Upload
isolux01
View
448
Download
1
Embed Size (px)
Citation preview
SOLAR PHOTOVOLTAIC DIVISION
Building the presentShaping the future
1. COMPANY HIGHLIGHTS
3
1928 CORSÁN
CORVIAM
1933 ISOLUX
WAT
2004
€ 3 Billion annual revenues
€ 25.8 Billion Portfolio
€ 10.6 Billion annual Contracting
8,000 Employees
MAIN FIGURES 2009
The Largest Unlisted Spanish Group in the sector
Grupo Isolux Corsán| Company Highlights
4
Active presence in 25 countries
8 main international
branches
America (9)ArgentinaBrazilChile EcuadorGuatemalaMexicoNicaraguaPeruUnited States
Europe(5)ItalyPolandPortugalRomaniaSpain
Africa (7)Algeria AngolaEq. GuineaGabonMauritaniaMoroccoMozambique
Asia (4)IndiaJordanQatarSyria
Grupo Isolux Corsán| Company Highlights
5
IN 2006 83 % / 17 % IN 2007 48 % / 52 % IN 2008 37 % / 63 % IN 2009 15 % / 85 %
MARKET %NATIONAL / INTERNATIONAL
73% 84% 48% 37%15%
27%16%
52%
63% 85%
0
2.000
4.000
6.000
8.000
10.000
12.000
2005 2006 2007 2008 2009
Nacional Internacional
PROGRESS OF CONTRACTING
117144
191
252 255
7,4% 7,4%
7,9%
7,6%
8,4%
6,8%
7,3%
7,8%
8,3%
8,8%
0
50
100
150
200
250
300
2005 2006 2007 2008 2009
EBITDA Margen EBITDA
118%
EBITDA
10,653
8,843
5,105
2,576 2,080
(In Million Euros)
Grupo Isolux Corsán| Main financial figures
6
68% 69% 60% 43% 21%32% 31%
40%
57%
79%
0
5.000
10.000
15.000
20.000
25.000
30.000
2005 2006 2007 2008 2009
Nacional Internacional
11% 19% 23% 22%43%
89%81%
77%
78% 57%
0
500
1.000
1.500
2.000
2.500
3.000
3.500
2005 2006 2007 2008 2009
Internacional Nacional
1,583
1,941 2,415
3,317 3,018
Operation revenues
Portfolio
5,614 6,375 9,474
15,565
25,839
International
National
(In Million Euros)
Grupo Isolux Corsán| Main financial figures
7
CONCESSIONS
CONSTRUCTION
ENGINEERING AND
INDUSTRIAL
SERVICES
RENEWABLE
ENERGIES
Grupo Isolux Corsán| Business Areas
2. RENEWABLE ENERGIES
9
Main shareholde
r
Renewable energies| Biofuel
Production and marketing of Biofuels through 2 plants owned of 600,000 Tn/year in Castellón and 300,000 Tn/year in Galicia
Construction of turnkey biofuel production plants The Plant of
Castellón is the largest in
Europe
10
Renewable energies| Solar Energy
Main shareholder
EPC – Solar PV Plants Factory of PV solar panels (T-Solar) Ownership of solar farms and energy vendor
Number 1 in Spain A WORLD LEADER
11
ISOLUX CORSÁN BIDS FOR PHOTOVOLTAIC SOLAR
ENERGY
2.1.- 2007-2010 EPC PROJECTS
13
TOTAL EPC EXECUTED / UNDER CONSTRUCTION:• OTHER PROJECTS 2007-2008: 7,3MW• T-SOLAR PROJECT 2008: 137MW• PROJECTS 2009: 26,29MW• PROJECTS 2010: 97,06MW
TOTAL EPC REFERENCES: 267MW
Renewable energies| Solar Energy: SUMMARY
14
Renewable energies| Solar Energy: T- Solar Project 2008Solar Farm Province
Nominal capacity (MW)
Peak power (MW)
