1 L’Autorizzazione L’Autorizzazione Integrata Ambientale Integrata Ambientale (A.I.A.) (A.I.A.) Aspetti normativi e casi di studio Dr. Federico Balzan eAmbiente srl Marghera (VE), 22 novembre 2011 Marghera (VE), 22 novembre 2011 Federico Balzan eAmbiente Srl Venice International University November 22 2011 IPPC Directive: the Integrated Environmental Authorization (IEA)

IPPC Directive: the Integrated Environmental Authorization (IEA)

Embed Size (px)

DESCRIPTION

Environmental Protection Supervision and InspectionThe Center for Thematic Environmental Networks (TEN) is a Center for education and research in the fields of environment and sustainable development.TEN Center promotes the exchange of knowledge and information on the environmental field and offers tools and supplementary approaches in order to solve environmental issues with specific reference to sustainable development.TEN Center: promotes education and advanced training programs on sustainable development and environmental management; develops research activities on the main areas of environmental protection, with specific focus on developing countries; hosts initiatives which provide a meeting platform for the competent authorities, researchers and those who are involved in environmental and sustainable development issues.Since 2003, TEN manages and coordinates advanced training programs devised for director generals and managers of public administrations, researchers and private sector experts from the People’s Republic of China and Eastern European countries. The aim is to augment and improve the capabilities of policy-makers and to facilitate knowledge transfer in order to promote sustainable environmental, social and economic policies.

Citation preview

Page 1: IPPC Directive: the Integrated Environmental Authorization (IEA)

11

L’Autorizzazione Integrata L’Autorizzazione Integrata Ambientale (A.I.A.)Ambientale (A.I.A.)

Aspetti normativi e casi di studioDr. Federico Balzan

eAmbiente srl

Marghera (VE), 22 novembre 2011Marghera (VE), 22 novembre 2011

Federico BalzaneAmbiente Srl

Venice International UniversityNovember 222011

IPPC Directive: the Integrated Environmental Authorization (IEA)

Page 2: IPPC Directive: the Integrated Environmental Authorization (IEA)

22

Page 3: IPPC Directive: the Integrated Environmental Authorization (IEA)

33

Page 4: IPPC Directive: the Integrated Environmental Authorization (IEA)

European, national and local Regulations•Dir. 96/61/CE del 24/09/96

•Dir. 2008/01/CE del 15/01/08

•D.Lgs. 372/99 del 04/08/99

•Circolare Min. Amb. 13.07.2004

•Titolo III -bis , Parte Seconda del D.Lgs. 152/06 e ss.mm.ii.

•DGRV 668/07 del 20/03/07

•DGRV 2493 del 07/08/07

•L.R. 26/07 del 16/08/07

•DGRV 1519 del 26/05/09

•DGRV 242 del 09/02/10

Page 5: IPPC Directive: the Integrated Environmental Authorization (IEA)

The “IEA”(Integrated Environmental Authorization)

regulations in Italy

(“AIA” in italian)

Page 6: IPPC Directive: the Integrated Environmental Authorization (IEA)

VocabularyThe IEA Integrated Environmental Authorization (AIA in italian) is the measure that authorizes the operation of a plant or part of it under certain conditions, which must ensure compliance with legal requirements (IPPC directive – Integrated Pollution Prevention and Control)

Directive 1996/61/CE by European Parliament and Council on IPPC

Decreto legislativo 3 aprile 2006, n. 152

2008/1/CE by European Parliament and Council

Decreto legislativo 29 giugno 2010, n. 128

transposition

transposition

development

Page 7: IPPC Directive: the Integrated Environmental Authorization (IEA)

VocabularyIntegrated Environmental Authorization (IEA-AIA) = "the measure that authorizes a plant falling between those of Article 4, paragraph 4, letter c), or part of it under certain conditions which guarantee that the plant complies with the requirements of Title III bis of the Legislative Decree no. 152/06 and subsequent amendments and integrations.Integrated environmental authorization (IEA-AIA) may cover one or more plants or parts of it, which are located on the same site and operated by the same operator“ (Article 4, paragraph 1, letter or bis of Legislative Decree no. 152/06 and subsequent amendments)Plant = "the stationary technical unit where one or more activities listed in Annex VIII and any other ancillary activities are set, which are technically related with the activities in that site and could affect emissions and pollution" (Art . 5, paragraph 1, letter i-c, Leg. 152/06and subsequent amendments)

