28
LHD - load haulage damp Bucket size : from 0,5 to 8,4 m 3 Optimal tramming distance : 150 - 400 m Yield : 300 - 800 t/shift

Lhd

Embed Size (px)

Citation preview

Page 1: Lhd

LHD - load haulage damp

Bucket size : from 0,5 to 8,4 m3

Optimal tramming distance : 150 - 400 mYield : 300 - 800 t/shift

Page 2: Lhd

Mucking by LHD

Page 3: Lhd

Loading by Slusher

Bucket size : from 0,22 to 0,8 m3

Optimal tramming distance : 20 - 50 mYield : 30 - 100 t/shift

Page 4: Lhd

Mucking by Slusher

Bucket size : from 0,22 to 0,8 m3

Optimal tramming distance : 20 - 50 mYield : 30 - 100 t/shift

Page 5: Lhd

Mucking and loading by overhead loader

Bucket size : from 0,125 to 1 m3

Container size : 1 to 5 m3

Optimal tramming distance : 5 - 20 mTechnical Yield : 20 - 60 t/hour

Page 6: Lhd

Mucking and loading by vibrating feeder

Technical Yield : 20 - 60 t/hourMinimal ore reserve : 100 000 t

Page 7: Lhd

Haulage by track

Capacity : from 6 to 60 t ; Tramming distance : 500 à 1000 m

Page 8: Lhd

Track loading

Loading by vibrating feeder

Loading by LHD

Loading by hydraulic shovel

Page 9: Lhd

Haulage by train

Page 10: Lhd

Haulage by train

Locomotive 18 tonnes, wagons of 7.5 m3 , Kiruna : 500 t by train

Page 11: Lhd

Wagon loading

Loading by vibrating feeder

Loading by LHD

Loading by overhead loader

Page 12: Lhd

Conveyer belt transport

Page 13: Lhd

Scaling Machine

Page 14: Lhd

Bolting

Page 15: Lhd

Bolt installation

mechanized manual

Page 16: Lhd

Cost of loading

ton/$,P

CC

average

hour

load

where : Cload - operating cost of loading in $ per tonne of rock ;Chour - hourly operating cost of the equipment in $ per hour ;Paverage - average production rate of the equipment in tonnes per hour.

Page 17: Lhd

Production rate of loading

hr/t,jtimecycle

cyclepertonsP

where : Q - bucket size, m3 ; - ore density, t/ m3 ;ffill - bucket filling factor ;fswelling=1.1 to 1.5 - swelling factor ;D - one way tramming distance in meters ;v - average speed over the cycle in kilometers per hour ;tfix - fixed cycle time (load, damp, maneuver) in minutes ;j = 50 min - operating minutes per hour to account for delays in

minutes;

cycle/t,f

fQcyclepertons

swelling

fill

min,t1000

60

v

D2timecycle

fix

Page 18: Lhd

Production rate of loading

LHD : 0,5 to 8,4 m3

Q - bucket size

Slusher : 0,22 to 0,8 m3

Overhead loader (CAVO) : bucket 0,125 to 1 m3

container 1 to 5 m3

Page 19: Lhd

ffill - bucket filling factor

Coarse blocs : ffill = 0,8 - 1,1

Moist material : ffill = 0,55 - 0,7

Fine material < 50 mm : ffill = 0,55 - 0,75

LHD

SlusherGros blocs de minerai : ffill = 0,5 - 0,7

Minerai fine < 50 mm : ffill = 0,8 - 1

Production rate of loading

Page 20: Lhd

v - average speed over the cycle

Favorable conditions : v = 9 à 16 km/h

Average conditions : v = 8 à 12 km/h

Unfavorable conditions : v = 5 à 8 km/h

Diesel-driven LHD

Slusher v = 4.5 to 5.5 km/h

Favorable conditions : v = 9.5 km/h

Average conditions : v = 6.5 km/h

Unfavorable conditions : v = 3.2 km/h

Electric-driven LHD

Production rate of loading

Page 21: Lhd

tfix - fixed cycle time (loading, dumping, maneuver)

Favorable conditions : tfix = 0.8 min

Average conditions : tfix = 1.1 min

Unfavorable conditions : tfix = 1.4 min

LHD

Slusher tfix = 0.5 min

Production rate of loading

Page 22: Lhd

Distance variable

Dmax

Dmin

Distance

Production

Dmin Dmax

R = f(D)

h/t,DD

dD)D(RP

minmaxaverage

Page 23: Lhd

Average production rate of loading

hr/t,tD

60

1000v

2

tD

60

1000v

2

DD

60

1000

2

vQ

f

fj

P

fixmin

fixmax

minmax

swelling

fill

averageLn

where : Q - bucket size, m3 ; - ore density, t/ m3 ;ffill - bucket filling factor ;fswelling= 1.1 to 1.5 - rock swelling factor ;Dmin - minimum one way tramming distance in meters ;Dmax - maximum one way tramming distance in meters ;v - average speed over the cycle in kilometers per hour ;tfix - fixed cycle time (load, damp, maneuver) in minutes ;j = 50 min - operating minutes per hour to account for delays in

minutes;

Page 24: Lhd

Influence of distance on production

0

100

200

300

400

500

600

0 50 100 150 200 250 300 350 400 450 500

Distance, m

Pro

du

ctio

n o

f L

HD

- 8

.4 m

3 , t/h

0

10

20

30

40

50

60

70

80

Pro

du

ctio

n o

f L

HD

- 0

.76

m3

and

of

slu

sher

, t/h

LHD - 8,4 m3 Slusher - 0,38 m3 LHD - 0,76 m3

Page 25: Lhd

Variable distance

0

5

10

15

20

25

30

35

40

0 50 100 150 200 250 300 350 400 450 500

Distance, m

Pro

du

ctio

n, t

/h

LHD - 0,76 m3 variable distance LHD - 0,76 m3 average distance

Page 26: Lhd

Cost estimation

Capital cost

Hourly operating cost

Operator labor

Parts

Maintenance labor

Diesel fuel

Electric power

Lube oil

Tires

Compressed air

Page 27: Lhd

Hourly operating cost

Bucket size Parts Labor Diesel fuel Lube Tires Total

m3 $/h $/h $/h $/h $/h $/h

0,38 3,19 2,8 0,82 0,55 0,94 8,30,76 4,17 3,65 1,07 0,71 1,35 10,951,15 4,9 4,29 1,07 0,83 1,39 12,481,53 5,19 4,55 1,6 0,9 1,91 14,152,68 7,79 6,82 2,72 1,37 4,35 23,054,59 10,5 9,19 3,61 1,85 3,55 28,75,35 13,53 11,85 4,51 2,38 4,67 36,946,50 15,74 13,78 5,41 2,77 4,67 42,379,94 19,12 16,74 7,33 3,41 7,91 54,51

Page 28: Lhd

Capital cost

Bucket size Overall width

Overall Height

Price Hourly operating cost

m3 m m $ $/h

0,38 0,8636 1,8288 87970 8,30,76 1,2192 1,8288 114810 10,951,15 1,27 1,8542 135090 12,481,53 1,5494 1,9812 151690 14,152,68 1,9812 1,7272 214530 23,054,59 2,6162 1,9812 289240 28,75,35 372830 36,946,50 2,4892 2,5908 433760 42,379,94 3,048 2,54 526860 54,51