Page:1 www.wison.com | www.wison-offshore.com The Emergence of Mid-Scale Barge Based LNG Plants Wison Offshore & Marine November 2013

Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Embed Size (px)

DESCRIPTION

Kris Martinick, LNG Project Development Manager, Wison Offshore & Marine delivered this presentation at the 2013 FLNG Forum in Perth. The two day conference brings attendees key insights into the technology and concepts that will unlock Australia’s stranded gas reserves. This event brings together case studies, keynote and technical presentations from the experts at the forefront of the Floating LNG projects. For more information about the forum, please visit the event website: http://www.informa.com.au/flngforum2013

Citation preview

Page 1: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:1 www.wison.com | www.wison-offshore.com

The Emergence of Mid-Scale

Barge Based LNG Plants

Wison Offshore & Marine

November 2013

Page 2: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:2 www.wison.com | www.wison-offshore.com

Introduction to the Wison Group

Page 3: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:3 www.wison.com | www.wison-offshore.com

Founded November 1997

Presently China’s largest private

chemical engineering company

A provider of engineering, project

management, and construction

management services

11 Member Companies across 4

sectors

Wison Engineering Limited was

listed on the Hong Kong stock

exchange in December 2012

The Wison Group

Page 4: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:4 www.wison.com | www.wison-offshore.com

Business Segments Focusing on the Energy Industry and Hi-tech Sectors

Using coal as feed

stock, Wison Energy

provides high quality

industrial gases via

clean coal technology.

Wison Group

Specializing in

petrochemicals, coal

chemicals and refining

industries

Development of

emerging chemical and

LNG related businesses.

A word-class EPC

Contactor focused

providing solutions on

international oil and gas

EPC Projects.

Clean Energy Emerging Business Offshore & Marine Engineering Services

The Wison Group employs approximately 3,000 people worldwide

Page 5: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:5 www.wison.com | www.wison-offshore.com

Caribbean FLNG Project – Setting

the stage for small-medium scale

FLNG

Page 6: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:6 www.wison.com | www.wison-offshore.com

Caribbean FLNG Project Background Pacific Rubiales Energy (PRE) via its

subsidiary Pacific Stratus Energy Colombia

Corp. (PSE), signed a natural gas/ LNG

Liquefaction, Regasification, Storage and

Loading Services Agreement with Belgium

based EXMAR NV:

− EXMAR will build, operate and maintain a Floating

Liquefaction Regasification & Storage Unit (FLRSU)

to be located on the Colombian Caribbean coast.

− PSE will have exclusive rights to supply and liquefy

up to 0.5 mmtpa of LNG over a 15 year period,

under a tolling structure.

The source of the gas is PSE’s

La Creciente Field.

PSE will build an 18 inch

pipeline to transport gas from

the field to the coast (88 Km).

Page 7: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:7 www.wison.com | www.wison-offshore.com

The FLRSU Solution

Selected FLRSU solution

is a non-propelled barge

moored to an offshore jetty.

FLRSU is to be located 4

Km offshore in 14 m water

depth.

FLSRU storage and

process requirements are:

- Storage - 16,000 m3

- Liquefaction - 0.5mtpa

- Regasification - 400mmscfd

Alongside FLRSU is

170,000 m3 LNG Floating

Storage Unit (FSU).

Regasification option:

65% of Colombia’s electricity comes from hydropower.

In some years (la Nina) water shortages may require importing LNG to

generate power to maintain supply.

Page 8: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:8 www.wison.com | www.wison-offshore.com

Wison is the primary EPCIC

contractor to EXMAR for the

barge-based FLRSU.

Wison’s Scope:

− FLRSU Project

Management, Engineering,

Procurement, Construction,

Commissioning,

Transportation, Installation

and Start-up of the Facility.