Arnedo Logroño 30,0 33,615Elduayen Badajoz 10,0 11,5Almodóvar del Rio Cordoba 8,6 9,5El Carpio Córdoba 8,5 9,5Morita I-IV Córdoba 7,5 8,6Veguilla I-V Córdoba 7,0 8,0Archidona I (5 Plants) Málaga 6,5 7,3Alcolea - Lancha I-III Córdoba 5,6 6,4Fuentes de Valdepero Palencia 4,0 4,5Pozal de Gallinas Valladolid 4,0 4,5Pozohondo Albacete 3,5 4,0El Carpio - BuenaVista I-II Córdoba 3,1 3,6Poza Córdoba 3,1 3,5Sigüenza Guadalajara 3,0 3,4Pozocañada Albacete 2,9 3,3Castillo de Alcolea I-II Córdoba 2,5 2,8Parque Solar Huerto Son Falconer, S.L. Palma Mallorca 2,2 2,4Medina de las Torres Badajoz 2,0 2,3Mogan Tenerife 1,5 1,7Los Mochuelos Jaén 1,1 1,2Espejo Córdoba 1,1 1,3La Seca Valladolid 1,0 1,1Talayuela Cáceres 0,9 1,0Les Trencades Castellon 0,7 0,8Tarifilla Sevilla 0,6 0,7Madrigal Ávila 0,4 0,5
28 Farms 121,37 MW 137 MW
€ 900 million
investment
15
| Team Work
CENTRALIZED COORDINATION OF THE PROJECT
ALL DEPARTMENTS INVOLVED:
RESOURCES FINANCE AND ADMINISTRATION BUSINES DEVELOPMENT ENERGY ENVIRONMENT INSTALLATIONS/FACILITIES TELECOMMUNICATIONS
16
FINANCING:
BBVA arranged the financing for 23 parks Senior Debt: € 700 M Equity: € 125 M VAT Debt: € 112 M Guarantee Facility: € 50 M Leverage: 85/15 12 banks participated in the initial financing and 13 more participated
in the subsequet syndication .
Caixa Nova and Caja Navarra financed 3 other parks . Senior Debt: € 60 M Equity: € 15 M VAT Debt: €9 M Leverage : 80/20
EUROPEAN SOLAR PROJECT 2008
| Effort
17
Renewable energies| Solar Energy
Nominal power 30 MW Annual production 43,845 MWh Annual avoided emissions: CO2 43,000 t/n SO2 317 t/n NOx 235 t/n Used area 70 hectares First step of the project 2008 / 03 / 05 First operation date 2008 / 09 /12 Construction record period 6 MONTHS
One of the biggest solar farms in operation: ARNEDO SOLAR FARM (SPAIN)
18
Renewable energies| Solar Energy:Other Projects 2007-2010
Solar Farm ProvincePeak power
(MW) CLIENTDONADIO JAEN 1,9
EJEA DE LOS CABALLEROSZARAGOZA 2,98
MIRAFLORESZARAGOZA 0,11
MAMPELZARAGOZA 0,1
GALLIZO LAFITAZARAGOZA 0,56
EXEA VERDEZARAGOZA 0,98
PS-FRAGA HUESCA 0,12TS-TAMARITE HUESCA 0,12LOPORZANO AMPLIACION HUESCA 0,21FRAGA HUESCA 0,22HUESCA ROOFTOP HUESCA 0,03CUBIERTA T-SOLAR ORENSE 0,216 T-SOLARCUBIERTA AUTONOMA MADRID 0,937 T-SOLARSAELICES CUENCA 11,4 T-SOLARAMPLIACION ALMODOVAR CORDOBA 1,1 T-SOLARAMPLIACION EL CARPIO CORDOBA 1,7 T-SOLARAMPLIACION VEGUILLA CORDOBA 2,6 T-SOLARFUENTEALAMO SOLAR IV MURCIA 8,1 GA-SOLARCOLEGIOS MALAGA MALAGA 0,3 MALAGA MUNIC.RUSSO MICHELE LESINA 0,98 T-SOLARTARTAGLIA 1 APRICENA 0,628 T-SOLARTARTAGLIA 3 APRICENA 0,98 T-SOLARTARTAGLIA 5 APRICENA 0,78 T-SOLARCURSIO GIUSEPPE APRICENA 0,99 T-SOLAR
LARONGATORREMAG. 0,95 T-SOLAR
COSTANTINO PARADISOTORREMAG. 0,99 T-SOLAR
CELESTE MARIATORREMAG. 0,85 T-SOLAR
CAMPANIA NAPOLI 20,4 SUNEDISONROVIGO ROVIGO 69,5 SUNEDISON
29 Farms 130 MW
2010 Award: ROVIGO SOLAR FARM
(ITALY) - 69,5 MWTHE BIGGEST SOLAR
FARM IN EUROPE
19
ROVIGO
Renewable energies| Solar EnergyThe biggest solar plant in Europe: ROVIGO SOLAR FARM (ITALY)
Peak power 69,5 MW Annual production 78,587 MWh Annual avoided emissions:
CO2 41,000tons Equivalent consumption:
17.150homes Used area 85 hectares First step of the project March 2010
2.2.- INSTALLATION HIGHLIGHTS
21
ALCOLEA
MAIN FEATURES
Occupied area 196,760 m2
