HOW TO REDUCE COST HOW TO REDUCE COST & SECURITY RISK WHILE & SECURITY RISK WHILE GROWING YOUR GROWING YOUR SUPPLY CHAINSUPPLY CHAIN
AGENDA
Craig Livingston CEO, Arena Solutions
Ranjan Prasad VP Operations & Supply Chain: SunLink Corporation
Bradley Persson Senior Document Control Manager, Switch Lighting
Steve Chalgren VP Product Management & Strategy, Arena Solutions
IW Moderator Q&A MC with speakers
Ranjan Prasad Ranjan Prasad VP Operations & Supply ChainVP Operations & Supply Chain
SunLink is an integrated balance of system provider.
About SunLink
Our Experience: Typical startup challenges
• Weak intellectual property controls Proprietary drawings floating around on personal
computers Poor change management
• Collaboration was difficult
• Limited resources
• Need for velocity
Our Experience: Typical startup challenges
• Cost, quality and delivery issues
• Material supply shortages
• Logistics disruptions
• Supplier failures
• Legal issues
SunLink’s Supply Chain Excellence
Doc Mgt System Supplier Portal
Suppliers
Transportation Mgt System
• Advance Ship Notice• Shipping Doc• Packing Slip• Invoice
• Sales Order• Project Info• Need by Date• Engineering Info
• Purchase Order• Bill of Material• Logistics Info• Accounting
• Project Layout• Engineering Info
• Part Drawings• Bill of Material• Eng. Change Order
• Purchase Order• Shipping Doc• Packing Label• Invoice
CRM ERP CAD
Lessons Learned
Prioritize process before tools
Take security off the table
Appreciate the power of postponement
Collaborate, collaborate, collaborate
Establish an enterprise-like supply chain
Dedicate resources to innovation
Eliminate opportunities for errors
Emphasize reliability and repeatability
Bradley PerssonBradley PerssonSenior Document Control Manager Senior Document Control Manager
Switch Lighting
• LED Lighting Switch40We, Swithch60we,
Switch75we, Switch100Weo Commercial & Residentialo 3-Way Bulbo Japan Bulb
Product 2 o Designed for retail stores
Distributed Need for Product Data
• Collaborative access to product data
• Across extended teams all over the world Switch has a distributed PLM user base
o Internal Switch Userso Supplier Userso Contract Manufacturing / Production Users
Security Needs Change with Product Cycle
• Challenges for securing product data Switch product data security evolved as we evolved
o Early on in R & D mode- Partner Relationships
- Approval & User Access Requirements
o NPI Mode- Multiple Suppliers
- More Users / More Approval Requirements
o Production Mode- Multiple Product lines
- Multiple Lifecycles
- Supplier Relationships / Access & Switch IP
Decided on PLM: Cloud or On Premise?
• Cloud vs. on premises PLM systems IT hassles and considerations for on Prem PLM
o Firewallo Dealing with ITo VPNo Configurationo Verification
Decided on PLM: Cloud or On Premise?
• Cloud vs. on premises PLM systems Advantages & considerations for Cloud PLM
o Simplicityo Configuration by PLM Administration vs. ITo On-Boarding and Accessing Suppliers &
Distributed Userso Pay as you go modelo Fast and secure User management
Benefits from PLM
• PLM has many benefits For Hi-Tech Hardware company's like ours
o Early stage benefits include:- Managing development and prototypes
stages- Item numbering & BOM management- Material cost & quote management- AVL development- Document vaulting / depository
o NPI & Production stage benefits include:- Document control & Change
management- Capturing product review & decision
history- Document release & approved supplier
list control- Single source of the truth
Steve ChalgrenSteve ChalgrenVP Product Management & StrategyVP Product Management & Strategy
Requirements for Manufacturing Supply Chain Excellence
• Deliver products High quality On-time delivery The right quantities At the lowest possible cost
• Supply chain of excellence Requires product lifecycle management Collaborative access 24/7 anywhere in the world Secure Needs vary at different product lifecycles
• Need a system that will scale with you (up or down)
How do you Securely Grow your Supply Chain?
• Look at your collaboration processes
• Look at the logistics of product data movements
• Map out your security
• Find the weak spots
• Shoot for quick wins
• Remember we live in a real world
Three Goals of Implementing Product Lifecycle Management for your Supply Chain
• Solve Problems with your entire supply chain
• Electronic approvals
• Easy Access
• Solve Problems with your entire supply chain
• Electronic approvals
• Easy Access
• Protect your IP!
• Users should only see what they need to see
• Easy to manage
• Protect your IP!
• Users should only see what they need to see
• Easy to manage
• 24/7 availability
• Fast access to data: single click approvals
• Easy to learn and use
• 24/7 availability
• Fast access to data: single click approvals
• Easy to learn and use
Collaboration Security Speed
Typical Problems You May Find
• Email or regular phone calls
• Problems partners discover are not always communicated
• Product changes are sent inconsistently
• Forward visibility into product changes is inconsistent
• Supplier Access to Product Data is via email/FTP package a Document Control Manager builds manually
• Lots of ad-hoc processes
• Quality issues pile up
• Email or regular phone calls
• Problems partners discover are not always communicated
• Product changes are sent inconsistently
• Forward visibility into product changes is inconsistent
• Supplier Access to Product Data is via email/FTP package a Document Control Manager builds manually
• Lots of ad-hoc processes
• Quality issues pile up
• FTP
• VPN access for suppliers
• Limited / difficult access audit trail
• Difficult to manage over time enables suppliers to have access to designs and plans unrelated to their parts
• Disconnected data
• Product data easily stolen
• FTP
• VPN access for suppliers
• Limited / difficult access audit trail
• Difficult to manage over time enables suppliers to have access to designs and plans unrelated to their parts
• Disconnected data
• Product data easily stolen
• Email build and change packages take time to create.