Major subcontractors :

- Black & Veatch: Topside

LNG Equipment Design,

Procurement &

Commissioning

- TGE: Cargo Tanks & Cargo

Handling Systems

Caribbean FLNG Project Details and Scope

Page 9: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:9 www.wison.com | www.wison-offshore.com

FLNG Block Flow

BLOCK FLOW DIAGRAM

FEED GAS

CO2

VENT H2O

FUEL

LNG

CONDENSATE

LPG

INLET RECEPTION

LIQUID SEPARATOR

TREATING DEHYDRATION/Hg REMOVAL

LIQUEFACTION

LNG FLASH/ FUEL

COMPRESSOR

LPG/ CONDENSATE

FRACTIONATION LNG STORAGE

POWER GENERATION

(OPTION)

FLARES WARM FLARE

CRYOGENIC FLARE

WATER TREATING/

DISTRIBUTION FIRE UTILITY

POTABLE

NITROGEN

CONSUMABLES STORAGE LUBE OILS

CHEMICALS MISC.

EMERGENCY POWER

EFFLUENT TREATING

HOT OIL OR

STEAM PLANT AIR

INSTRUMENT AIR

REFRIGERANT MAKEUP/ STORAGE

Page 10: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:10 www.wison.com | www.wison-offshore.com

PRICO® SMR Liquefaction Technology

Black & Veatch’s patented PRICO®

Single Mixed Refrigerant technology

is the simplest form of mixed

refrigerant cycle.

B&V has considerable experience in

the field:

- 27 global LNG plants in operation

- 11 plants under construction

Process is scalable over wide

capacity range but core process

remains the same.

Compact layout with modular

philosophy lends itself to use

offshore.

Simplicity of process results in

relatively low cost.

Simplified operations lead to quick

startup.

Page 11: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:11 www.wison.com | www.wison-offshore.com

Gas Handling and Transfer System

TGE to provide 3 x 5,367 m3 LNG tanks

giving a total of 16,100 m3 capacity.

Tanks are robust IMO Type C, no sloshing

and no secondary barrier, strong against inner

and outer pressure with safe and simple

control. Tanks are designed for easy

operation and maintenance.

TGE has more than 25 years experience in

the field and more than 100 gas carrier

contracts.

Stand-alone tank design selected to minimize

overall project schedule – tanks may be

fabricated in parallel and lifted into FLRSU

hull at shipyard.

TGE also to supply cargo transfer system,

and associated gas safety systems, electrical

equipment and instrumentation, and auxiliary

systems.

Page 12: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:12 www.wison.com | www.wison-offshore.com

FLRSU GA Drawing – Plan View

View shows locations of 3 LNG Storage Tanks inside hull

Page 13: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:13 www.wison.com | www.wison-offshore.com

FLSRU Mooring Arrangement

Bracket &

Fender

Elements

FLRSU is moored to four guide piles

using a bracket system that allow

vertical motion (heave) of barge hull

only.

FSU is (conventionally) moored to

mooring piles on offshore jetty.

Page 14: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:14 www.wison.com | www.wison-offshore.com

LNG Loading/Offloading

Pipeline gas will enter FLRSU via

(conventional) export hoses between

FLRSU and jetty.

LNG will be offloaded from FLRSU to

FSU via midship manifolds using

EXMAR’s STS (ship-to-ship) transfer

system.

System is well-proven with more than

400 transfers already recorded.

Product Flow – LNG Export

Page 15: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:15 www.wison.com | www.wison-offshore.com

Project Schedule – Key Milestones

MILESTONE DATE

Project Start Date April 2012

FLRSU Strike Steel December 2012

FLSRU Keel Laying Start July 2013

Topside Construction Start October 2013

FLRSU Equipment Installation Start November 2013

Hull Construction Complete November 2013

FLRSU Mechanical Completion July 2014

FLRSU Provisional Acceptance Ex-Yard September 2014

FLSRU Sail to Colombia on Dry Tow Vessel December 2014

FLSRU Moored at Offshore Jetty January 2015

FLRSU Final Commissioning Start January 2015

FLRSU Final Commissioning End April 2015

Provisional Acceptance on Site – Project End April 2015

Page 16: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:16 www.wison.com | www.wison-offshore.com www.wison.com | www.wison-offshore.com

