2. QUALITY
Conveyabull trucks place material up to 115. There is no need for
equipment driving over the pond liner which may puncture and damage
it.
Material is distributed evenly across the liner no matter how steep
the slopes are.
3. 4. SAVES TIME
Conveyabull trucks can place up to830 cubic yards per day! Material
on-site can be loaded continuously into a Conveyabull truck as it
is spreading.
Traditional methods such as: a crane and bucket, an excavator/skid
steer OR A LOW GROUND PRESSURE DOZER may take days to place what
Conveyabull can in hours.
Conveyabulls production rate can have the contractor way ahead of
schedule, resulting in rapid project completion and greater
customer satisfaction.
5. 6. COST
Conveyabulls inexpensive rate, coupled with higher production
results in a decreased cost per cubic yard placed.
Competitive base price of $90 per hour and $1.33/mile for
mobilization. Job specific proposals/prices can be furnished at
your request. Prices/proposals can be provided at a unit cost basis
or total job cost basis.
Conveyabull trucks aerate sandy, silty and organic materials as
they are conveyed in place. This process results in less bank
volume required to install the projected liner cover volume.
7. 8. BUDGET
Conveyabull customers enjoy the benefit of even material
distribution because it consumes the projected volume of
material.
In several cases, a customer will request for a decreased depth of
material installed. If there is room in the budget after that layer
is installed, then it is covered with additional or remaining
material.
9. Experience
Conveyabull has an extensive commercial resume encompassing a large
range of private, civic, state and DOT projects across Montana,
Wyoming and Idaho.
10. WHY PAY FOR EXCESSIVE EQUIPMENT, LABOR & WASTED MATERIAL