Page 8: IPPC Directive: the Integrated Environmental Authorization (IEA)

1. Energy industries.1.1 Combustion installations with a rated thermal input exceeding 50 MW.1.2. Mineral oil and gas refinery.1.3. Coke ovens.1.4. Coal gasification and liquefaction plants.2. Production and processing of metals.2.1 Roasting or sintering metal ore, including sulphide ore.2.2. Installations for the production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2.5 tonnes per hour.2.3. Installations for the processing of ferrous metals:a) hot-rolling mills with a capacity exceeding 20 tonnes of crude steel per hour;b) forging with hammers the energy of which exceeds 50 kilojoules per hammer, where 'the calorific power and' greater than 20 MW;c) application of protective fused metal coats with an input exceeding 2 tonnes of crude steel per hour.2.4. Ferrous metal foundries with a production capacity exceeding 20 tonnes perday.2.5. Plants:a) for the production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes;b) melting alloy and non-ferrous metals, including recovered products (refining,foundry casting, etc.), with a melting capacity exceeding 4 tonnes per day for leadand cadmium or 20 tonnes per day for all other metals.2.6. Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process where the tanks of the treatment have a traffic volume exceeds 30 m3.

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

Page 9: IPPC Directive: the Integrated Environmental Authorization (IEA)

3. Mineral industry.3.1. Installations for the production of clinker (cement) in rotary kilns with a production capacity exceeding 500 tonnes per day or lime in rotary kilns with a production capacity exceeding 50 tonnes per day, or in other furnaces with a capacity of production of more than 50 tonnes per day.3.2. Installations for the production of asbestos and the manufacture of asbestos products.3.3. Installations for the manufacture of glass including the production of glass fibers with a melting capacity exceeding 20 tonnes per day.3.4. Installations for melting mineral substances including those involving the production of mineral fibers with a melting capacity exceeding 20 tonnes per day.3.5. Installations for the manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain, with a production capacity exceeding 75 tonnes per day and / or with a kiln capacity exceeding 4 m3 and with density per kiln exceeding 300 kg/m3.

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

Page 10: IPPC Directive: the Integrated Environmental Authorization (IEA)

4. Chemical industry.Within the categories of activities under Section 4 shall mean the production on an industrial scale by chemical substances or groups of substances referred to in paragraphs 4.1 to 4.6.4.1 Chemical installations for the manufacture of organic chemicals basics such as:a) simple hydrocarbons (linear or cyclic, saturated or unsaturated aliphatic or aromatic);b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, acids carboxylic acids, sters, acetates, ethers, peroxides, epoxy resins; c) sulphurous hydrocarbons; d) nitrogenous hydrocarbons, including amines, amides, nitrous compounds, or nitrate compounds, nitriles, cyanates, isocyanates; e) phosphorus-containing hydrocarbons; f) halogenated hydrocarbons; g) organometallic compounds; h) basic plastic materials (polymers, synthetic fibers, fiber-based cellulose); i) synthetic rubbers; j) dyes and pigments; k) surface-active agents and surfactants.4.2. Chemical installations for the production of chemicals inorganic bases, such as:a) gases, such as ammonia, chlorine or hydrogen chloride, fluorine or fluoride hydrogen, carbon oxides, sulfur compounds, nitrogen oxides, hydrogen, sulfur dioxide, carbonyl dichloride;b) acids, such as chromic acid, hydrofluoric acid, phosphoric acid,nitric acid, hydrochloric acid, sulfuric acid, oleum, sulphurous acids;c) bases, such as ammonium hydroxide, potassium hydroxide, ammonium hydroxide,sodium;d) salts such as ammonium chloride, potassium chlorate, carbonatepotassium, sodium carbonate, perborate, silver nitrate;e) non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide.4.3. Chemical installations for the manufacture of fertilizers phosphorus, nitrogen or potassium (simple or compound fertilizers).4.4 Chemical installations for the manufacture of basic products plant protection products and biocides.4.5 Installations using a chemical or biological process for the manufacture of basic pharmaceutical products 4.6. Chemical installations for the manufacture of explosives.