Fully operational in 2006

‒ Located at the bank of the Yangtze River

(76 km from the open sea)

‒ Occupies 640,000 square meters and maintains

735 meters of river front

Annual throughput capacity of 70,000 Tonnes

Staffing:

‒ Normal: 2,300

(700 direct employees plus 1,600 contractors)

‒ Peak: 3,500 (including contractors)

Nantong Yard

Page:16

Page 17: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:17 www.wison.com | www.wison-offshore.com

Hull & Deck Block Fabrication & Dry Dock Build

Hull & Deck Equipment Deliveries

Mechanical Completion

Commissioning

Out-dock, Trials & Seafastening

FLRSU Barge Build Sequence:

Yard Fabrication & Commissioning Sequence

Page 18: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:18 www.wison.com | www.wison-offshore.com

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

WHI’s Dry Dock (260m x 68m)

Page 19: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:19 www.wison.com | www.wison-offshore.com

NO.1 LIFTING BLOCK HB04/05/06C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 20: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:20 www.wison.com | www.wison-offshore.com

NO.1 LIFTING BLOCK HB04/05/06C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 21: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:21 www.wison.com | www.wison-offshore.com

NO.2 LIFTING BLOCK HB01/02/03C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 22: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:22 www.wison.com | www.wison-offshore.com

NO.2 LIFTING BLOCK HB01/02/03C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 23: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:23 www.wison.com | www.wison-offshore.com

NO.3 LIFTING HT11

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 24: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:24 www.wison.com | www.wison-offshore.com

NO.3 LIFTING BLOCK HT11

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 25: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:25 www.wison.com | www.wison-offshore.com

NO.4 LIFTING BLOCK HB04/05/06P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 26: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:26 www.wison.com | www.wison-offshore.com

NO.4 LIFTING BLOCK HB04/05/06P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 27: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:27 www.wison.com | www.wison-offshore.com

NO.5 LIFTING BLOCK HB04/05/06S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 28: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:28 www.wison.com | www.wison-offshore.com

NO.5 LIFTING BLOCK HB04/05/06S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 29: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:29 www.wison.com | www.wison-offshore.com

NO.6 LIFTING BLOCK HB07/08C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 30: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:30 www.wison.com | www.wison-offshore.com

NO.6 LIFTING BLOCK HB07/08C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 31: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:31 www.wison.com | www.wison-offshore.com

NO.7 LIFTING BLOCK HB09/10C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 32: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:32 www.wison.com | www.wison-offshore.com

NO.7 LIFTING BLOCK HB09/10C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 33: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:33 www.wison.com | www.wison-offshore.com

NO.8 LIFTING BLOCK E101C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 34: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:34 www.wison.com | www.wison-offshore.com

NO.8 LIFTING BLOCK E101C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 35: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:35 www.wison.com | www.wison-offshore.com

NO.9 LIFTING BLOCK HT21

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 36: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:36 www.wison.com | www.wison-offshore.com

NO.10 LIFTING BLOCK HB01/02/03P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 37: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:37 www.wison.com | www.wison-offshore.com

NO.11 LIFTING BLOCK HB01/02/03S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 38: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:38 www.wison.com | www.wison-offshore.com

NO.12 LIFTING BLOCK HB07/08/09/10P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 39: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:39 www.wison.com | www.wison-offshore.com

NO.13 LIFTING BLOCK HB07/08/09/10S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 40: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:40 www.wison.com | www.wison-offshore.com

NO.14 LIFTING BLOCK E102C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 41: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:41 www.wison.com | www.wison-offshore.com

NO.15 LIFTING BLOCK E101P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 42: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:42 www.wison.com | www.wison-offshore.com

NO.16 LIFITNG BLOCK E101S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 43: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:43 www.wison.com | www.wison-offshore.com

NO.17 LIFTING BLOCK F101P/S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 44: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:44 www.wison.com | www.wison-offshore.com

NO.18 LIFTING BLOCK HS04/05/06P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 45: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:45 www.wison.com | www.wison-offshore.com

