Upload
parag-shah
View
110
Download
0
Tags:
Embed Size (px)
Citation preview
CURRENT SCENARIO
Your printing machine prints >8000 impressions/hour
You print 30 + job in a day.
You have punching machine(s)
You get jobs (20+) with creasing/perforation.
You have 2 operators per shift for punching machine
Punching machine productivity is 1500 max/hr
Make ready on punching is minimum 30 min.
No of sheets wasted per job is minimum 5
LETS LOOK AT YOUR COST
• Minimum 30 minutesMake ready time
• 1000 to 1500 sheetsProductivity per hour
• 5No of sheets wastage per job
• 10Cost per sheet
• 20No of jobs per day
• 200Total sheets per day wastage
• 8*1500= 13000 sheetsProductivity on 8 hours shift
• 64,000 sheetsPrint production @ 8000 sheets/hr
ADVANTAGE?
Make ready time < 1 minute
Speed 8000 sheets per hour
Size 20” x 28” extendable up to 20” x 39”
Creasing ( digital, offset and heavy stock) and
perforation ( micro perforation also) possible
100% accuracy
Creasing up to 400 gsm std ( 800 gsm heavy tool)
& perforation up to 250 gsm.
You get accurate creased or perforated sheet
No registration error
No waiting time
Happy customer
Happy bank balance
WHAT MORE?
SO, WHAT DO YOU NEED TO
DO?
Install Hitech’sDG Line
like
Ocean
Printwell
Smruti
PrakashOffset
Bharat Copy
BG & K