Slope 25º
Direction 0º south
Altitude 147 m
Nominal Power 8,10 MWn
Peak Power 9,26 MWp
Number of modules 53,424
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 14,781,690 KWh/year
Equivalent consump. 4,562 homes
Number of inverters 54 x 100 + 24x100 +3x90 + 1x80
Structure Type Fixed
CTs no. 13 CTs
CO2 emissions saved 11,736 Tm
8.10MW
SOLAR PV PLANT ALCOLEA MUNICIPALITY: ALCOLEA / PROVINCE: CÓRDOBA / REGION:
ANDALUCÍA
22
ALMODOVAR
MAIN FEATURES
Occupied area 256,153 m2
Slope 30º
Direction 0º South
Altitude 94 m
Nominal Power 8,600 MWn
Peak Power 9,49 MWp
Number of modules 54,316
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 14,335,305 KWh/year
Equivalent consump. 4,424 Homes
Number of inverters 43 x 100
Structure Type Fixed
CTs no. 8 CTs
CO2 emissions saved 12,384 Tm
8.60MW
SOLAR PV PLANT ALMODOVAR MUNICIPALITY: ALMODOVAR DEL RÍO/ PROVINCE: CÓRDOBA /
REGION: ANDALUCÍA
23
ARCHIDONA
MAIN FEATURES
Occupied area 220,134 m2
Slope 30º
Direction 0º South
Altitude 660 m
Nominal Power 6.50 MWn
Peak Power 7.31 MWp
Number of modules 41,778
Distribut. Co Sevillana
Execution Period 7 months
Electr. Produced 10,747,620 KWh/year
Equivalent consump. 3,320 homes
Number of inverters 65 x 100
Structure Type Fixed
CTs no. 11 CTs
CO2 emissions saved 9,360 Tm
6.50 MW
SOLAR PV PLANT ARCHIDONA MUNICIPALITY: ARCHIDONA/ PROVINCE: MÁLAGA / REGION:
ANDALUCÍA
24
ARNEDO
30.00 MW
MAIN FEATURES
Occupied area 708,800 m2
Slope 30º
Direction 0º South
Altitude 733 m
Nominal Power 30.00 MWn
Peak Power 34.15 MWp
Number of modules 172,800
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 43,845,000 KWh/year
Equivalent consump. 13,532 homes
Number of inversors 100 x 100
Structure Type Fixed
CTs no. 52 CTs
CO2 emissions saved 43,200 Tm
SOLAR PV PLANT ARNEDO MUNICIPALITY: ARNEDO/ PROVINCE: LOGROÑO / REGION: LA RIOJA
25
EL CARPIO
MAIN FEATURES
Occupied area 42,069 m2
Slope 30º
Direction 0º South
Altitude 126 m
Nominal Power 11.61 MWn
Peak Power 13.05 MWp
Number of modules 59,867
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 19,890,000 KWh/year
Equivalent consump. 6,150 homes
Number of inverters 85x100 + 31x99 + 1x45
Structure Type Fixed
CTs no. 14 CTs
CO2 emissions saved 16,935.8 Tm11.61MW
SOLAR PV PLANT EL CARPIO MUNICIPALITY: EL CARPIO/ PROVINCE: CÓRDOBA / REGION: ANDALUCIA
26
ELDUAYEN
MAIN FEATURES
Occupied area 245,136 m2
Slope 30º
Direction 0º South
Altitude 283 m
Nominal Power 10.000MWn
Peak Power 11.48 MWp
Number of modules 59,079
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 16,450,700 KWh/year
Equivalent consump. 5,077 homes
Number of inverters 33x100 + 1x100
Structure Type Fixed
CTs no. 17 CTs
CO2 emissions saved 14,400 Tm
10.00MW
SOLAR PV PLANT ELDUAYEN MUNICIPALITY: VALVERDE DE MÉRIDA/ PROVINCE: BADAJOZ /
REGION: EXTREMADURA
27
ESPEJO
MAIN FEATURES
Occupied area 42,985 m2
Slope 30º
Direction 0º South
Altitude 420 m
Nominal Power 1.13 MWn
Peak Power 1.34 MWp
Number of modules 7,650
Distribut. Co Sevillana
Execution Period 4 months
