Upload
swati-luthra
View
13.103
Download
176
Tags:
Embed Size (px)
DESCRIPTION
jit, just in time, manufacturing, production, operations management, swati luthra
Citation preview
JUST-IN-TIMEMANUFACTURING
A PowerPoint Presentation
BYSWATI(54),
MEENAL(39),REENU(45),
JAYA(66)
WHAT IS JIT?
• JIT is a manufacturing philosophy involving an integrated set of procedures/activities designed to achieve a volume of production using minimal inventories.
• A highly coordinated processing system in which goods move through the system, and services are performed, just as they need.
HOW IT WORKS?
HISTORY
• Evolved in Japan after World War II, as a result of their diminishing market share in the auto industry.
• Founded by Taiichi Ohno, a vice president of Toyota.• Basically implemented in Toyota plant 1950, well
established after 1970.
FOLLOWERS
• Adopted by General Electrical in the USA in the 1980.• Some companies referred JIT with different names:i. TOYOTA – ‘Toyota System’ii. IBM – ‘Continuous flow manufacturing’iii. GE- ‘Management by sight’iv. HEWLETT- PACKARD- ‘stockless production & repetitive
manufacturing system’
7 WASTES
1) Waste of over production2) Waste of waiting3) Waste of transportation4) Waste of Underutilization
of Employees5) Waste of Inventory6) Waste of motion7) Waste of making defective
products
PRINCIPLES OF JIT PRODUCTION
TOTAL QUALITY MANAGEMENT
• Seek long-term commitment
• Quality must be a higher priority than cost
• Minimize Waste
PRODUCTION MANAGEMENT
• Pull System vs. Push System– Pull = Made to order– Push = Made for inventory
• Communication Techniques– Completion of task-Kanban – Problem- Andon or siren/light
• Flexibility of the system
• Design For Testability – Poka-Yoke= Mistake-proofing
SUPPLIER MANAGEMENT
• Establish Long Term Relationships with few suppliers.
• Delivery of Parts = 100% Defect Free– Where they are needed– When they are needed– The exact quantity
• Work Together
• Elimination of inspection of parts
E.g. Toyota Productions
Material quality problems
Long setups
Poor training Break
downs
Material handling
Traditional systems use inventory (water) to buffer the process from problems (rocks) that cause disruption.
Water = Inventory
INVENTORY MANAGEMENT Eliminate Safety Stock = Zero Inventory Inventory is Evil
Material quality problems
Long setups
Poor training
Break downs
Material handling
JIT systems view inventory as waste and work to lower inventory levels to expose and correct the problems (rocks)
that cause disruption.
Material quality problems
Long setups
Poor training
Break downsMaterial handling
Lowering the level of inventory is relatively easy to do. However, the problems that arise must be corrected
quickly … Otherwise, the process will flounder.
HUMAN RESOURCE MANAGEMENT
• Company-wide Involvement– Motivation for
continuous improvement
– Problem Solving
• Diversified Employees
• Management Support and Empowerment of workforce
JIT MANUFACTURING BUILDING BLOCKS
• Product • Design
• Process• Design
• Personnel• Elements
• Manufactur-ing Planning
• Eliminate disruptions• Make the system flexible
• Reduce setup• and lead times
• Eliminate waste• Minimize inventories
• A• balanced• rapid flow
• Ultimate• Goal
• Supporting• Goals
REQUIREMENTS OF JIT• Respond to Customer
Requirements• Integrate all Processes• Employee Participation• Company wide
Commitment to education• Eliminate redundancy• Reduce all Inventory• Establish Continuous
Improvement Goals
• Use a pull Production System
• Design products for Manufacturing
• Develop Controllable Production Processes
• Have Defect Prevention Program
• Reduce Setup Times• Build Products to
Specification
OBSTACLES IN CONVERSION
• Management not committed• Workers not cooperative• Decide which parts need most effort• Start by trying to reduce setup times• Gradually convert operations• Convert suppliers to JIT• Prepare for obstacles• Suppliers may
resist
ADVANTAGES OF JIT
• High quality
• Flexibility
• Reduced setup times
• Reduced need for indirect labor
• Less waste
• Low warehouse cost
• Synchronization between production scheduling and work hour
DISADVANTAGES OF JIT
• Time consuming
• No spare product to meet un expected order
• Supply Shock : If products do not reach on time
• High risk factor
JIT IN GOODS :
• Leveraged JIT principles to make its manufacturing process a success
• Leverage their suppliers to achieve the JIT goal
• Provide exceptionally short set up times to their customers
• Suppliers carry inventory instead of carrying it themselves.
• Has dependable suppliers with the ability to meet its demanding lead time requirements.
• Seamless system that allows it to transmit its component on requirements
• Willingness of suppliers to keep inventory on hand.
JIT IN SERVICES: MAC D
McDonald’s is the best example of JIT in Services !
• McDonald's doesn't begin to cook until a customer has placed a specific order.
• The major benefits are better food at a lower cost.
• Wastage is reduced along with an improvised taste that makes you want to scream out I’m Lovin’ It !
THANK YOU!!