• Need to decide where to send it – sits on desk
• Email build and change packages take time to unpack and understand
• Changes require the above loop to repeat
• Frequent ad hoc requests for information go unanswered until the office opens the next day
• Exporting the latest BOM requires engineering assistance
• Long delays due documentation
• Email build and change packages take time to create.
• Need to decide where to send it – sits on desk
• Email build and change packages take time to unpack and understand
• Changes require the above loop to repeat
• Frequent ad hoc requests for information go unanswered until the office opens the next day
• Exporting the latest BOM requires engineering assistance
• Long delays due documentation
Collaboration Security Speed
Typical Problems You May Find
• Email or regular phone calls• Problems partners discover
are not always communicated• Product changes are sent
inconsistently• Forward visibility into product
changes is inconsistent• Supplier Access to Product
Data is via email/FTP package a Document Control Manager builds manually
• Lots of ad-hoc processes• Quality issues pile up
• Email or regular phone calls• Problems partners discover
are not always communicated• Product changes are sent
inconsistently• Forward visibility into product
changes is inconsistent• Supplier Access to Product
Data is via email/FTP package a Document Control Manager builds manually
• Lots of ad-hoc processes• Quality issues pile up
• Email• FTP• VPN access for suppliers• Limited / difficult access audit
trail• Difficult to manage over time
enables suppliers to have access to designs and plans unrelated to their parts
• Disconnected data• Product data easily stolen
• Email• FTP• VPN access for suppliers• Limited / difficult access audit
trail• Difficult to manage over time
enables suppliers to have access to designs and plans unrelated to their parts
• Disconnected data• Product data easily stolen
• Email build and change packages take time to create.
• Need to decide where to send it – sits on desk
• Email build and change packages take time to unpack and understand
• Changes require the above loop to repeat
• Frequent ad hoc requests for information go unanswered until the office opens the next day
• Exporting the latest BOM requires engineering assistance
• Long delays due documentation
• Email build and change packages take time to create.
• Need to decide where to send it – sits on desk
• Email build and change packages take time to unpack and understand
• Changes require the above loop to repeat
• Frequent ad hoc requests for information go unanswered until the office opens the next day
• Exporting the latest BOM requires engineering assistance
• Long delays due documentation
Collaboration Security Speed
Typical Supply Chain Improvements with ProductLifecycle Management
• Supply Chain are members of the change control (ECO Approval) board
• Partners can initiate the change process (ECR / quality issues)
• Product changes are sent in a consistent, easy to read format
• Forward visibility in to product changes is routine
• Supplier Access to Product Data is the PLM system 24/7
• Partners' manufacturing knowledge is leveraged
• Supply Chain are members of the change control (ECO Approval) board
• Partners can initiate the change process (ECR / quality issues)
• Product changes are sent in a consistent, easy to read format
• Forward visibility in to product changes is routine
• Supplier Access to Product Data is the PLM system 24/7
• Partners' manufacturing knowledge is leveraged
• Intellectual Property is controlled through PLM system
• Suppliers and employees can only access designs and change orders they need to see
• Access is controlled via easy to use Admin console
• No firewall issues
• Intellectual Property is controlled through PLM system
• Suppliers and employees can only access designs and change orders they need to see
• Access is controlled via easy to use Admin console
• No firewall issues
• Self service
• 24/7 access to data
• Ad hoc requests for information are served seamlessly
• Build and change packages are easy to build and read
• Approvals are online
• ECO – engineering change order releases are instantly available
• Self service
• 24/7 access to data
• Ad hoc requests for information are served seamlessly
• Build and change packages are easy to build and read
• Approvals are online
• ECO – engineering change order releases are instantly available
Collaboration Security Speed
Typical Supply Chain Improvements with Product Lifecycle Management
• Supply Chain are members of the change control (ECO Approval) board
• Partners can initiate the change process (ECR / quality issues)
• Product changes are sent in a consistent, easy to read format
• Forward visibility in to product changes is routine
• Supplier Access to Product Data is the PLM system 24/7
• Partners' manufacturing knowledge is leveraged
• Supply Chain are members of the change control (ECO Approval) board
• Partners can initiate the change process (ECR / quality issues)
• Product changes are sent in a consistent, easy to read format
• Forward visibility in to product changes is routine
• Supplier Access to Product Data is the PLM system 24/7
• Partners' manufacturing knowledge is leveraged
• Intellectual Property is controlled through PLM system
• Suppliers and employees can only access designs and change orders they need to see
• Access is controlled via easy to use Admin console
• No firewall issues
• Intellectual Property is controlled through PLM system
• Suppliers and employees can only access designs and change orders they need to see
• Access is controlled via easy to use Admin console
• No firewall issues
• Self service
• 24/7 access to data
• Ad hoc requests for information are served seamlessly
• Build and change packages are easy to build and read
• Approvals are online
• ECO – engineering change order releases are instantly available
• Self service
• 24/7 access to data
• Ad hoc requests for information are served seamlessly
• Build and change packages are easy to build and read
• Approvals are online
• ECO – engineering change order releases are instantly available
Collaboration Security Speed
Typical Supply Chain Benefits with Product Lifecycle Management
• Faster to market
• Faster cost reductions = higher profit margins
• Faster & lower cost product change order implementations
• Less scrap and rework
www.arenasolutions.com
866.937.1438
Questions?