LABORATORY DECOMMISSIONING

Neal Langerman Advanced Chemical Safety San Diego, CA

American Chemical Society National Meeting March, 2012

Page 2: Decommissioning labs.pptx

Laboratory Decommissioning •  Decommissioning is a process to ensure a facility and its

associated infrastructure meet environmental health and safety requirements for its next use.

•  Risk-based identifications of hazards must guide the decommissioning planning and implementation

•  Laboratories are generally “safe” locations •  Extraordinary decommissioning activity is only warranted

for the highest risk locations •  Rock (drill cores) permeation lab (extreme measures

to insure detection and removal of Hg) •  Semiconductor development lab (normal measures to

detect heavy metals) 2 Lab Decommissioning

Page 3: Decommissioning labs.pptx

Laboratory Decommissioning •  Purpose

•  Become familiar with the ANSI Building Decommissioning standard and some of it’s key implementation features

•  Illustrate with actual decommissioning situations •  Gain a realistic understanding of how to approach a

decommissioning project

3 Lab Decommissioning

Page 4: Decommissioning labs.pptx

ANSI Standard

4 Lab Decommissioning

ANSI/AIHA Z9.11-2008

Page 5: Decommissioning labs.pptx

Laboratory Decommissioning

Initiate Project

Identify Current Use

How clean does owner demand?

What is included in scope?

Offices, Labs? Production?

Define new use

Is a regulatory report required?

5 Lab Decommissioning

Page 6: Decommissioning labs.pptx

Laboratory Decommissioning

Define Hazards

Samples Needed

Media Number

Cost & Time

Who does work?

6 Lab Decommissioning

Page 7: Decommissioning labs.pptx

Laboratory Decommissioning •  Sampling

7 Lab Decommissioning

Page 8: Decommissioning labs.pptx

Laboratory Decommissioning

8 Lab Decommissioning

Page 9: Decommissioning labs.pptx

Laboratory Decommissioning •  Planning

•  Assemble the RIGHT team •  Facility Manager •  Lab Supervisor •  EH&S Supervisor •  Decommissioning Project Manager

•  Written Plan •  Add updates as needed

9 Lab Decommissioning

Page 10: Decommissioning labs.pptx

Laboratory Decommissioning •  Planning

10 Lab Decommissioning

Page 11: Decommissioning labs.pptx

Laboratory Decommissioning •  Implementation

•  Plan each day’s activity •  Tool Box meeting daily

•  Include & document safety •  Document changes to Work Plan

11 Lab Decommissioning

Page 12: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 12

Page 13: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 13

Page 14: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 14

Page 15: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 15

Page 16: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 16

Page 17: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 17

Page 18: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 18

Page 19: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 19

Page 20: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 20

Page 21: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 21

Page 22: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 22

Page 23: Decommissioning labs.pptx

Laboratory Decommissioning •  Final Report

•  Document all work done •  Liberal use of photographs

•  Include all lab reports •  Chain-of-Custodies

•  Include the work plan and amendments •  Is “certification” needed?

Lab Decommissioning 23

Page 24: Decommissioning labs.pptx

Laboratory Decommissioning •  Certification •  As of the date of this report, all of the equipment listed

on the inventory was in a condition for removal. No hazardous materials were present on or in this equipment.

•  The various areas identified have been cleaned and are free of hazardous materials and certificates have been posted in those areas.

•  The Site Name, located at Address has been rendered clear of hazardous research, production and process chemicals and their residues as of date.

Lab Decommissioning 24

Page 25: Decommissioning labs.pptx

Laboratory Decommissioning

Lab Decommissioning 25

With a decommissioned site, now is the time for …

QUESTIONS?