Electr. Produced 1,969,284.9 KWh/year
Equivalent consump. 608 homes
Number of inverters 12x100 + 1x50
Structure Type Fixed
CTs no. 1 CTs
CO2 emissions saved 1,627.2 Tm1.13MW
SOLAR PV PLANT ESPEJO MUNICIPALITY: ESPEJO/ PROVINCE: CÓRDOBA / REGION: ANDALUCÍA
28
FUENTES DE VALDEPEROMAIN FEATURES
Occupied area 120,000 m2
Slope 30º
Direction 0º South
Altitude 770 m
Nominal Power 4.00 MWn
Peak Power 4.48 MWp
Number of modules 25,344
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 6,201,600 KWh/year
Equivalent consump. 1,914 homes
Number of inverters 40 x 100
Structure Type Fixed
CTs no. 20 CTs
CO2 emissions saved 5,760 Tm
4.00MW
SOLAR PV PLANT FUENTES DE VALDEPERO MUNICIPALITY: FUENTES DE VALDEPERO/ PROVINCE: PALENCIA/ REGION:
CASTILLA Y LEÓN
29
LA POZA
3.06 MW
MAIN FEATURES
Occupied area 205,000 m2
Slope Follower
Direction Follower
Altitude 630 m
Nominal Power 3.06 MWn
Peak Power 3.46 MWp
Number of modules 19,776
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 6,751,033 KWh/year
Equivalent consump. 2,084 homes
Number of inverters 30x99+1x90
Structure Type Follower
CTs no. 5 CTs
CO2 emissions saved 4,449.6 Tm
SOLAR PV PLANT LA POZA MUNICIPALITY: FUENTE OBEJUNA/ PROVINCE: CÓRDOBA / REGION:
ANDALUCÍA
30
LA SECAMAIN FEATURES
Occupied area 42,212m2
Slope 30º
Direction 0º South
Altitude 977 m
Nominal Power 0.96 MWn
Peak Power 1.13 MWp
Number of modules 6,840
Distribut. Co Iberdrola
Execution Period 4 months
Electr. Produced 1,349,520 KWh/year
Equivalent consump. 416 homes
Number of inverters 10 x 96
Structure Type Fixed
CTs no. 5 CTs
CO2 emissions saved 1,382.4 Tm
0.96MW
SOLAR PV PLANT LA SECA MUNICIPALITY: LA SECA/ PROVINCE: VALLADOLID / REGION: CASTILLA Y
LEÓN
31
LES TRENCADES
MAIN FEATURES
Occupied area 28,118 m2
Slope 30º
Direction 0º South
Altitude 120 m
Nominal Power 0.70 MWn
Peak Power 0.80 MWp
Number of modules 4,640
Distribut. Co Iberdrola
Execution Period 4 months
Electr. Produced 1,194,007 KWh/year
Equivalent consump. 370 homes
Number of inverters 7 x 100
Structure Type Fixed
CTs no. 7 CTs
CO2 emissions saved 1,008 Tm
0.70MW
SOLAR PV PLANT LESTRENCADES MUNICIPALITY: ONDA/ PROVINCE: CASTELLÓN / REGION: VALENCIA
32
LOS MOCHUELOS
MAIN FEATURES
Occupied area 40,870 m2
Slope 30º
Direction 0º South
Altitude 900 m
Nominal Power 1.10 MWn
Peak Power 1.23 MWp
Number of modules 7,216
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 1,671,450 KWh/year
Equivalent consump. 516 homes
Number of inverters 11 x 100
Structure Type Fixed
CTs no. 2 CTs
CO2 emissions saved 1,584 Tm
1.10MW
SOLAR PV PLANT LOS MOCHUELOS MUNICIPALITY: CHICLANA DE SEGURA/ PROVINCE: JAÉN / REGION:
ANDALUCÍA
33
MADRIGAL
MAIN FEATURES
Occupied area 13,630 m2
Slope 30º
Direction 0º South
Altitude 800 m
Nominal Power 0.44 MWn
Peak Power 0.52 MWp
Number of modules 2,864
Distribut. Co Iberdrola
Execution Period 4 months
Electr. Produced 753,558 KWh/Year
Equivalent consump. 223 Homes
Number of inverters 2 x 100
Structure Type Fixed
CTs no. 3 CTs
CO2 emissions saved 633.6 Tm
0.44 MW
