacturing of reinforcing bars
‐Placing the reinforcing bars in the plank mould
‐Dumping of concrete
‐Hardening of concrete
‐Testing of concrete strength
‐Storage and transport
Construction
The construction of the structure is done by PAR, following the project of assembly,
fully defined previously by PAR engíneering department.
The union between prefabricated panels is done using threaded connectíons, the
suppliers of this anchors have their products fully certified.
PAR staff is fully qualified to work in every kind of building or construction work.
MAIN WORKS BUILT WITH OUR SYSTEM:
Nursery at Cornellà de Terri (Girona, Spain):
Projected
Finished work
Changing rooms at "La Torreta" football field (Barcelona, Spain):
Finished work
Changing rooms at "Cunit" football field (Tarragona, Spain):
Finished work
32 Housing Units at Palafolls (Girona, Spain):
Projected
Finished work
Nursery at Tiana (Barcelona, Spain):
Projected
Finished work