Welcome to our Presentation We Think “No Signal, No Traffic Jam at Shahbag" No Signal, No Traffic Jam at Shahbag

No Signal, No Traffic Jam at Shahbag

Embed Size (px)

Citation preview

Page 1: No Signal, No Traffic Jam at Shahbag

Welcome to our Presentation

We Think“No Signal, No Traffic Jam at

Shahbag"No Signal, No Traffic Jam at Shahbag

Page 2: No Signal, No Traffic Jam at Shahbag

Md. Ashraful Alam Saon ID. 104473

No Signal, No Traffic Jam at Shahbag No Signal, No Traffic Jam at Shahbag

Page 3: No Signal, No Traffic Jam at Shahbag

The concern is the traffic jam

No Signal, No Traffic Jam at Shahbag

Page 4: No Signal, No Traffic Jam at Shahbag

Network of the Project

Vehicle from Motsho Bhaban to Science lab

Vehicle from Science lab to Motsho Bhaban

Vehicle from Motsho Bhaban to Farmgate

No Signal, No Traffic Jam at Shahbag

Page 5: No Signal, No Traffic Jam at Shahbag

Network Analysis of the Project

Networks are essentially a technique to aid management in the planning and controlling of projects

Network diagram represents diagrammatically the tasks, or activities, that have to be carried out

No Signal, No Traffic Jam at Shahbag

Page 6: No Signal, No Traffic Jam at Shahbag

Activity Name of activity

A Planning & Designing

B Soil Test

C Demolition

D Pile Driving

E Formworks for Bents & Abutments

F Reforming Steel

G Pouring Concrete

H Making Concrete Deck

I Abutments & Bents in place, Ready to set Beams

J Setting the Concrete Deck

K Asphalt Deck

L Barrier Wall

M Lamppost & Electricity Connection

N Site Cleanup & Finishing

No Signal, No Traffic Jam at Shahbag

Page 7: No Signal, No Traffic Jam at Shahbag

Time Estimation

Optimistic Most likely Pessimistic

Expected Time = (To+4Tm+Tp) /6

No Signal, No Traffic Jam at Shahbag

Page 8: No Signal, No Traffic Jam at Shahbag

Name of Activity, Time Estimation and Expected TimeEvent-Event

Activity Pre requisite Activity

Estimation of Time Expected Time=(To+4Tm+Tp)