NO.19 LIFTING BLOCK HS04/05/06S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 46: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:46 www.wison.com | www.wison-offshore.com

NO.20 LIFTING BLOCK HS07/08/09/10P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 47: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:47 www.wison.com | www.wison-offshore.com

NO.21 LIFTING BLOCK HS07/08/09/10S之前

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 48: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:48 www.wison.com | www.wison-offshore.com

NO.21 LIFTING BLOCK HS07/08/09/10S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 49: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:49 www.wison.com | www.wison-offshore.com

NO.22 LIFTING BLOCK HS01/02/03P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 50: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:50 www.wison.com | www.wison-offshore.com

NO.23 LIFTING BLOCK HS01/02/03S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 51: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:51 www.wison.com | www.wison-offshore.com

NO.24 LIFTING BLOCK F201P/S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 52: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:52 www.wison.com | www.wison-offshore.com

NO.25 LIFTING BLOCK E201C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 53: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:53 www.wison.com | www.wison-offshore.com

NO.26 LIFTING BLOCK E202C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 54: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:54 www.wison.com | www.wison-offshore.com

NO.27 LIFTING BLOCK F301P/S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 55: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:55 www.wison.com | www.wison-offshore.com

NO.28 LIFTING BLOCK E201/301/401P

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 56: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:56 www.wison.com | www.wison-offshore.com

NO.29 LIFTING BLOCK E201/301/401S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 57: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:57 www.wison.com | www.wison-offshore.com

TGE TANK LIFTING

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 58: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:58 www.wison.com | www.wison-offshore.com

NO.30 LIFTING BLOCK HD07/08/09

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 59: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:59 www.wison.com | www.wison-offshore.com

NO.31 LIFTING BLOCK HD04/05/06

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 60: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:60 www.wison.com | www.wison-offshore.com

NO.32 LIFTING BLOCK HD01/02/03

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 61: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:61 www.wison.com | www.wison-offshore.com

MAIN GENERATOR INSTALLATION

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 62: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:62 www.wison.com | www.wison-offshore.com

NO.33 LIFTING E401C

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 63: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:63 www.wison.com | www.wison-offshore.com

NO.34 LIFTING BLOCK L101/201/301/401P/S

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 64: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:64 www.wison.com | www.wison-offshore.com

NO.35 LIFTING FN

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 65: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:65 www.wison.com | www.wison-offshore.com

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.36 LIFTING WP

Page 66: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:66 www.wison.com | www.wison-offshore.com

HULL ASSEMBLY COMPLETE

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 67: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:67 www.wison.com | www.wison-offshore.com

HULL MAIN DECK TOPVIEW

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 68: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:68 www.wison.com | www.wison-offshore.com

TOPSIDE PIPE RACK INSTALLATION

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 69: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:69 www.wison.com | www.wison-offshore.com

TOPSIDE EQUIPMENT INSTALLATION

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 70: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:70 www.wison.com | www.wison-offshore.com

TOPSIDE TOWER EQUIPMENT INSTALLATION

EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

Page 71: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:71 www.wison.com | www.wison-offshore.com

Block Assembly Mar 2013

Page 72: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:72 www.wison.com | www.wison-offshore.com

Block Assembly Mar 2013

Page 73: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:73 www.wison.com | www.wison-offshore.com

Block Assembly Mar 2013

Page 74: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:74 www.wison.com | www.wison-offshore.com

Fabrication of Piping Rack Mar 2013

Page 75: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:75 www.wison.com | www.wison-offshore.com

Hull Construction June 2013

Page 76: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:76 www.wison.com | www.wison-offshore.com

Keel Laying July 2013.

Page 77: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:77 www.wison.com | www.wison-offshore.com

Tank Delivery and Installation Oct 2013

Page 78: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:78 www.wison.com | www.wison-offshore.com

Setting the Last Deck Nov 2013

Page 79: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:79 www.wison.com | www.wison-offshore.com

Transportation & Installation

Following yard commissioning, FLRSU will be loaded onto transport vessel for dry

transport to Colombia.

