34
Fair Hyams Director of Sales and Client Service Bennett Marine, Inc Ken Williams President The Gartner Group

Ibbi 2011 draft 2

Embed Size (px)

DESCRIPTION

Presentation to IBBI on March 9, 2011

Citation preview

Page 1: Ibbi 2011   draft 2

Fair HyamsDirector of Sales and Client ServicesBennett Marine, Inc

Ken WilliamsPresidentThe Gartner Group

Page 2: Ibbi 2011   draft 2

Cajun

Page 3: Ibbi 2011   draft 2
Page 4: Ibbi 2011   draft 2
Page 5: Ibbi 2011   draft 2

Who we are

Page 6: Ibbi 2011   draft 2

Who we areHow we are different

Page 7: Ibbi 2011   draft 2

Who we areHow we are differentBennett Advantage

Page 8: Ibbi 2011   draft 2

Page one

1960

2004

2007

1966

1973

1984

Page 9: Ibbi 2011   draft 2

Page one

The Power of The Power of HydraulicsHydraulics

•Precision•Power•Reliability

Page 10: Ibbi 2011   draft 2

J.D. Power and AssociatesCustomer Satisfaction

Page 11: Ibbi 2011   draft 2

10=Satisfaction = Sales94%

79%

47%

22%

3%

84%

59%

31%

12%

4% 3%

9%

0%

25%

50%

75%

100%

10 9 8 7 6 5

% D

ef.

Wo

uld

Recommend Boat Manufacturer Repurchase from Boat Manufacturer

Page 12: Ibbi 2011   draft 2

Trim Tab Failure Rates.

Surveyed•3,049 respondents with Trim Tabs•Boaters registered a problem with trim tabs--Not working Properly

0.8

1.8

0 1 2 3 4 5

Bennett

Lenco

Page 13: Ibbi 2011   draft 2

J.D. Power Multi-Year Study

What happens after 1 year?

1,922 qualified surveys were completed (boats with trim tabs)

Page 14: Ibbi 2011   draft 2

Top Line FindingsRequired Repairs - 5 Years

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

20022003200420052006

Bennett

Electric

Page 15: Ibbi 2011   draft 2
Page 16: Ibbi 2011   draft 2
Page 17: Ibbi 2011   draft 2
Page 18: Ibbi 2011   draft 2

Page one

Basic SystemBasic System

Page 19: Ibbi 2011   draft 2

Page one

Enhanced SystemEnhanced System

Page 20: Ibbi 2011   draft 2

Auto Tab ControlAuto Tab Control

Page 21: Ibbi 2011   draft 2

New Dual Purpose New Dual Purpose PumpPump

Page 22: Ibbi 2011   draft 2
Page 23: Ibbi 2011   draft 2
Page 24: Ibbi 2011   draft 2

Page one

New Premier LineNew Premier Line

SST: 50’- 120’SST: 50’- 120’

Page 25: Ibbi 2011   draft 2

Page one

New Premier LineNew Premier Line

BXT: 35’- 60’BXT: 35’- 60’

Page 26: Ibbi 2011   draft 2

Page one

Installation ChallengeInstallation ChallengeMeet or surpass the installation of electric trim tabs without compromising the durability and serviceability of hydraulics.

…without a significant cost increase.

Page 27: Ibbi 2011   draft 2

Page one

New Sealed HPUNew Sealed HPUQuick-Connect Fittings

Pre-Filled Reservoir

Self-Bleeding System

Page 28: Ibbi 2011   draft 2

1. Pre-assembled Lower Hinge2. 2 screws, no washers, no nuts

Actuator Assembly

Page 29: Ibbi 2011   draft 2

Upper Hinge

1. Drill four holes in transom2. Run actuator wire through bracket, rubber seal

and then transom3. Apply 5200 to wires and screw holes4. Pull wire through transom5. Mount bracket with enclosed screws6. Re-attach bracket to actuator – bolt, washer,

nut

1. Drill four holes2. Push tubing through3. Apply 5200 & mount hinge

Page 30: Ibbi 2011   draft 2

New Pre-Connected Actuators

Running Wire or Tubing

Assemble DeutschConnectors

Page 31: Ibbi 2011   draft 2
Page 32: Ibbi 2011   draft 2

Page one

Price StabilityPrice Stability

Average IBBI Pricing for Past 10 Years

$0.00

$50.00

$100.00

$150.00

$200.00

$250.00

2005Total

2006Total

2007Total

2008Total

2009Total

2010Total

Page 33: Ibbi 2011   draft 2

Page one

IBBI ProposalIBBI Proposal•1% Prompt Pay•2% IBBI Contribution•5 Year Warranty •Guaranteed Lowest Prices•Guaranteed Satisfaction

•5% Engineering Discount

Page 34: Ibbi 2011   draft 2

Page one