SOLAR PV PLANT MADRIGAL MUNICIPALITY: MADRIGAL DE LAS ALTAS TORRES/ PROVINCE: ÁVILA /
REGION: C. Y LEÓN
34
MEDINA DE LAS TORRES
2.00MWMAIN FEATURES
Occupied area 62,552 m2
Slope 30º
Direction 0º South
Altitude 518 m
Nominal Power 2.00 MWn
Peak Power 2.28 MWp
Number of modules 11,240
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 6,739,920 KWh/Year
Equivalent consump. 2,080 Homes
Number of inverters 40 x 100
Structure Type Fixed
CTs no. 4 CTs
CO2 emissions saved 5,760Tm
SOLAR PV PLANT MEDINA DE LAS TORRES MUNICIPALITY: MEDINA DE LAS TORRES / PROVINCE: BADAJOZ /
REGION: EXTREMADURA
35
MOGAN BACOL
1.52 MW MAIN FEATURES
Occupied area 47,482 m2
Slope 25º
Direction 0º South
Altitude 107 m
Nominal Power 1.52 MWn
Peak Power 1.67 MWp
Number of modules 8,560
Distribut. Co Unelco
Execution Period 4 months
Electr. Produced 2,914,427.5 KWh/Year
Equivalent consump. 900 Homes
Number of inverters 14x100 +1x75 +1x50
Structure Type Fixed
CTs no. 16 CTs
CO2 emissions saved 2,196 Tm
SOLAR PV PLANT MOGAN BACOL MUNICIPALITY: ARICO / PROVINCE: TENERIFE/ REGION: CANARIAS
36
MORITA7.52 MW
MAIN FEATURES
Occupied area 282,933m2
Slope 25º
Direction 0º South
Altitude 341 m
Nominal Power 7.52 MWn
Peak Power 8.70 MWp
Number of modules 44,187
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 12,852,000 KWh/Year
Equivalent consump. 3,667 Homes
Number of inverters 36x100 +36x99 +4x90
Structure Type Fixed
CTs no. 12 CTs
CO2 emissions saved 10,886.4Tm
SOLAR PV PLANT MORITA MUNICIPALITY: AGUILAR DE LA FRONTERA / PROVINCE: MÁLAGA /
REGION: ANDALUCÍA
37
POZAL DE GALLINAS
4.00MW
MAIN FEATURES
Occupied area 132,400 m2
Slope 30º
Direction 0º South
Altitude 737 m
Nominal Power 4.00 MWn
Peak Power 4.50 MWp
Number of modules 25,472
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 6,174,720 KWh/Year
Equivalent consump. 1,906 Homes
Number of inverters 40 x 100
Structure Type Fixed
CTs no. 20 CTs
CO2 emissions saved 5,760Tm
SOLAR PV PLANT POZAL DE GALLINAS MUNICIPALITY: POZAL DE GALLINAS / PROVINCE: VALLADOLID / REGION:
CASTILLA Y LEÓN
38
POZOCAÑADA
MAIN FEATURES
Occupied area 97,004 m2
Slope 30º
Direction 0º South
Altitude 833 m
Nominal Power 2.90 MWn
Peak Power 3.34 MWp
Number of modules 18,800
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 4,683,616 KWh/Year
Equivalent consump. 1,446 Homes
Number of inverters 29 x 100
Structure Type Fixed
CTs no. 5 CTs
CO2 emissions saved 4,176 Tm
2.90MW
SOLAR PV PLANT POZOCAÑADA MUNICIPALITY: CHINCHILLA DE MONTEARAGÓN / PROVINCE: ALBACETE / REGION:
C. LA MANCHA
39
POZOHONDO
3.50MW MAIN FEATURES
Occupied area 119,889 m2
Slope 30º
Direction 0º South
Altitude 860 m
Nominal Power 3.50 MWn
Peak Power 3.99 MWp
Number of modules 23,408
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 5,811,540 KWh/Year
Equivalent consump. 1,794 Homes
Number of inverters 35 x 100
Structure Type Fixed
CTs no. 6 CTs
CO2 emissions saved 5,040 Tm
SOLAR PV PLANT POZOHONDO MUNICIPALITY: POZOHONDO / PROVINCE: ALBACETE / REGION: C. LA
MANCHA
40
SON FALCONER
2.20MW