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

Page 11: IPPC Directive: the Integrated Environmental Authorization (IEA)

5. Waste management.Except those of Art. 11 of Directive 75/442/EEC and Art. 3 of Directive 91/689/EEC of 12 December 1991 on hazardous waste.5.1. Installations for the disposal or recycling of hazardous waste, the list of article. 1,paragraph 4 of Directive 91/689/EEC, as defined in Annexes II A and II B (operationsR 1, R 5, R 6, R 8 and R 9) of Directive 75/442/EEC and Directive 75 / 439/CEE of the Council of 16 June 1975 on the disposal of waste oils, with a capacity exceeding 10 tonnes per day.

5.2. Installations for the incineration of municipal waste as defined in Council Directive 89/369/EEC of 8 June 1989 on the prevention of air pollution from newmunicipal waste incineration plants, and in Directive 89/429/EEC Council of 21 June 1989 on the reduction of air pollution from municipal waste incineration plants with acapacity exceeding 3 tonnes per hour.

5.3. Installations for the disposal of non-hazardous waste as defined in Annex A to Directive 1175/442/EEC under headings D8 and D9, with a capacity exceeding 50 tonnes per day.

5.4. Landfills receiving more than 10 tonnes per day or with a total capacity of over 25,000tonnes, excluding landfills of inert waste.

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

Page 12: IPPC Directive: the Integrated Environmental Authorization (IEA)

6. Other activities.6.1. Industrial plants for the manufacture of:a) pulp from timber or other fibrous materials;b) paper and board with a production capacity exceeding 20 tonnes per day;6.2. Plants for the pretreatment (operations such as washing, bleaching,mercerization) or dyeing of fibers or textiles where the treatment capacity exceeds 10 tonnes per day.6.3. Plants for the tanning of hides and skins where the treatment capacity exceeds 12 tonnes per day of finished product.6.4:a) Slaughterhouses with a carcass production capacity exceeding 50 tonnes perday;b) Treatment and processing intended for the manufacture of food products from:Animal raw materials (other than milk) with a finished product production capacity greater than 75 tons per day or vegetable raw materials with a production capacityof finished products than 300 tonnes per day (average value on a quarterly basis);c) Treatment and processing of milk, the quantity of milk received being greater than200 tons per day (average value on an annual basis).

6.5. Installations for the disposal or recycling of animal carcasses and animal waste with a treatment capacity exceeding 10 tonnes per day.6.6. Installations for the intensive rearing of poultry or pigs with more than:a) 40,000 places for poultry;b) 2,000 places for production pigs (over 30 kg), orc) 750 places for sows.6.7. Installations for surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing,waterproofing, sizing, painting, cleaning or impregnating, with a consumption capacity of more than 150 kg at 'hour or 200 tons per year.6.8. Installations for the production of carbon (hard-burnt coal) or electrographitemeans of incineration or graphitization.

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

Page 13: IPPC Directive: the Integrated Environmental Authorization (IEA)

Veneto Region IEA activities (751 definetly authorized)

The activities listed in Annex VIII to Part II of Legislative Decree no. 152/06

LivestockWaste treatment

Others

Page 14: IPPC Directive: the Integrated Environmental Authorization (IEA)

Types of plants subject to national IEA- AIA (Annex XII to Part II of Legislative Decree no.152/06 and subsequent

amendments):

1) Crude oil refineries (excluding undertakings manufacturing only lubricants from crude oil) and installations for the gasification and liquefaction of 500 tonnes (Mg) per day of coal or oil shale;2) Thermal power stations and other combustion installations with a heat output of 300 megawatts;3) Integrated works for the initial smelting of cast iron and steel;4) Chemical installations with total annual production capacity by class of product, expressed in millions of kilograms, exceeding the thresholds;5)Plants that are functionally connected to a plant referred to above, located on the same site, operated by the same operator, who do not perform activities listed in Annex VIII;6) Other plants included in the categories listed in Annex I located entirely in the sea.

The activities listed in Annex XII to Part II of Legislative Decree no. 152/06

Page 15: IPPC Directive: the Integrated Environmental Authorization (IEA)

The activities listed in Annex XII to Part II of Legislative Decree no. 152/06

National IEA: where are our plants?

