13
Keith Warren 828-230-1729 [email protected] President

Design And Construction

Embed Size (px)

Citation preview

Page 1: Design And Construction

Keith Warren 828-230-1729

[email protected]

President

Page 2: Design And Construction

Design and Construction

Page 3: Design And Construction

State of the Art Design/Construction

• Shared roof structure- composter/drystack• Covered working pad• Galvanized doors with fiberglass liner• One touch control panel for aeration• New leachate treatment- aerobic• One blower to handle all bins 24/7• New bucket grinder/screen for easy use

Page 4: Design And Construction

NRCS APPROVED

Split - door design >>>

Concrete working pad

Page 5: Design And Construction

<<< Aeration Header

Leachate Collection >>> Pipe

Page 6: Design And Construction

Aeration Manifold >>>

^^^Lifting Pins

Ramp

Page 7: Design And Construction
Page 8: Design And Construction

Hay Shredder

Page 9: Design And Construction

Sunburst Trout Farm, Bethel, NC

This system was specially designed for an aquaculture operation. Contact us if you think that your business can benefit from forced air composting.

Page 10: Design And Construction

The End Result

Page 11: Design And Construction

Advanced Composting Technologies, LLC

Mortality Calculator for Productivity Improvement Evaluation

Farm Size 43,000 43,000 43,000 43,000 43,000 Turns per year 2.5 2.5 2.5 2.5 2.5Mortality Rate 5% 5% 5% 5% 5%Average weight of animal 140 140 140 140 140Estimated Annual Mortality (lbs) 752,500 752,500 752,500 752,500 752,500

Bin Loading Rate 6,000 8,000 8,000 9,000 9,000 First Stage Cycle time 45 45 35 30 30Second Stage Cycle time 45 45 35 30 0Bin Cycles per year 4.06 4.06 5.21 6.08 12.17Calculated lbs per year 24,333 32,444 41,714 54,750 109,500 " " rounded 24,000 33,000 42,000 55,000 100,000

# Bins Required - estimated 31.35 22.80 17.92 13.68 7.53 Pratical # Bins Required 32 24 18 14 8

Per Bin Price: 8,000$ 10,000$ 12,000$ 12,500$ 15,000$ Total Project Price: 256,000$ 240,000$ 216,000$ 175,000$ 120,000$

Page 12: Design And Construction

Forced Air Composting Testimonial from a NC Hog Farmer

• In the first 4 months we composted 228,000 lbs. of dead animals.

• We have run the facility at both 3% and 10% mortality. The forced aeration system is forgiving enough to accommodate either.

• I suggest under normal conditions an application rate of between 8,500 and 9,500 lbs. per bin.

• During times of high mortality, the bins will adequately handle up to 11,000 lbs. of mortality.

Page 13: Design And Construction

Whole Hog Composting at Little Creek Hog Farm Ayden North Carolina

16 Bin Facility w/ Storage 10,000lbs mortality per bin “Capped and cooking”

150°F Processing Temps Forced Aeration Floor “Storage for Land 28 days application”