“Green Building’s in
Governmental Projects”
Ministry of Public WorksConstruction Project Sector
MPW has emphasized in the contractual documents –TOR and RFP- the importance of implementing green and sustainable criteria (i.e. LEED and QSAS).
“Green Building in Government Projects”May 2012
Ministry of Public WorksConstruction Project Sector
The application of green and sustainable design has been initiated on a group of selected projects as a required objective.
MPW has been part of adopting and applying Green Building Concepts in its construction projects.
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
MPW has emphasized in the contractual documents –TOR and RFP- the importance of implementing green and sustainable criteria (i.e. LEED and QSAS).
The application of green and sustainable design has been initiated on a group of selected projects as a required objective.
MPW has been part of adopting and applying Green Building Concepts in its construction projects.
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
MPW will present three ongoing case studies, detailing information
related to green aspects from each case study, and explaining how
green design and technology were applied.
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Trucks' Parking Lots in Al-Jahra'a Governorate
2
Ministry of Public WorksConstruction Project Sector
May 2012
3 Terminal Two Kuwait International Airport
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Six Ring Road
Ministries Zone
Jaber Al-Sabah Hospital
AL-Shuhada
AL-Zahra
Sahara Golf & Country Club
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Ministry of Electricity & Water
Ministry of Public Works
Public Authority for housing Welfare
Zakat House
The Public Authority for Civil
info.
The Public Services company
AL-Zahra AL-Shuhada
Site Area 4,760 m2
Built-up Area 33,000 m2
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Ministry of Electricity & Water
Ministry of Public Works
Public Authority for housing Welfare
Zakat House
The Public Authority for Civil
info.
The Public Services company
AL-Zahra AL-Shuhada
Site Area 4,760 m2
Built-up Area 33,000 m2
Consultant: Alia Al-Sayegh Cons.
Stage: Design Phase.
Construction Date: Aug. 2013
Exportation for Public Welfare Dept.
BOT Department: - Administration offices
Supporting facilities for the 2 Dept.
“3 Basements+ Ground+ 9 Floors”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Terms Of Reference Addendum
QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
567
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
1Site “9%”
Energy “18”
Water “16%”
Management and Operations “8%”
URBAN Connectivity “14%”
234
8
Material“8%”
Indoor Environment “14%”
Cultural and Economic Value “13%”
2
QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
567
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
1Site “9%”
Energy “18”
Water “16%”
Management and Operations “8%”
URBAN Connectivity “14%”
34
8
Material“8%”
Indoor Environment “14%”
Cultural and Economic Value “13%”
External Lighting “Stand-Alone”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System1 Using Solar Panels for :
Supply Electricity “Saving 9%”
External Lighting “Stand-Alone”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System1 Using Solar Panels for :
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System
Supply Electricity “Saving 9%”
External Lighting “Stand-Alone”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System1 Using Solar Panels for :
2 LED is used for complete lighting fixtures of the building
Supply Electricity “Saving 9%”
External Lighting “Stand-Alone”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Ministry of Public WorksConstruction Project Sector
May 2012
Energy “18%”
3
Energy Demand Performance
Electrical System
3
1 Using Solar Panels for :
2 LED is used for complete lighting fixtures of the building
A full Building Management System (BMS) is applied.
Supply Electricity “Saving 9%”
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Trucks' Parking Lots in Al-Jahra'a Governorate
2
Ministry of Public WorksConstruction Project Sector
May 2012
3 Terminal Two Kuwait International Airport
Trucks' Parking Lots in Al-Jahra'a Governorate
2
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
West Abdally Road Location East Abdally
Road Location
Abdally Road
Site Area 500,000 m2
“Each”
Al-Salmy Road Al-Salmy Road Location
Trucks parking (2000 parking spaces min.)
