Page 2: Lean thinking and methods

Kaizen, Japanese for "improvement" or "change for the best", often is considered to be the "building block" of all lean production methods. Kaizen focuses on eliminating waste, improving productivity, and achieving sustained continual improvement in targeted activities and processes of an organization.

Lean production is founded on the idea of kaizen – or continual improvement. This philosophy implies that small, incremental changes routinely applied and sustained over a long period result in significant improvements.

Kaizen

Page 3: Lean thinking and methods

“The 5 whys” analytical technique is used to identify how quickly you can eliminate waste in a targeted process or production area.

Repeating "Why" Five Times: Why did the machine stop?

There was an overload, and the fuse blew. Why was there an overload?

The bearing was not sufficiently lubricated. Why was it not lubricated sufficiently?

The lubrication pump was not pumping sufficiently. Why was it not pumping sufficiently?

The shaft of the pump was worn and rattling. Why was the shaft worn out?

There was no strainer attached, and metal scrap got in.

5 Whys

Page 4: Lean thinking and methods

Kaizen can be a powerful tool for uncovering hidden wastes or waste-generating activities and eliminating them.

Kaizen focuses on waste elimination activities that optimize existing processes and that can be accomplished quickly without significant capital investment. This creates a higher likelihood of quick, sustained results.

Kaizen Benefits

Page 5: Lean thinking and methods

5S is a system to reduce waste and optimize productivity through maintaining an orderly workplace and using visual cues to achieve more consistent operational results.

A typical 5S implementation would result in significant reductions in the square footage of space needed for existing operations.

It also would result in the organization of tools and materials into labeled and color coded storage locations, as well as "kits" that contain just what is needed to perform a task.

5S

Page 6: Lean thinking and methods

5S Implementation Approach5S is a cyclical methodology: sort, set in order, shine, standardize,

sustain the cycle. This results in continuous improvement.

Page 7: Lean thinking and methods

Sort - the first S, focuses on eliminating unnecessary items from the workplace that are not needed for current production operations. An effective visual method to identify these unneeded items is called "red tagging”. A red tag is placed on all items that are not important for operations or that are not in the proper location or quantity.

Set In Order focuses on creating efficient and effective storage methods to arrange items so that they are easy to use and to label them so that they are easy to find and put away.

Shine - once the waste is eliminated and remaining items are organized, the next step is to thoroughly clean the work area.

Standardize – is the method to maintain the first three pillars, creates a consistent approach with which tasks and procedures are done.

Sustain – is often the most difficult S to implement and achieve, because of the tendency to return to the status quo and the comfort zone of the "old way" of doing things. Tools for sustaining 5S include signs and posters, newsletters, pocket manuals, team and management check-ins, performance reviews, etc. 

The 5S Pillars

Page 8: Lean thinking and methods

KanbanKanban (かんばん (看板 ) (literally signboard or billboard) is a scheduling system for lean and just-in-time (JIT) production. Kanban is a system to control the logistical chain from a production point of view, and is not an inventory control system. Kanban was developed at Toyota to find a system to improve and maintain a high level of production.

Page 9: Lean thinking and methods

Kanban often referred to as the "nervous system" of lean production, it determines a processes production quantities, and in doing so, facilitates JIT production and ordering systems.

Kanban is a card, labeled container, computer order, or other device used to signal that more products or parts are needed from the previous process step. Kanban are used to control work-in-progress (WIP), production, and inventory flow.

Kanban serves to ultimately eliminate overproduction, a key form of manufacturing waste.

Kanban Description

Page 10: Lean thinking and methods

Kanban systems reduce the amount of necessary in-process and post-process inventory, thereby reducing the potential for products to be damaged during handling and storage.

Typically Kanban requires less floor space for equal levels of production. Hence, reduce in energy use for heating, air conditioning, and lighting.

Kanban systems also help facilitate worker-lead process improvements, as workers are more motivated to make product improvements when there is no excess inventory remaining to be sold.

KANBAN Benefits

Page 11: Lean thinking and methods

Six Sigma

Page 12: Lean thinking and methods

Six Sigma consists of a set of statistical methods for systemically analyzing processes to reduce process variation, which are sometimes used to support and guide supply chain continual improvement activities.

Six Sigma was developed by Motorola in the 1990s, drawing on well-established statistical quality control techniques and data analysis methods.

The term sigma is a Greek alphabet letter (σ) used to describe variability. A sigma quality level serves as an indicator of how often defects are likely to occur in processes, parts, or products. A Six Sigma quality level equates to approximately 3.4 defects per million opportunities, representing high quality and minimal process variability.

δ 6 Sigma Intro δ

Page 13: Lean thinking and methods

A sequence of steps called the Six Sigma DMAIC (Define, Measure, Analyze, Improve, and Control) is typically used to guide implementation of Six Sigma statistical tools and to identify process wastes and weaknesses.

Define. This phase focuses on defining the project improvement activity goals and identifying the issues that need to be addressed to achieve a higher sigma level.

Measure. In this phase, the aim is to gather information about the targeted process.

Analyze. This phase is concerned with identifying the root cause(s) of quality problems, and confirming those causes using appropriate statistical tools.

Improve – implementation phase of creative solutions - ways to do things better, cheaper, and/or faster - that address the problems identified during the analysis phase takes place.

Control. This phase involves integration of the improved system by modifying policies, procedures, and other management systems. Process performance results are again periodically monitored to ensure productivity improvements are sustained.

Implementation Approach

Page 14: Lean thinking and methods

A reduction in defects can help eliminate waste from processes in three fundamental ways: fewer defects decreases the number of products that must be

scrapped; fewer defects also means that the raw materials, energy, and

resulting waste associated with the scrap are eliminated; fewer defects decreases the amount of energy, raw material,

and wastes that are used or generated to fix defective products that can be re-worked.

Six Sigma techniques that focus on product durability and reliability can increase the lifespan of products. This can reduce the frequency with which the product will need to be replaced, reducing the overall environmental impacts associated with meeting the customer need.

Six Sigma Benefits

Page 15: Lean thinking and methods

Lean experts typically view 3P as one of the most powerful and transformative advanced manufacturing tools, and it is typically only used by organizations that have experience implementing other lean methods.

Whereas kaizen and other lean methods take a production process as a given and seek to make improvements, the Production Preparation Process (3P) focuses on eliminating waste through product and process design.

3P: Production Preparation Process

Page 16: Lean thinking and methods

The project team spends usually several days working to develop multiple alternatives for each process step and evaluating each alternative against manufacturing criteria and a preferred cost. The goal is typically to develop a process or product design that meets customer requirements best in the "least waste way". The typical steps in a 3P are: Define Product or Process Design Objectives/Needs: The team seeks to

understand the core customer needs that need to be met. If a product or product prototype is available, the project team breaks it down into component parts and raw materials to assess the function that each plays.

Diagraming: A fishbone diagram or other type of illustration is created to demonstrate the flow from raw material to finish product. 

Find and Analyze Examples in Nature: The project team then tries to find examples of each process keyword.

Build, Present, and Select Process Prototypes: The team prototypes and then evaluates the chosen process, spending several days (if necessary) working with different variations of the mock-up to ensure it will meet criteria.

Hold Design Review: Once a concept has been selected for additional refinement, it is presented to a larger group (including the original product designers) for feedback.

Develop Project Implementation plan: If the project is selected to proceed, the team selects a project implementation leader who helps determine the schedule, process, resource requirements, and distribution of responsibilities for completion.

Method and Implementation Approach