TAKE THE SPACE OUT OF PARKING.
CUSTOMIZED PARKING SOLUTIONS
ABOUT CITYLIFTDesign, manufacture, install, and service automated parking systemsDeveloper DNA as executive team and partners have completed over 35MM SF of vertical development or construction in the past 15 yearsOffices in Oakland, Los Angeles, Chicago, Miami, and Boston31 projects currently underway throughout the US with more than 1,500 spacesOver 58,000 spaces installed and 26+ years experience in 13 countries.5 different, fully customizable solutions, from semi-automated puzzle systems to fully automated tower and aisle systems
#
WHY AUTOMATED PARKING?Maximize use of spaceReduce construction costsReallocate space to higher value usesImprove marketabilityIncrease capacityIncrease operating incomeLower investment expenseMaximize overall returnCapture accelerated depreciation benefitKeep cars safeReduce auto emissionsReduce use of concreteEtc.
#
PUZZLE
PROVEN TECHNOLOGY25+ years old38,000+ spaces installed by City Lift's manufacturing partnerHighly reliable
FEATURESIndependent access to each car 2,3,4,5-level optionsIndoor/Outdoor Single row or tandemAbove ground or in a pitQuick retrievalQuietFrame doubles as building structureEV charging option available
#
PUZZLE
3-LEVEL TANDEM PUZZLE
3-LEVEL PUZZLE3-LEVEL PIT PUZZLE2-LEVEL PUZZLE4-LEVEL PUZZLE5-LEVEL PUZZLE
#
TOWER
FOR NARROW SPACESFully automated parking systemStand alone or part of new structure
FEATURESUp to 20 levels2-3 minute retrieval timeEV charging option availableFully customizable exterior
#
AISLE
FOR LARGER PROJECTSFully automated parking systemAbove or below groundSuitable for high density parking
FEATURESUp to 7 levels2-3 minute retrieval timeEV charging option availableFits above, below, between, or behind other structures
#
STAR TOWER
27-17 42nd RDLONG ISLAND CITY, NY 11101
#
25-STORY HIGH RISE RESIDENTIALCOMPLETION DATE: Q4 2017TYPE OF SYSTEM : TOWERLEVELS: 5NUMBER OF SPACES: 36FOOTPRINT: 2,000 GROUND SFRETRIEVAL TIME: 120-180 SECSSYSTEM DIMENSIONS: Height:40Length: 80Width:25
PROJECT DETAILS
#
STAR TOWERTraditional parking in the basement would have required all of the area in the basement to be used for parking and a subterranean level for other BOH uses. Reduction in parking area using a tower system allowed the developer to remove the subterranean level and capture back 85% of the ground floor basement space and was then able to add storage units and amenities, as well as other BOH areas that were not able to be accommodated earlier.
#
TRADITIONALVS.MECHANICALTRADITIONAL PARKING METRICS:
350 GSF/Car13,500 GSF, or 100,800 CFT for Parking13,500 SF for Sub-T Basement270,000 CFT of ExcavationCost: >$85,000/car
MECHANICAL PARKING METRICS:
56 GSF SF/Car2,000 GSF, or 80,000 CFT for Parking11,500 SF for Sub-T Basement135,000 CFT of ExcavationCost: