1

Click here to load reader

Optimize bim for reducing errors

Embed Size (px)

Citation preview

Page 1: Optimize bim for reducing errors

Optimize BIM for reducing errors, wastage and budget overruns! Architecture Engineering and Construction professionals are garnering or reaping the fruit of optimizing Building Information Modeling for minimizing wastage, errors and budget overruns. Low cost and sustainable BIM solutions are provided by the offshore vendors to clients, which save their time, efforts, resources and money etc. BIM can swiftly make comparison between varieties of design options and enables design and construction professionals in increasing the quality of architectural, structural and MEP design.

There is no dispute on the fact that effective building design has the capacity to reduce errors which can ultimately reduce budget overruns. And the aim of developing accurate as well as productivity oriented building design leads to the execution of Revit modeling services. Execution of these BIM services provide AEC professionals with extremely precise 3D building models for architecture, structure and MEP and these models can disclose enormous information about these individual building disciplines.

BIM models created during early design stage can be used for visualizing project outcomes by reviewing design. Once design is reviewed the design intent of the developed design becomes transparent to owners, architects, engineers and contractors. The design can be modified by architects and engineers after consulting owners and contractors for achieving productive outcomes. When a building is constructed in a virtual environment, AEC professionals can understand the impact of implementing complex procedures during actual construction drawings. By reviewing BIM models they can effectively figure out the consequences of optimizing the kind of workforce they have along with materials and equipments on the project.

Exact material takeoffs, which provide information about the quantities of materials that are required for developing a building, can be used for reducing wastage. Materials cannot be over-ordered by AEC professionals if they have exact material takeoffs with them. On top of that construction schedules can help just-in-time availability of materials and equipments which can reduce the changes of breakage and damage. Use of BIM models during fabrication can also help in the reduction of material wastage.

Apart from this errors can be reduced by executing clash detection, which can eventually have a great impact on the reduction of budget overruns.