28
JIRA part of shipbuilding process

Jcn12 stx finland

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Jcn12 stx finland

JIRA part of shipbuilding process

Page 2: Jcn12 stx finland

Agenda

• STX Europe, STX Finland, who we are and what we do?

• Shipbuilding working environment

• How we use JIRA of shipbuilding process

Page 2

JIRA part of shipbuilding process - Agenda

Page 3: Jcn12 stx finland

Corporate Structure

STX Corporation

EngineOffshore & Shipbuilding

STX Corporation

STX Europe

OSVFinlandFrance

RaumaShipyard

TurkuShipyard

ArctechAARC Cabins

70%

50%71%

30%

67% 70%

Life Cycle Services

Shipbuilding CompletionENG´n D

Page 4: Jcn12 stx finland

Finland – Cruise & Ferries LNGC Ice Breaker

Norway – OSVs Specialized Vessel

Vietnam - OSVs

China – Bulkers PCTC Drillship FSO Pipelayer

Romania – Bulkers OSVs

Brazil – OSVs

Korea – LNGC FPSO VLCC

Mega Container

France – Cruise & Ferries Naval Vessels

Shipbuilding

Page 6: Jcn12 stx finland

Page 6

STX Finland orderbook

Name Delivery Owner Yard

Polar Supply and Research Vessel (NB-1369)

II / 2012 DEA Rauma

Cruise Ferry (NB-1376) I / 2013 Viking Line Turku

Icebreaking Supply Vessels(NB-506 and 507)

II / 2013 Sovcomflot Helsinki

Fisheries Reseach Vessel(NB-1378)

II / 2012 MFMR of the Republic of Namibia

Rauma

Page 7: Jcn12 stx finland

Viking Line Cruise Ferry with LNG fuel to Baltic Sea

New generation cruise ferry

• abt 2600 man-years employment

• GT 57 000; gross tonnage

The most environmentally friendly big

passenger vessel today

• Uses LNG fuel

• No marine emissions, extremely low aerial emissions

• Wave forming and noise generation minimised

Viking Line

Page 8: Jcn12 stx finland

1250 Stateroom Cruise Ship for TUI Cruises

The sophisticated and highly innovative cruise ship

• Many environmentally friendly features, with a particular emphasis on the vessel's energy efficiency

• A wide variety of restaurants, a theatre, a spa, a nightclub and a large deck area which all are carefully designed to ensure a unique cruising experience for passengers of all ages.

• Abt. 5 500 man-years employment

• 2500 Passengers, 1000 Crew members

• GT 97 000

• Length abt. 295 m and breadthabt. 36 m

TUI Cruises

Page 9: Jcn12 stx finland

Baseline: Shipbuilding working environment

◦ Considerable part of ship production takes place outside the shipyard gates◦ The assembly is done at the shipyard◦ Ships are designed, assembled and outfitted in co-operation between shipyard and

supplier network◦ Network represents 75% of planning and production costs◦ STX Finland is responsible for and co-ordinates the activities; design, production,

assembly including material flows and schedules◦ STX Finland has long-term partnership agreements with selected first tier suppliers

Due to this:◦ Load of ICT varies in time and requests flexibility from all ICT partners◦ Supplier network is using STX IT systems over the internet◦ Some network users are working inside the shipyard using STX workstations◦ Network synergies to be considered in all ICT development

Page 10: Jcn12 stx finland

Infrastructure

laptops

desktops

servers

MF printers,others

Partnernetwork

mobile phones,phones

users

users

Page 11: Jcn12 stx finland

JIRA by STX Finland

28 March 2012

Page 12: Jcn12 stx finland

28 March 2012

Issue Types

Page 13: Jcn12 stx finland

28 March 2012

Issue Types

Page 14: Jcn12 stx finland

Search

Page 15: Jcn12 stx finland

Open ”Inspection”

Page 16: Jcn12 stx finland

Send for approval

Send drawing for approval

Page 17: Jcn12 stx finland

Send for approval

NOTE!!!! Assignee.....

Page 18: Jcn12 stx finland

Create comments (Sub-task) or Approve Drawing

Create comments

Approve drawing without comments

Note! When creating comments status of ”drawing card” is ”sent for approval” as far as all comment are created.

Page 19: Jcn12 stx finland

Create Sub-Task

Select ”Drawing for Approval Remark”

Page 20: Jcn12 stx finland

Send remarks

Remember assignee to Responsible

Page 21: Jcn12 stx finland

Drawing approved with remarks

Page 22: Jcn12 stx finland

Resolve remark

Page 23: Jcn12 stx finland

Accept proposal

Page 24: Jcn12 stx finland

Work done

Assignee !!!!

Page 25: Jcn12 stx finland

Accept remark

Page 26: Jcn12 stx finland

28 March 2012

Ambientia has made us add-on to Jira, which allows for example the sale of a area by iPad.

This add-on is a digital signature, which purpose is to verify the signature of the person responsible for JIRA application in STX's inspection and remarks processes

New fields were created on custom fields section and they based on add-on “User picker from project role”

JIRA and iPad

Page 27: Jcn12 stx finland

28 March 2012

Page 28: Jcn12 stx finland

28 March 2012

Thank You!