/6To Tm Tp

1-2 A 12 18 36 20

1-3 B 17 24 37 25

1-4 C 13 19 31 20

3-5 D A,B 82 112 190 120

4-5 E C 93 118 215 130

5-6 F D,E 68 87 124 90

5-7 G D,E 152 171 244 180

5-8 H D,E 135 152 217 160

7-8 I G 29 34 75 40

8-9 J F,H,I 48 56 88 60

9-10 K J 13 21 53 25

9-11 L J 23 26 53 30

9-12 M J 18 21 48 25

12-13 N K,L,M 18 19 26 20

No Signal, No Traffic Jam at Shahbag

Page 9: No Signal, No Traffic Jam at Shahbag

A20

B

25

C20

D

E

20

F

H

11

G

90

1609

180

K

25

NM

25

60

J

L30

120

I40130

13

10

128

6

5

7

1

2

3

4

No Signal, No Traffic Jam at Shahbag

Page 10: No Signal, No Traffic Jam at Shahbag

Path / Way Day TotalA-D-F-J-K-N 20+120+90+60+25+20 325

A-D-F-J-M-N 20+120+90+60+25+20 325

A-D-F-J-L-N 20+120+90+60+30+20 330

A-D-H-J-K-N 20+120+160+60+25+20 405

A-D-H-J-M-N 20+120+160+60+25+20 405

A-D-H-J-L-N 20+120+160+60+30+20 410

A-D-G-I-J-K-N 20+120+180+40+60+25+20 465

A-D-G-I-J-M-N 20+120+180+40+60+25+20 465

A-D-G-I-J-L-N 20+120+180+40+60+30+20 470

B-D-F-J-K-N 25+20+90+60+25+20 240

B-D-F-J-M-N 25+20+90+60+25+20 240

B-D-F-J-L-N 25+20+90+60+30+20 245

B-D-H-J-K-N 25+20+160+60+25+20 310

B-D-H-J-M-N 25+20+160+60+25+20 310

B-D-H-J-L-N 25+20+160+60+30+20 315

B-D-G-I-J-K-N 25+20+180+40+60+25+20 370

B-D-G-I-J-M-N 25+20+180+40+60+25+20 370

B-D-G-I-J-L-N 25+20+180+40+60+30+20 375

C-E-F-J-K-N 20+130+90+60+25+20 405

C-E-F-J-M-N 20+130+90+60+25+20 405

C-E-F-J-L-N 20+130+90+60+30+20 410

C-E-H-J-K-N 20+130+160+60+25+20 415

C-E-H-J-M-N 20+130+160+60+25+20 415

C-E-H-J-L-N 20+130+160+60+30+20 420

C-E-G-I-J-K-N 20+130+180+40+60+25+20 475

C-E-G-I-J-M-N 20+130+180+40+60+25+20 475

C-E-G-I-J-L-N 20+130+180+40+60+30+20 480

No Signal, No Traffic Jam at Shahbag

Page 11: No Signal, No Traffic Jam at Shahbag

No Signal, No Traffic Jam at Shahbag

Page 12: No Signal, No Traffic Jam at Shahbag

No Signal, No Traffic Jam at Shahbag

Page 13: No Signal, No Traffic Jam at Shahbag

Activity Total Float(LST-EST)

Free Float(TF-Head Slack)

Independent Float(FF-Tail Slack)

A 10-0=10 10-10=0 0-0=0

B 5-0=5 5-5=0 0-0=0

C 0-0=0 0-0=0 0-0=0

D 30-25=5 5-0=5 5-5=0

E 20-20=0 0-0=0 0-0=0

F 280-150=130 130-130=0 0-0=0

G 150-150=0 0-0=0 0-0=0

H 210-150=60 60-0=60 60-0=60

I 330-330=0 0-0=0 0-0=0

J 370-370=0 0-0=0 0-0=0

K 435-430=5 5-5=0 0-0=0

L 430-430=0 0-0=0 0-0=0

M 435-430=5 5-0=5 5-0=5

N 460-460 0-0=0 0-0=0

No Signal, No Traffic Jam at Shahbag

Page 14: No Signal, No Traffic Jam at Shahbag

The Probability of the Critical path being completed within 500 Days

Variance=

Variance for the Critical path (C-E-G-I-J-L-N) = 9+413.44+235.11+58.78+44.44+25+1.78=787.5

No Signal, No Traffic Jam at Shahbag

Page 15: No Signal, No Traffic Jam at Shahbag

Mitan MajumderID.104553

No Signal, No Traffic Jam at Shahbag

Page 16: No Signal, No Traffic Jam at Shahbag

Objectives of Project The main concern of this project is the reduction of

traffic jam at Shahbag, the most important place of Dhaka. The project includes the following mission:

To save the valuable time of economically important person like Engineer, Doctor, Teacher, Businessman.

To minimize the cost for resources like Petrol, Gas etc. To reduce the road accident To save the labor hours of driver & staff of buses To ensure the smooth running of Ambulance To save manpower like traffic police used at Shahbag.

No Signal, No Traffic Jam at Shahbag

Page 17: No Signal, No Traffic Jam at Shahbag

Project Based on PPP

The government is interested in involving private sector in all sectors barring a few for national security reasons. Modern and reliable infrastructure is a must to uplift country’s economy from the current state to a higher growth trajectory

Under the current framework, through different type of PPP initiatives a small number of projects have been implemented under the Annual Development Program (ADP) that is mainly private sector initiatives

No Signal, No Traffic Jam at Shahbag

Page 18: No Signal, No Traffic Jam at Shahbag

Our Agreement with Government

Govt. will provide us administrative help like activity with the different ministry

Our income from the project will be tax free Government will fund for the road repairing We will collect payment for using the

bridge from the public bus for 12 years BRTC & Government High officer will be

payment free for using the bridge

No Signal, No Traffic Jam at Shahbag

Page 19: No Signal, No Traffic Jam at Shahbag

Amiyo Kumar SanaID. 104579

No Signal, No Traffic Jam at Shahbag

Page 20: No Signal, No Traffic Jam at Shahbag

Expenditure of the ProjectPlanning & Designing 1.5

Materials Stone 82.55

Steel 117.25

Cement 135.25

Composites 85.75

Rent of Equipment Bulldozers 42.5

Excavator 27.5

Asphalt Mixers 55.75

Bridge Formworks 12.75

Crane 88.5

Labor Cost Skilled Labor 177.75

Unskilled Labor 225.35

Maintenance cost 38.75

Miscellaneous Cost 33.85

Total Cost 1125No Signal, No Traffic Jam at Shahbag

Page 21: No Signal, No Traffic Jam at Shahbag

Yearly cost of project

Equipment for Project

Bulldozers Excavator Asphalt Mixers Bridge Formworks Crane

Material for Project

Stone Cement Steel Composites

Year Cost0 year 275 Million

1st Year 715Million

2nd Year 125 Million

No Signal, No Traffic Jam at Shahbag

Page 22: No Signal, No Traffic Jam at Shahbag

Income of the Project

Ours cash inflow will come from different buses. We will charge for different amount for different buses. Bus having 40 sit or less will be charged as tk.200 & the bus having more than 40 sit will be charged tk. 250 per day. The private car and other vehicle will be charged for every pass over this bridge. We plan to collect the fee from the office of the bus weekly basis. There will be Toll Plaza at the bridge that may cause jam.

Our positive cash inflow will come from 3 rd year. here we estimate that our cash inflow will increase by 5% from year 4 to 10 based on the previous income and after 10 year it will increase by 3% .

No Signal, No Traffic Jam at Shahbag

Page 23: No Signal, No Traffic Jam at Shahbag

Income up to 12 years

Year Previous Income

Increase @5%; 3%

Cash flow

1 0

2 109.95

3 172.018

4 172.018 8.6009 180.6189

5 180.6189 9.030945 189.6498

6 189.6498 9.482492 199.1323

7 199.1323 9.956617 209.089

8 209.089 10.45445 219.5434

9 219.5434 10.97717 230.5206

10 230.5206 11.52603 242.0466

11 242.0466 7.261398 249.308

12 249.308 7.47924 256.7872

No Signal, No Traffic Jam at Shahbag

Page 24: No Signal, No Traffic Jam at Shahbag

Md. Shahinur IslamID. 104583

No Signal, No Traffic Jam at Shahbag

Page 25: No Signal, No Traffic Jam at Shahbag

Payback Period The length of time required to recover the cost of

an investment. The payback period of a given investment or project is an important determinant of whether to undertake the position or project, as longer payback periods are typically not desirable for investment positions.

Payback Period = Last year with negative NCF + (Absolute value of that year/ Total cash flow in the following year)

No Signal, No Traffic Jam at Shahbag

Page 26: No Signal, No Traffic Jam at Shahbag

Payback Period of Our ProjectYear Previous

Income

Increase Cash flow Cumulative

Cash flow

0 -275 -375

1 -710 -1085

2 -15.05 -1100.05

3 172.018 -928.032

4 172.018 8.6009 180.6189 -747.4131

5 180.6189 9.030945 189.6498 -557.763255

6 189.6498 9.482492 199.1323 -358.6309178

7 199.1323 9.956617 209.089 -149.5419636

8 209.089 10.45445 219.5434 70.00143818

9 219.5434 10.97717 230.5206 300.5220101

10 230.5206 11.52603 242.0466 542.5686106

11 242.0466 7.261398 249.308 791.8766091

12 249.308 7.47924 256.7872 1048.663848

No Signal, No Traffic Jam at Shahbag

Page 27: No Signal, No Traffic Jam at Shahbag

Payback Period = 7+ (149.5419636/ 219.5434)

= 7.68 Years The better investment is the one with

the shorter payback period, as our project life time is 12 year and the payback period is 7.68 years it can be accepted.

No Signal, No Traffic Jam at Shahbag

Page 28: No Signal, No Traffic Jam at Shahbag

Discounted Payback Period

The discounted payback period is the amount of time that it takes to cover the cost of a project, by adding positive discounted cash flow coming from the profits of the project. The advantage of using the discounted payback period over the payback period is that it takes into account time value of money

Discount Rate/ Cost of Capital:

Our total investment will be 1125 million and we have two sources to collect the fund. But the cost of fund differs from one another so to calculate the discount rate/ cost of capital we use the formula for weighted average cost of capital

Bank Loan Proposal for 20 years @ 11.75% 890.85 Million

Owner Fund @15% 234.15 Million

No Signal, No Traffic Jam at Shahbag

Page 29: No Signal, No Traffic Jam at Shahbag

As there will be agreement with government that no Tax will be imposed in our income for this project so we do not adjust the cost of bank loan with Income Tax.