Page 16: IPPC Directive: the Integrated Environmental Authorization (IEA)

Summarizing: subjection to IEA (AIA) (and referred jurisdiction) dependent on:

1. Exercise of certain plants / production of certain products

2. (if any) production capacity of the plant

Page 17: IPPC Directive: the Integrated Environmental Authorization (IEA)

Single permissions replaced by IEA (AIA)

(Appendix IX to Part II of Legislative Decree no. 152/06 ):

1. Authorization to emissions into the atmosphere, without prejudice to the profiles on the health aspects (Title I of Part Five of the Legislative Decree no. 152/06 and subsequent amendments).2. Authorization to water drainage (Chapter II of Title IV of Part Three of the Legislative Decree no. 152/06 and subsequent amendments).3. Authorisation only for new disposal facilities and recycling of waste (Art. 208 of Legislative Decree no. 152/06 and subsequent amendments).4. Authorization for disposal of equipment containing PCB-PCT *(Legislative Decree22 May 1999, No. 209, Art. 7).5. Authorization for the use of sewage sludge from the purification process in agriculture (Legislative Decree 27 January 1992, No. 99, Art. 9).

* Components of transformer oil

Page 18: IPPC Directive: the Integrated Environmental Authorization (IEA)

1818

Concept of "technically connected activities""For ancillary activity, technically linked to a core business within one of the categories listed in Annex I of the Legislative Decree 372/1999, shall mean a business: (see Circular Min Amb. 13/07/2004)

a) held by the same operator;

b) the principal activity conducted on the same site or a site adjacent and directly connected to the site of the primary means of functional technological infrastructure for the conduct of the principal;

c) the details have some involvement with the technical procedures for carrying out the main activity.

Page 19: IPPC Directive: the Integrated Environmental Authorization (IEA)

1919

Concept of "technically connected activities"

So a plant can have:

- Only one IEA (AIA);- One IEA (AIA) and other separate and sectoral permits; - Two or more AIA (and any other separate and sectoral permits).

Page 20: IPPC Directive: the Integrated Environmental Authorization (IEA)

2020

The "philosophy" of the IEA (AIA)see Recitals of the Directive 2008/1/EC

• (8) Different approaches to control emissions into air, water or soil may promote the transfer of pollution between the various environmental media rather than protecting the environment as a whole.

• (9) An integrated approach to pollution control is to prevent, wherever possible, emissions to air, water or soil, taking into account the waste management and, at least, to reduce them to a minimum to achieve a high level of environmental protection as a whole.

• (18) emission limit values , parameters or equivalent technical measures should be based on Best Available Techniques (BAT), without prescribing the use of a technique or specific technology, but taking into consideration the technical characteristics of the installation concerned, its geographical position and local environmental conditions.

• (24) ... the public should have access to information on the operation of the plants and their potential effects on the environment ...

Page 21: IPPC Directive: the Integrated Environmental Authorization (IEA)

2121

The "philosophy" of the IEA (AIA)see Recitals of the Directive 2008/1/EC

• (8) Different approaches to control emissions into air, water or soil may promote the transfer of pollution between the various environmental media rather than protecting the environment as a whole.

• (9) An integrated approach to pollution control is to prevent, wherever possible, emissions to air, water or soil, taking into account the waste management and, at least, to reduce them to a minimum to achieve a high level of environmental protection as a whole.

• (18) emission limit values , parameters or equivalent technical measures should be based on Best Available Techniques (BAT), without prescribing the use of a technique or specific technology, but taking into consideration the technical characteristics of the installation concerned, its geographical position and local environmental conditions.

• (24) ... the public should have access to information on the operation of the plants and their potential effects on the environment ...

Best: the most effective techniques to achieve a high level of environmental protection as a whole.Techniques: the techniques used and the ways used to design, construct, keep, operate and close a plantAvailable: the techniques developed on a scale which allows implementation under economically and technically viable in the relevant industrial sector, taking into consideration the costs and benefits, regardless if they are used or produced in the Member State in question, provided that the operator can have access on reasonable terms.

Page 22: IPPC Directive: the Integrated Environmental Authorization (IEA)

2222

The "philosophy" of the IEA (AIA)see Recitals of the Directive 2008/1/EC

• (8) Different approaches to control emissions into air, water or soil may promote the transfer of pollution between the various environmental media rather than protecting the environment as a whole.