Service center (3000 m2) :
- Administration offices
Mechanical and Electrical workshop
Trucks Weight station
Truck-Wash facilities
Supportive facilities
Al-Salmy Road Location
West Abdally Road Location East Abdally
Road Location
2
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
Request for Proposal
Renewable Energy
Stage: Construction Phase
Type: Design / Build.Construction Finish Date: March 2014
21
Solar Panels and Shading
Clean Green Energy System1.1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
21
Solar Panels and Shading
Clean Green Energy System1.1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
Wind Turbines “backup electrical power”
21
Solar Panels and Shading
Clean Green Energy System1.11.2
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
Wind Turbines “backup electrical power”
21
Solar Panels and Shading
LED Fixture
Clean Green Energy System1.11.2
1.3
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
Wind Turbines “backup electrical power”
21
Solar Panels and Shading
LED Fixture
Clean Green Energy System1.11.2
1.3
1.4
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
Stand-Alone Street Light
Wind Turbines “backup electrical power”
21
Power Sockets (15%) “Trailer Refrigeration Unit”
Solar Panels and Shading
LED Fixture
Clean Green Energy System1.11.2
1.3
1.4
2.1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
2 Energy Conservation
Stand-Alone Street Light
Wind Turbines “backup electrical power”
21
Power Sockets (15%) “Trailer Refrigeration Unit”
Solar Panels and Shading
LED Fixture
Clean Green Energy System1.11.2
1.3
1.4
2.1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Trucks' Parking Lots in Al-Jahra'a Governorate
2 Energy Conservation
3 Treated Water for Irrigation “Storm Water Tank”
Stand-Alone Street Light
“Green Building in Government Projects”
1Exportation for Public Welfare (EPWD) and Build Operate and Transfer Agency (BOT)
Trucks' Parking Lots in Al-Jahra'a Governorate
2
Ministry of Public WorksConstruction Project Sector
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3
Fifth Ring Road
Fourth Ring Road
Six Ring Road
Sabhan Industrial Area
South Surrah
Abdullah AL-Mubarak
AL-FarwaniyahGovernment
Capital City
HwallyGovernment
New Terminal
Mubarak AL-Kabeer
Government
Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3
Fifth Ring Road
Fourth Ring Road
Six Ring Road
South Surrah
Abdullah AL-Mubarak
AL-FarwaniyahGovernment
Capital City
HwallyGovernment
Site Area 6.8 km2
Built up Area 670,000 m2
Mubarak AL-Kabeer
Government
Sabhan Industrial Area
New Terminal
Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3
Consultant: Foster + Partners in Association with Gulf Cons.
Stage: Design Phase.
Construction Date: Sept. 2013
Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
The New Terminal will initially accommodate 13 MAP
with the opportunity to increase it to 25 MAP.
The layout of the airport is generated to
accommodate 35 flexible contact stands.
- 4,500 min. car parking for arrivals and departure .
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
6
1
* Renovation Design and Regional Priority
Water Efficiency
Energy and Atmosphere
Indoor Environment
Material and Resource
Sustainable Site2345
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
6
1
* Renovation Design and Regional Priority
Water Efficiency
Energy and Atmosphere
Indoor Environment
Material and Resource
Sustainable Site2345
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Sustainable Site1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Site Development 1
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
80% coverage60% coverage40% coverage20% coverage
Oasis100% coverage
Native Planting Zone Oasis Bridge Gardens
Bridge GardensTerraced gardens and water features
Native Planting Zone
Sustainable Site1
1Site Development
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Buses
Car Park
Buses
Metro
Pedestrian Link
Sustainable Site1
Alternative Transportation 23 Terminal Two Kuwait International Airport
Heat Island Effect “Non-Roof”
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
100% Parking Covered“Green Roof”
Sustainable Site1
3
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
6
1
* Renovation Design and Regional Priority
Water Efficiency
Energy and Atmosphere
Indoor Environment
Material and Resource
Sustainable Site2345
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
18 Treatment plant Distributed
Water Efficiency2
Used Processed Water
Reused Processed Water16%
84%
3 Terminal Two Kuwait International Airport
Water Efficient Landscaping 31
6
1
* Renovation Design and Regional Priority
Water Efficiency
Energy and Atmosphere
Indoor Environment
Material and Resource
Sustainable Site2345
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
1 Day Light
2
3 Indoor Lighting
Photovoltaic System
3 Terminal Two Kuwait International Airport
Optimize Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
1 Day Light
3 Terminal Two Kuwait International Airport
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3 3 Terminal Two Kuwait International Airport
Energy Performance 1
1
Increase glazing to equivalent of LEED requirements with coordinate of cooling system
Day Light
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
1 Day Light
3 Terminal Two Kuwait International Airport
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
1 Day Light
3 Terminal Two Kuwait International Airport
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
2 Photovoltaic System
11% renewable energy from solar thermal and Photovoltaic Panels. Approx. 25.3GWh per annum generated from PV panels.
3 Terminal Two Kuwait International Airport
Substantial use of photo voltaic arrays (PV) to generate electricity, thus reduce the demand for Grid power.
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
2 Photovoltaic System
Total PV Area200,000 sqm
3 Terminal Two Kuwait International Airport
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
Energy and Atmosphere3
Lighting Solution
Baggage hall lighting mix of fluorescent and LED high bay luminaires.
Reduce building energy consumption by at least 16% of energy needed for the light use
3 Terminal Two Kuwait International Airport
Energy Performance 1
Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects”
May 2012
From three presented case studies, State of Kuwait government
represented by MPW had the decision of implementing sustainable
and green energy criteria into governmental projects by using any
approved measuring system such as LEED or QSAS.