The weight for bank loan = 890.85/ 1125 = 0.79

The weight for owner fund = 234.15/ 1125 = 0.21

Discount Rate = 0.79*0.1175 + 0.21*0.15

= 0.12 = 12%

No Signal, No Traffic Jam at Shahbag

Page 30: No Signal, No Traffic Jam at Shahbag

Year Previous

Income

Yearly

Increase@5%

Cash flow Factor@ 12% Discounted

Cash Flow

Cumulative.

Cash flow

0 -275 1 -275 -275

1 -715 0.893 -638.495 -913.495

2 -15.05 0.797 -11.99485 -925.48985

3 172.018 0.712 122.476816 -803.013034

4 172.018 8.6009 180.6189 0.636 114.8736204 -688.1394136

5 180.6189 9.030945 189.6498 0.568 107.721112 -580.4183016

6 189.6498 9.482492 199.1323 0.507 100.960095 -479.4582067

7 199.1323 9.956617 209.089 0.452 94.50820726 -384.9499994

8 209.089 10.45445 219.5434 0.404 88.69553433 -296.2544651

9 219.5434 10.97717 230.5206 0.361 83.21792646 -213.0365386

10 230.5206 11.52603 242.0466 0.322 77.93900536 -135.0975332

11 242.0466 7.261398 249.308 0.288 71.80070357 -63.29682967

12 249.308 7.47924 256.7872 0.257 65.99432029 2.697490623

No Signal, No Traffic Jam at Shahbag

Page 31: No Signal, No Traffic Jam at Shahbag

Discounted Payback Period

= 11+ (63.29682967/ 65.99432029)

= 11.95 Years

It is so much risky to accept the project because it needs all most 12 year to recover the invested money that is ours project life time. But because of the social benefit we can take risk to accept the project.

No Signal, No Traffic Jam at Shahbag

Page 32: No Signal, No Traffic Jam at Shahbag

Md. Zahidul IslamID. 104465

No Signal, No Traffic Jam at Shahbag

Page 33: No Signal, No Traffic Jam at Shahbag

Net Present Value The difference between the present value of cash

inflows and the present value of cash outflows

A positive net present value indicates that the projected earnings generated by a project or investment (in present Taka) exceed the anticipated costs (also in present Taka). Generally, an investment with a positive NPV will be a profitable one and one with a negative NPV will result in a net loss. This concept is the basis for the Net Present Value Rule, which dictates that the only investments that should be made are those with positive NPV values

Accepted: NPV> Zero Rejected: NPV< Zero

No Signal, No Traffic Jam at Shahbag

Page 34: No Signal, No Traffic Jam at Shahbag

Year Previous

Income

Yearly

Increase@ 5%

Cash flow Factor@ 12% Present Value

0 -275 1 -275

1 -715 0.893 -638.495

2 -15.05 0.797 -11.99485

3 172.018 0.712 122.476816

4 172.018 8.6009 180.6189 0.636 114.8736204

5 180.6189 9.030945 189.6498 0.568 107.721112

6 189.6498 9.482492 199.1323 0.507 100.960095

7 199.1323 9.956617 209.089 0.452 94.50820726

8 209.089 10.45445 219.5434 0.404 88.69553433

9 219.5434 10.97717 230.5206 0.361 83.21792646

10 230.5206 11.52603 242.0466 0.322 77.93900536

11 242.0466 7.261398 249.308 0.288 71.80070357

12 249.308 7.47924 256.7872 0.257 65.99432029

Net Present Value 2.697490623

No Signal, No Traffic Jam at Shahbag

Page 35: No Signal, No Traffic Jam at Shahbag

Internal Rate of Return The internal rate of return on an investment or project is the

"annualized effective compounded return rate" or rate of return that makes the net present value of all cash flows (both positive and negative) from a particular investment equal to zero.