• (9) An integrated approach to pollution control is to prevent, wherever possible, emissions to air, water or soil, taking into account the waste management and, at least, to reduce them to a minimum to achieve a high level of environmental protection as a whole.

• (18) emission limit values , parameters or equivalent technical measures should be based on Best Available Techniques (BAT), without prescribing the use of a technique or specific technology, but taking into consideration the technical characteristics of the installation concerned, its geographical position and local environmental conditions.

• (24) ... the public should have access to information on the operation of the plants and their potential effects on the environment ...

• BAT, where to find it:Decrees of the Ministry of Environment:31.01.2005 DM (for the activities 1.3, 2.1, 2.2, 2.3, 2.4, 2.5 and 6.1);01.29.2007 DM (for the activity 1.2);01.29.2007 DM (for the activities 3.3, 3.4 and 3.5); in OJ of 31.05.07DM 29/01/2007 (for activities 6.4a, 6.5 and 6.6);01.29.2007 DM (for the activities 5.1, 5.2, 5.3); in OJ of 07.06.0710.01.2008 DM (for the activities 1.1, 2.6, 4.1, 4.2, 6.4) in OJ of 03.03.09

• Website European Integrated Pollution Prevention and Control Bureau (http://eippcb.jrc.es/reference)

Page 23: IPPC Directive: the Integrated Environmental Authorization (IEA)

2323

see DM on 01/10/2008 G.U.R.I. 12/02/2009

1. Principle of the integrated approach: ... take into account the so-called cross-media effects is an essential step to prevent and control in a coordinated manner the various forms of pollution.

2. Compliance with environmental quality standards and LAWS: the IEA (AIA) must, however, operate in an environment of compliance with environmental quality regulations ...

3. General principles of Article. 3, paragraph 1 of Legislative Decree no. 59/05: general principles to be taken into account in determining the conditions for the EIA (AIA):a) appropriate measures must be taken to prevent pollution, in particular by applying best available techniques;b) there must be no significant pollution events;c) should be avoided the production of waste, where possible;d) the energy must be used efficiently;e) the necessary measures to prevent accidents shall be taken and limit their consequences;f) must be avoided any risk of pollution upon definitive cessation of activities and the site restored in accordance with current regulations relating to land reclamation and environmental restoration.

The "philosophy" of the IEA (AIA)

Page 24: IPPC Directive: the Integrated Environmental Authorization (IEA)

Announcement publication

By 15 days

Check completeness +

Communication of

startup procedure

By 30 days

Submission of this

application (IEA)

T=0

Presentation of

observations

By 30 days

Conference of the services + requests

for additions

By 60 days

Issue of IEA(AIA)

By 150 days from submission of application

(+30 days in case of requests

for additions at the Conference of the

services)

2424

The procedure for IEA (AIA) granting (issue)(Article 29-ter, paragraph 4 and Art. 29-c Leg. 152/06)

Any request additions(submission deadline 30 days max) (time block)

Possible acquisition integrations(submission deadline 90 days max) (time block)

First document review, which is analogous to

the verification of admissibility

applications for ”VIA “(see art. 23 TUA)

Please note that in case of non-submission, the instance is retreated

Publication also on the website of the competent authority

Reintroduced the

obligation of the

Conference of the services

Eliminated the prediction

on the application of power of Government

replacement in case administration inertia

Note: the changes of Legislative Decree no. 59/05 are painted in green

Page 25: IPPC Directive: the Integrated Environmental Authorization (IEA)

2525

The renewal and review of the AIA (Art. 29-8 Leg. 152/06)

4 cases:Plants Length

1. Plants that have not been certified ISO 14001 or EMAS registered 5 years

2. Plants certified ISO 14001 6 years

3. Plants registered EMAS (Environmental management and audit scheme) 8 years

4. Plants referred in paragraph 6.6 of Annex VIII (plants for the intensive rearing of poultry or pigs)

10 years

New third

corrective

lawNotes:submission of application for renewal at least 6 months before the deadline (see art.29-8, paragraph 1) [in any case is provided that "Until the decision of the competent authority, the operator continues the activity based on prior authorization "];

If certain conditions are met (i.e. if pollution caused by the plant is such that the existing limit values must be changed, or enter new limits in the permit), review of the permit is made at any time by the competent authority.