MAIN FEATURES
Occupied area 47,600 m2
Slope 25º
Direction 0º South
Altitude 88 m
Nominal Power 2.20 MWn
Peak Power 2.36 MWp
Number of modules 13,464
Distribut. Co Gesa-Endesa
Execution Period 4 months
Electr. Produced 3,175,546 KWh/Year
Equivalent consump. 980 Homes
Number of inverters 22 x 99
Structure Type Fixed
CTs no. 22 CTs
CO2 emissions saved 3,168 Tm
SOLAR PV PLANT SON FALCONER MUNICIPALITY: MARRATXI / PROVINCE: PALMA DE MALLORCA / REGION:
BALEARES
41
TALAYUELA
MAIN FEATURES
Occupied area 25,430 m2
Slope 25º
Direction 0º South
Altitude 286 m
Nominal Power 0.90 MWn
Peak Power 1.05 MWp
Number of modules 6,480
Distribut. Co Iberdrola
Execution Period 4 months
Electr. Produced 1,460,421 KWh/Year
Equivalent consump. 450 Homes
Number of inverters 9 x 100
Structure Type Fixed
CTs no. 5 CTs
CO2 emissions saved 1,296 Tm
0.90 MW
SOLAR PV PLANT TALAYUELA MUNICIPALITY: TALAYUELA / PROVINCE: CÁCERES / REGION:
EXTREMADURA
42
TARIFILLA
0.60 MW
MAIN FEATURES
Occupied area 23,700 m2
Slope 30º
Direction 0º South
Altitude 630 m
Nominal Power 0.60 MWn
Peak Power 0.67 MWp
Number of modules 3,024
Distribut. Co Sevillana
Execution Period 3 months
Electr. Produced 934,074 KWh/year
Equivalent consump. 288 Homes
Number of inverters 6x100
Structure Type Fixed
CTs no. 1 CTs
CO2 emissions saved 864Tm
SOLAR PV PLANT TARIFILLA MUNICIPALITY: LOS MOLARES / PROVINCE: SEVILLA / REGION:
ANDALUCÍA
43
VEGUILLA
7.04MW
MAIN FEATURES
Occupied area 227,000 m2
Slope 30º
Direction 0º South
Altitude 167 m
Nominal Power 7.04 MWn
Peak Power 8.02 MWp
Number of modules 32,644
Distribut. Co Sevillana
Execution Period 6 months
Electr. Produced 11,683,381 KWh/year
Equivalent consump. 3,606 Homes
Number of inverters 67x100+3x90 +1x75
Structure Type Fixed
CTs no. 12 CTs
CO2 emissions saved 10,144.80 Tm
SOLAR PV PLANT VEGUILLA MUNICIPALITY: MONTORO / PROVINCE: CÓRDOBA / REGION:
ANDALUCÍA
44
SIGÜENZA
1,100MW
3,000MW
MAIN FEATURES
Occupied area 104.700 m2
Slope 30º
Direction 0º South
Altitude 950 m
Nominal Power 3,00 MWn
Peak Power 3,48984 MWp
Number of modules 12,960
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 4,775,070 KWh/year
Equivalent consump. 1,474 Homes
Number of inverters 30x100
Structure Type Fixed
CTs no. 15 CTs
CO2 emissions saved 4,320,00 Tm
SOLAR PV PLANT SIGÜENZA MUNICIPALITY: SIGÜENZA / PROVINCE: GUADALAJARA / REGION:
CASTILLA LA MANCHA
45
SOLAR PV PLANT AUTONOMA UNIVERSITY MUNICIPALITY: MADRID / PROVINCE: MADRID / REGION: MADRID
MAIN FEATURES
Occupied area 199.155m2
Slope 5º (Roof)15º (Parking Lot)
Direction 25º SE
Altitude 728/m
Nominal Power 0.845MWn
Peak Power 0.9376MWp
Number of modules 6,480
Distribut. Co Iberdrola
Execution Period 5,5 months
Electr. Produced 1.313.270 KWh/year
Equivalent consump. 405 Homes
Number of inverters 10
Structure Type Fixed
CTs no. 2 CTs
CO2 emissions saved 1,140,32 Tons
AUTONOMA UNIVERSITY
0.85 MW
46
SOLAR PV PLANT SAELICES MUNICIPALITY: SAELICES/ PROVINCE: CUENCA / REGION: CASTILLA LA MANCHA
MAIN FEATURES
Occupied area 57.00ha.