FLRSU will be offloaded at inshore location and wet-towed to final installation site.

Permanent mooring brackets will be installed while temporarily moored at site.

Gas export hoses will be installed from jetty to FLRSU.

Voyage: ~13,000 n.miles

Page 80: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:80 www.wison.com | www.wison-offshore.com

Area Reason Mitigation Strategy

Project Execution Efficiency Project execution at multiple sites worldwide

Dedicated interface engineers at subcontractors sites, detailed project execution plan and schedule

Topsides Process Equipment Design (Liquefaction & Regasification)

Proper process operation critical to functionality of unit

Use experienced subcontractor with extensive track-record (Black & Veatch)

Storage Tank Design Tank delivery significantly impacts hull fabrication schedule

Use experienced subcontractor with extensive track-record (TGE)

Mooring & Jetty System Mooring system must interface properly with FLSRU hull structure

Although responsibility of Client, WOM to assign dedicated interface engineer

FLRSU Barge Structure Fabrication Extension of WHI DSV Shipbuilding experience

Experienced project management team with extensive project systems and procedures in place

FLRSU Commissioning (Nantong) Proper process operation critical to functionality of unit, delays effect transportation schedule.

Topsides subcontractor (Black & Veatch) to assist with equipment commissioning. Dedicated WOM Commissioning Engineering team.

FLRSU Barge Transportation Long transportation route from China to Colombia, around COGH due to cargo size

Use experienced subcontractor with extensive track-record. Monitor progress of Panama Canal widening project.

System Installation & Final Commissioning (Colombia)

Multiple project components need to be integrated together. Equipment start-up critical to client.

Dedicated site Installation and Commissioning Engineering team and local Colombian service contracts for hardware, logistics and manpower.

FLRSU Project Technical Challenges

80

Page 81: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:81 www.wison.com | www.wison-offshore.com

Australian FLNG Barge Applications

Page 82: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:82 www.wison.com | www.wison-offshore.com

Australian Opportunities Wison has signed an agreement with Black & Veatch to deliver FLNG barges

globally.

The Australian topography and current productivity situation lends itself to

near-shore Floating solutions:

− Smaller environmental footprint as there is no need to carry out large civil works to

prepare for an on-shore site.

− Barges can be transported to site for installation on a prepared structure or sunk on the

seabed as a gravity based structure.

− Facility can be towed away after a prosperous service life minimising abandonment

costs.

− Fabrication of the facility in a controlled environment ensures completion within

schedule and budget without stretching limited local labor pool further.

− Compact lay-out on the floater along with storage in a hull minimizes footprint and

negates the need for onshore tanks which are expensive to build and slow to permit.

Douglas Channel, Woodfibre and Kitsault have already publically disclosed

barge intentions in Canada.

Page 83: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:83 www.wison.com | www.wison-offshore.com

Summary & Conclusions

The first FLNG Barge, owned and

operated by EXMAR for Pacific

Rubiales Energy will be installed

offshore Colombia in the Caribbean

Sea in 2015.

Wison’s scope in this project is

FLRSU Project Management,

Engineering, Procurement,

Construction, Commissioning,

Transportation, Installation and

Start-up of the Facility.

The Caribbean FLNGis a barge-

based system being fabricated in

the WHI Nantong Yard. The

topsides equipment will be supplied

by Black & Veatch and the storage

tanks and cargo handling system by

TGE.

Barge based FLSU/FSRU systems are

flexible and cost-effective, and provide an

enabler for future small to mid-scale

liquefaction/regasification for emerging

markets (e.g., Asia, North & South

America) especially in remote areas.

Page 84: Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

Page:84 www.wison.com | www.wison-offshore.com

Thank You Suite 24, Level 24, 77 St Georges Tce, Perth, WA.

Kris Martinick – LNG Projects Development Manager

Tel: +61 421 322 737

Alex Yuan – Chief Representative

Tel: +61 405 150 473

www.wison.com | www.wison-offshore.com

Wison Offshore & Marine