Page 26: IPPC Directive: the Integrated Environmental Authorization (IEA)

The regional law on IEA(AIA)

Page 27: IPPC Directive: the Integrated Environmental Authorization (IEA)

2727

The DGRV 668/07: two case studies

Activities for which BAT are available and identified by Decree of

the Ministry of Environment(DM 31.01.2001)

Activities for which BAT are not available and not identified by

Decree of the Ministry of Environment

Request accompanied by general information only(points A1, A2, A3, A6, A8 and A9)

+ Copies of permits that already exists

IEA (AIA) final issueIEA (AIA) temporary issue

Request with allmodules attached to

DGRV 688 of 20.03.2007

Page 28: IPPC Directive: the Integrated Environmental Authorization (IEA)

Final IEA (AIA) release in the Veneto region

Page 29: IPPC Directive: the Integrated Environmental Authorization (IEA)

2929

The DGRV 668/07: the required documentation

FORM A - GENERAL INFORMATION

FORM B - DATA AND CURRENT NEWS on the plant

FORM C - DATA AND NEWS TO AUTHORIZE the plant

FORM D - IDENTIFICATION OF THE PROPOSED PLANT AND ENVIRONMENTAL EFFECTS

FORM E - MANAGEMENT OF ENVIRONMENTAL ASPECTS and MONITORING PLAN

NON TECHNICAL SUMMARY+

ATTACHED TO VARIOUS FORMS

Same forms for the plants in national IEA (AIA)

Page 30: IPPC Directive: the Integrated Environmental Authorization (IEA)

3030

Form A:Form A:

3030

The DGRV 668/07: the required documentation

Page 31: IPPC Directive: the Integrated Environmental Authorization (IEA)

3131

Form A:Form A:

3131

The DGRV 668/07: the required documentation

ACCETTAZIONE RIFIUTI(ACC_RIF)

STOCCAGGIO RIFIUTI(STO_RIF)

ENERGIAELETTRICA

RIF

IUT

IR

IFIU

TI

RIF

IUT

IR

IFIU

TI

SCARICO RIFIUTI(SCA_RIF)

GASOLIO RIFIUTIPRODOTTI

CARICO RIFIUTI PER SMALTIMENTO

IMPIANTI DESTINO FINALE (CAR_RIF)

GASOLIO RIFIUTIPRODOTTI

IMPIANTO DI DEPURAZIONE INTERNO (DEP_ACQ)

SMALTIMENTO TRAMITE DITTA AUTORIZZATA (SMA_ACQ)

ACQUE METEORICHE PLATEE

ACQUE DILAVAMENTO PLATEE IN CASO DI SVERSAMENTI ACCIDENTALI DI RIFIUTI

SCARICO IN FOGNATURA

300 t

1,5 t/ a

120 MWh

SM

ALT

IMEN

TO

1,5 t/ a

ATTIVITÀ IPPC

ATTIVITÀ TECNICAMENTE CONNESSE

(1)

(1)

RIFIUTI DA MANUTENZIONE MEZZI INTERNI (GESTITI DA DITTE FORNITRICI)

(1)

6800 mc/ aRIFIUTIPRODOTTI

(2)

RIFIUTI DA MANUTENZIONE ORDINARIA DELLE STRUTTURE DI STOCCAGGIO

(2)

SOL.UZIONEFANGOSA

120 t/ a

Page 32: IPPC Directive: the Integrated Environmental Authorization (IEA)

The DGRV 668/07: the required documentation

3232

Form B:Form B:

3232

Evaluation of the amount of pollutant released

Page 33: IPPC Directive: the Integrated Environmental Authorization (IEA)

3333

Form D:Form D:Report prepared by using models of atmospheric dispersion of pollutants

The DGRV 668/07: the required documentation

Page 34: IPPC Directive: the Integrated Environmental Authorization (IEA)

3434

May require the use of dispersion models of the noise

Form D:Form D:

The DGRV 668/07: the required documentation

Page 35: IPPC Directive: the Integrated Environmental Authorization (IEA)

3535

How to manage the significant environmental aspects for which adjustments will be made (i.e. landscape)

Form E:Form E:

The DGRV 668/07: the required documentation

Page 36: IPPC Directive: the Integrated Environmental Authorization (IEA)

3636

The DGRV 242/10: operational guidance on the PMC (monitoring and control plan) in waste management plants

L.R. 3/2000, art. 26

PC (control programm)D.Lgs. 36/2003

PSC (supervision plan and control)

D.lgs. 152/06, Parte 2^

PMC (monitoring plan and control)

Page 37: IPPC Directive: the Integrated Environmental Authorization (IEA)

Cases:

Plants for which should be available 2 tools for monitoring and control

The DGRV 242/10 is considered appropriate to prepare a single document (as defined for administrative

simplicity PMC) which must therefore include procedures and criteria established by

Law R. 3/2000 as well as content provided by D. DecreeNo 59/2005

The DGRV 242/10: operational guidance on the PMC (monitoring and control plan) in waste management plants

Page 38: IPPC Directive: the Integrated Environmental Authorization (IEA)

3838

Annual report

• The Annual Report is a direct consequence of the provisions in the Plan Monitoring and Control (PMC) in the permit IEA (AIA).

• The Legislative Decree 152/06 provides that the data needed to verify compliance with the conditions provided for in the AIA must be communicated to the Competent Authority, with frequencies and mode defined in the Integrated Environmental itself.

• The annual report, in its general form, valid for all activities listed in Annex VIII of Part II of Legislative Decree 152/06 and subsequent amendments, consists of an excel file and a brief commentary on the relationship of the reported data. The excel file contains a set of tables suitable to accommodate the data provided in the plan of self-monitoring and control.

See http://ippc.arpa.veneto.it/index.php?id=report

Page 39: IPPC Directive: the Integrated Environmental Authorization (IEA)

3939

Simplifications for ISO 14001/EMAS

There are opportunities to simplify for companies already certified to ISO14001

or EMAS (Eco management and audit scheme)

Possibility of using part of the documentation already available to prepare the attachments

to forms

Page 40: IPPC Directive: the Integrated Environmental Authorization (IEA)

4040

Simplifications for ISO 14001/EMAS

There are opportunities to simplify for companies already certified to ISO14001

or EMAS (Eco management and audit scheme)

Possibility of using part of the documentation already available to prepare the attachments

to forms

An example

Page 41: IPPC Directive: the Integrated Environmental Authorization (IEA)

4141

Regional law 26/07

Distribution of responsibilities for the issue of IEA (AIA) between the Region and Province:

1. Energy activities4. Chemical industry(except 4.1, letters j and k)

5. Waste management(excluding hazardous

waste recovery - operations R5, R6, R8 and R9 - and landfills for inert waste and

urban)

6. other activities(limited to: 6.5 - removal / recovery

of carcasses)

2. Metals3. Mineral products

4. Chemical industry (activity 4.1, letters j and k)

5. Waste management(recovery of hazardous waste - operation R5,

R6, R8 and R9 - and landfills for inert waste and urban)

6. other activities(all except 6.5 - removal / recovery

of carcasses)

Page 42: IPPC Directive: the Integrated Environmental Authorization (IEA)

4242

No procedural rule for facilities No procedural rule for facilities where these activities are where these activities are simultaneously simultaneously subject subject

to a regional jurisdiction IEA to a regional jurisdiction IEA (AIA)(AIA) and provincial jurisdiction IEA and provincial jurisdiction IEA (AIA)(AIA)

Regional law 26/07

Page 43: IPPC Directive: the Integrated Environmental Authorization (IEA)

4343

Skills for IEA (AIA) Release

It is available on the website of ARPAV an excel file that indicates, for each type of system, the

competence to issue the IEA (AIA)(v. http://ippc.arpa.veneto.it/index.php?id=autorit_competente_ippc):(v. http://ippc.arpa.veneto.it/index.php?id=autorit_competente_ippc):

Page 44: IPPC Directive: the Integrated Environmental Authorization (IEA)

4444

The DGRV 1519 of 26/05/09:the payment of preliminary expenses

4444

Key elements to be considered:Key elements to be considered:•method of determining the number of emissions and pollutants

•calculating the final price considering the coefficient K1 (0.70)

•obligation to attach to the payment receipt, a scheme that quantifies, for each coefficient of the unbundled rate, the amount paid by

the Company on the same

Costo istruttorio (500-2.500 €)

Riduzione certific. ambient. (10-25% subtot)

Riduzione mod. present. dom.