Slope 30º
Direction SOUTH
Altitude 728m
Nominal Power 10MWn
Peak Power 11,016MWp
Number of modules 129.600
Distribut. Co Iberdrola
Execution Period 3 months
Electr. Produced 16,243,000 KWh/year
Equivalent consump. 5,045.63 Homes
Number of inverters 20
Structure Type Fix
CTs no. 20 CTs
CO2 emissions saved 14,103,96 Tons
SAELICES
10 MW
47
SOLAR PV PLANT FUENTEALAMO MUNICIPALITY: FUENTE ALAMO / PROVINCE: MURCIA / REGION: MURCIA
MAIN FEATURES
Occupied area 33ha
Slope 30º
Direction SOUTH
Altitude 128/m
Nominal Power 7MWn
Peak Power 8.06MWp
Number of modules 35,838
Distribut. Co Iberdrola
Execution Period 6 months
Electr. Produced 14,411,393 KWh/year
Equivalent consump. 4,447 Homes
Number of inverters 14 x 500kW
Structure Type 1 Axis Tracking
CTs no. 7 CTs
CO2 emissions saved12,513.56 tons
FUENTE ALAMO
7.0 MW
48
SOLAR PV PLANT TSOLAR MUNICIPALITY: S. CIBRAO / PROVINCE: ORENSE/ REGION: GALICIA
MAIN FEATURES
Occupied area 11,253m2
Slope 15º (Roof)15º (Parking Lot)
Direction 6ºNS
Altitude 691/m
Nominal Power 0.200MWn
Peak Power 0.216MWp
Number of modules 2,544
Distribut. Co Union Fenosa
Execution Period 2,5 months
Electr. Produced 258,218.37 KWh/year
Equivalent consump. 80 Homes
Number of inverters 2
Structure Type Fix
CTs no. 1 CTs
CO2 emissions saved 225,06Tm
TSOLAR
0.200 MW
49
ROVIGO
MAIN FEATURES
Occupied area 850,000 sqm
Slope 12º
Direction 10.20ºSW
Altitude 3 m
Nominal Power 59,5 MWn
Peak Power 69.5MWp
Number of modules 281,850
Distribut. Co TERNA
Execution Period 9 months
Electr. Produced 78,587 MWh
Equivalent consump. 17.150 Homes
Number of inverters 89
Structure Type Fix
CTs no. 30 CTs
CO2 emissions saved 41,000 Tons
SOLAR PV PLANT ROVIGO MUNICIPALITY: S. BELLINO - CASTELGUGLIELMO / PROVINCE: ROVIGO / REGION:
VENETO, ITALY
69.5 MW
50
CAMPANIA
MAIN FEATURES
Occupied area 495,000 sqm
Slope 30º
Direction 0º
Altitude 32 m
Nominal Power 18.00 MWn
Peak Power 20.42MWp
Number of modules 88.200
Distribut. Co TERNA
Execution Period 4 months
Electr. Produced 25,560 MWh
Equivalent consump. 6.250 Homes
Number of inverters 18
Structure Type Fix
CTs no. 18
CO2 emissions saved 15,000 TonsSOLAR PV PLANT CAMPANIA MUNICIPALITY: / PROVINCE: NAPOLI / REGION: CAMPANIA, ITALY
18.00 MW
51
THANKS FOR YOUR ATTENTION !