2. Plan Escalon to escalate out of poverty
3. Escalon kids breaking cycle of poverty
Remote Rural Villages:
distributing rice, beans, de-parasite meds & hygiene
supplies
9. 10. 11. BEFORE:
AFTER:
59 networked systems / 3 Computer Labs
14. 15. 16. CURRENT KITCHEN:
19. 20. 21. 22. 23. Projects:
Fans1.1 ClassroomCeiling1.2 FordormroomWalls
2. Two-story Kitchen and Dining2.1 First floor Kitchen 2.2 Second
Floor Dinning
3.VolleyballCourt
24. Current Conditionin Plan Escaln with 550 youth
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
25.
The heatcanbeunbearable
29. 1.1 Industrial Ceiling Fans
Estimated Total Cost: $ 5,000
32. Dormrooms in needof ventilation
33. 1.2 Wall Fans forBedrooms
Estimated Total Cost: $ 2,800
36. Currently in thekitchen.
4,500 tortillas are made daily.
.
37. 2. Two Story BuildingKitchen & Dinning
Total project cost for building estimated at$ 105,800
38. 2.1 Drawing offirst floor - Kitchen
39. ... NecessaryKitchenUtensils
40. 2Industrial grills for tortillas
Estimatedcost$ 7,500
41. 2 Industrial Stoves for hugepots for corn and beans
EstimatedCost $ 3,500
42. 2 IndustrialStove with 4 burners for rice and others
EstimatedCost $ 3,700
43. 1 Freezer
EstimatedCost $ 1,300
44. 1 Refrigerator
EstimatedCost $ 1,300
45. 1 Stainless steel table food prep workstation
EstimatedCost $ 2,200
46. 2Stainless Steel Sinks...
EstimatedCost $ 4,000
47. Basic pots, & cooking utensils
EstimatedCost $ 1,500
48. 2.2) Second floor of the building for dining.
49. 2.) A Caged beach volleyball court.
Estimated Coast: $3,000
50. ACCESSORIESBalls
EstimatedCost $ 1,000
51. Nets and Accessories.
EstimatedCost $ 500.00
52. Stands for volley and soccer field
EstimatedCost $ 5,000
53. Participated in thisproject:
III YearComputerScience
Gerson Rodezno
Cindy Alvarado
Profa. Lourdes Salguero
Jess Sarmiento