(fino a 1.500 €)

Clima acustico

Tutela Risorsa idrica

Odori

AIA stat. Sicurezza Territorio

Ripristino Ambientale

Page 45: IPPC Directive: the Integrated Environmental Authorization (IEA)

4545

La DGRV 1519 del 26/05/09:the payment of costs of controls

Page 46: IPPC Directive: the Integrated Environmental Authorization (IEA)

4646

Integrated environmental inspections: first experiences in Veneto

La DGRV 1519 del 26/05/09:the payment of costs of controls

Page 47: IPPC Directive: the Integrated Environmental Authorization (IEA)

4747

Examples of plant followed by eAmbiente

Customer ALTO VICENTINO SERVIZI spa

Type of serviceAssistenza in fase di rilascio dell’Autorizzazione Integrata Ambientale (IPPC) per impianto di depurazione acque reflue e smaltimento rifiuti liquidi di Thiene (VI)

Period 2009-10

Customer AIM BONIFICHE VICENZA srl

Type of serviceAssistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per impianto di smaltimento rifiuti di Venezia Marghera

Period 2007

Customer CARTIERE CARIOLARO

Type of serviceAssistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per le cartiere di Camignano di Brenta e S. Pietro in Gu (PD)

Period 2007

Page 48: IPPC Directive: the Integrated Environmental Authorization (IEA)

4848

Examples of plant followed by eAmbiente

Customer CEMENTIZILLO

Type of serviceAssistenza in fase di predisposizione delle integrazioni per il rilascio dell’Autorizzazione Integrata Ambientale (IPPC) del cementificio di Fanna (PN)

Period 2008

Customer CEREAL DOCKS SPA

Type of service

Assistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per l'impianto di lavorazione materie prime vegetali di Camisano Vicentino (VI)

Period 2007

Customer ETRA SpA

Type of service

Assistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per impianti di smaltimento rifiuti liquidi di Carmignano di Brenta, Limena, Selvazzano e Rubano (PD)

Period 2007

0

500.000

1.000.000

1.500.000

2.000.000

2.500.000

3.000.000

3.500.000

4.000.000

4.500.000

2005 2006 2007

kg

CER 19 08 01 "Vaglio" CER 19 08 05 "Fanghi"CER 19 12 12 "Sabbie" Totale

Page 49: IPPC Directive: the Integrated Environmental Authorization (IEA)

4949

Examples of plant followed by eAmbienteCustomer FASSA SpA

Type of service

Assistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per l'impianto di produzione di calce di Spresiano (TV)

Period 2007

Customer ITALIA ZUCCHERI

Type of serviceAssistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per lo zuccherificio di Pontelongo (PD)

Period 2009

Customer FONDERIA ANSELMI SpA

Type of serviceAssistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per la fonderia di Camposampiero (PD)

Period 2007

Customer SESA S.p.a.

Type of serviceAssistenza in fase di predisposizione della documentazione necessaria alla richiesta dell’Autorizzazione Integrata Ambientale (IPPC) per la discarica di Este (PD)

Period 2007

Page 50: IPPC Directive: the Integrated Environmental Authorization (IEA)

5050

The new IPPC DirectiveThe new IPPC Directive

• Approved (by the European Parliament in 2 ^ reading), on 07/07/2010, the directive on emissions which goes to update and bring together seven different Directives including Directive 2008/1/EC (IPPC).

• The Directive sets stricter limits in 2016 for emissions of nitrogen oxides, sulfur dioxide and dust. These limits, however, could not be applied to plants to cease all activities in 2023, or 17,500 hours of work after 2016.

• The new power plants and energy will have to comply with the new rules by 2012, but there was an agreement on the possibility for Member States to use national plans for a number of transient combustion plants, including fossil fuels, and so you have until July 2020 to comply with new rules.

V. Text on http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//TEXT+TA+P7-TA-2010-0267+0+DOC+XML+V0//IT&language=IT#BKMD-4

Page 51: IPPC Directive: the Integrated Environmental Authorization (IEA)

5151

Thank you for your attention

Dr. Federico BalzaneAmbiente Srl

e-mail [email protected]