IRR formula is as follows

IRR= A+ (B-A)

A= Lower discount rate

B = Higher discount rate

C = NPV @ Lower discount rate

D = Difference between NPV @ Lower discount rate and NPV @ Higher discount rate

 

C

D

No Signal, No Traffic Jam at Shahbag

Page 36: No Signal, No Traffic Jam at Shahbag

Year Previous

Income

Increase

@5%

Cash flow Factor@

12%

Present

Value

Factor

@20%

Present

value

0 -275 1 -275 1 -275

1 -715 0.893 -638.495 0.833 -595.595

2 -15.05 0.797 -11.99485 0.694 -10.4447

3 172.018 0.712 122.476816 0.578 99.426404

4 172.018 8.6009 180.6189 0.636 114.8736204 0.482 87.0583098

5 180.6189 9.030945 189.6498 0.568 107.721112 0.402 76.23923769

6 189.6498 9.482492 199.1323 0.507 100.960095 0.335 66.70933298

7 199.1323 9.956617 209.089 0.452 94.50820726 0.279 58.3358182

8 209.089 10.45445 219.5434 0.404 88.69553433 0.232 50.93406922

9 219.5434 10.97717 230.5206 0.361 83.21792646 0.194 44.72099095

10 230.5206 11.52603 242.0466 0.322 77.93900536 0.161 38.96950268

11 242.0466 7.261398 249.308 0.288 71.80070357 0.135 33.6565798

12 249.308 7.47924 256.7872 0.257 65.99432029 0.112 28.76017071

Net Present Value 2.697490623 -296.229284

No Signal, No Traffic Jam at Shahbag

Page 37: No Signal, No Traffic Jam at Shahbag

If the IRR is greater than the cost of capital, accept the projects.If the IRR is less than the cost of capital, reject the projects.

As the IRR 12.07% is greater than cost of capital 12% we can accept the project

No Signal, No Traffic Jam at Shahbag

Page 38: No Signal, No Traffic Jam at Shahbag

Md. Ismail HosenID. 091099

No Signal, No Traffic Jam at Shahbag

Page 39: No Signal, No Traffic Jam at Shahbag

Decision Tree A decision tree is a decision support tool

that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility.

we are in problem that we have three alternatives ways:

Purchase the equipments Rent equipments internally (from Country) Rent equipments externally (From Aboard)

No Signal, No Traffic Jam at Shahbag

Page 40: No Signal, No Traffic Jam at Shahbag

The possible states of economy and the associated probability distribution are as follows

State Probability

Favorable 0.60

Unfavorable 0.40

The cost for equipments and each state of economy are as follows:

Alternatives State of economy

Favorable Unfavorable

Purchase Equipments (A) 425 Million 515 Million

Rent Internally (B) 215 Million 245 Million

Rent from Aboard (C) 270 Million 310 Million

No Signal, No Traffic Jam at Shahbag

Page 41: No Signal, No Traffic Jam at Shahbag

Decision Tree

No Signal, No Traffic Jam at Shahbag

Page 42: No Signal, No Traffic Jam at Shahbag

Using the decision tree approach we determine the expected cost for each alternatives and we would take the decision from the alternatives by using the expected monetary value criterion.

EMA (A) = (425*0.6) + (515*0.4) =461EMA (B) = (215*0.6) + (245*0.4) =227EMA (C) = (270*0.6) + (310*0.4) =286

Thus based on the expected monetary value criterion Alternative B (Equipments rent from internal sources) is the best as the cost 227 million which is less than other alternatives.

No Signal, No Traffic Jam at Shahbag

Page 43: No Signal, No Traffic Jam at Shahbag

Meherajul Hasan Chy.ID. 104425

No Signal, No Traffic Jam at Shahbag

Page 44: No Signal, No Traffic Jam at Shahbag

Risk analysis 

Risk analysis is a technique used to identify and assess factors that may jeopardize the success of a project or achieving a goal.

Project risk analysis is the identification and quantification of the likelihood and impact of events that may damage the project

Risk analysis improves the accuracy of traditional scheduling, cost estimation, spreadsheet financial models, and systems engineering skills

No Signal, No Traffic Jam at Shahbag

Page 45: No Signal, No Traffic Jam at Shahbag

Expected Value Expected value is one of the fundamental concepts in

probability, in a sense more general than probability itself. The expected value of a real-valued random variable gives a measure of the center of the distribution of the variable.

Expected Value of our Project

Economic Condition

Net Cash Benefit (Xi)

Probability (Pi) Expected Value

Strike & Man made Distress

110.613 0.06 6.63678

Normal 172.018 0.87 149.65566

Great Prosperity (Ramadan)

193.507 0.07 13.54549

Expected Value E(x) 169.83793

No Signal, No Traffic Jam at Shahbag

Page 46: No Signal, No Traffic Jam at Shahbag

Standard Deviation Standard Deviation is a measure of the dispersion of a

set of data from its mean. The more spread apart the data, the higher the deviation. Standard deviation is calculated as the square root of variance.

No Signal, No Traffic Jam at Shahbag

Page 47: No Signal, No Traffic Jam at Shahbag

No Signal, No Traffic Jam at Shahbag

Page 48: No Signal, No Traffic Jam at Shahbag

Coefficient of Variance

A statistical measure of the dispersion of data points in a data series around the mean.

In the investing world, the coefficient of variation allows you to determine how much volatility (risk) you are assuming in comparison to the amount of return you can expect from your investment.

No Signal, No Traffic Jam at Shahbag

Page 49: No Signal, No Traffic Jam at Shahbag

No Signal, No Traffic Jam at Shahbag

Page 50: No Signal, No Traffic Jam at Shahbag

Shahnaz Akter ID. 104407

No Signal, No Traffic Jam at Shahbag

Page 51: No Signal, No Traffic Jam at Shahbag

Social Cost Benefit Analysis of the project

Social cost benefit analysis (referred to as SCBA), also called economic analysis, and is a methodology developed for evaluating investment projects from the point of view of the society (or economy) as a whole. In SCBA the focus is on the social costs and benefits of the projects. These often tend to differ from the monetary cost and benefits of the project.

The SCBA takes into account the indirect costs and indirect benefits to the nation. While a nation bears the indirect costs, the people of the nation enjoy the indirect benefits.

No Signal, No Traffic Jam at Shahbag

Page 52: No Signal, No Traffic Jam at Shahbag

Shadow price

The shadow price takes care of the distortions in the market price by suitably adjusting the market price

Shadow price is a proxy value of good, often defined by what an individual must give up to gain an extra unit of good. Shadow price represent the economic value of a project.

No Signal, No Traffic Jam at Shahbag

Page 53: No Signal, No Traffic Jam at Shahbag

Rules associated with shadow price:

For tradable goods: shadow price is calculated on the border price or by exchange rate between countries.

For non-tradable goods: shadow price is calculated in two different ways.

Consumer willingness to pay

Additional production.

No Signal, No Traffic Jam at Shahbag

Page 54: No Signal, No Traffic Jam at Shahbag

Cost for Project The project costing tk. 1125 million if the project is done with the

help of a foreign company it will cost tk.1423 million. 30000 tons of cements produce indigenously are used in the

project at a cost tk. 4500 per tons. However half of the cement will come from additional production which cost tk. 4200 per tons and half come from derivation from other consumer who is willing to pay tk. 6500 per tons.

Other construction materials (Stone, steel etc.) cost tk. 285.55 million. These materials come from additional production which cost of tk. 278.25million.

Labors that are unskilled will work for the project for which project committee decide to pay 225.35 totally; the shadow price of unskilled labor should be 217.85 Million.

Skilled labor cost tk. 177.75 million in total. These costs reflect what are willingly to pay for the skilled labor.

Operating maintenance cost will be tk. 3.23 million annually. Operating cost should be tk. 2.95 million from social point of view.

No Signal, No Traffic Jam at Shahbag

Page 55: No Signal, No Traffic Jam at Shahbag

Benefit from the Project

After the bridge is constructed 157 million people will pass the bridge annually. It will save at least 1 hour for the people. The cost per hour is tk. 115.

There will be a save in valuable resources like diesel, petrol etc. Every day it will save at least 350 liter resource and per liter cost of resource is tk. 70.

No Signal, No Traffic Jam at Shahbag

Page 56: No Signal, No Traffic Jam at Shahbag

Costs: Benefits:

Costs types Market

price

Shadow

price( Social

Value)

Project cost

Cost of cement

Wages (unskilled labor)

Wages (skilled labor)

Maintenance costs

1125

135.25

225.35

177.75

3.23

1423

160.5

217.85

177.75

2.95

Benefits Shadow

price( Social

Value)

Savings in labor hour

cost

Savings in resources

18.055

8.82

No Signal, No Traffic Jam at Shahbag

Amount in Million

Page 57: No Signal, No Traffic Jam at Shahbag

Thank You