Serra Pelada Building Brazil’s Next Gold Mine
Forward Looking Statements
Forward-looking statements in this presentation include statements regarding the timing and nature of future exploration and development programs
that are dependent on projections that may change as drilling continues, or if unexpected ground conditions are encountered. The Company does not
currently have any mineral properties that are in production or that contain a reserve as defined by National Instrument 43-101. In addition, areas of
exploration potential are identified which will require additional drilling to determine whether or not they contain similar mineralization to areas that
have been explored in more detail. Significant additional drilling is required at Serra Pelada to fully understand system size.
Certain information contained in this presentation, including any information relating to Colossus Minerals Inc.’s (“Colossus” or the “Company”) future
financial or operating performance may be deemed “forward-looking”. All statements in this presentation, other than statements of historical fact, that
address events or developments that Colossus expects to occur, are “forward- looking statements”. Forward-looking statements are statements that
are not historical facts and are generally, but not always, identified by the words “expects”, “does not expect”, “plans”, “anticipates”, “does not
anticipate”, “believes”, “intends”, “estimates”, “projects”, “potential”, “scheduled”, “forecast”, “budget” and similar expressions or their negative
connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on
the opinions and estimates of management as of the date such statements are made and are subject to important risk factors and uncertainties, many
of which are beyond the Company’s ability to control or predict. Forward-looking statements are necessarily based on estimates and assumptions that
are inherently subject to known and unknown risks, uncertainties and other factors that may cause Colossus’ actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking statements. Such factors include,
without limitation: price levels and volatility in the spot and forward markets for commodities; the uncertainties inherent to current and future legal
challenges Colossus is or may become a party to; controls, regulations and political or economic developments in the countries in which the Company
does or may carry on business; changes in national and local government legislation in Canada, Brazil or any other country in which Colossus
currently does or may in the future carry on business; the lack of certainty with respect to foreign legal systems, which may not be immune from the
influence of political pressure, corruption or other factors that are inconsistent with the rule of law; the speculative nature of mineral exploration and
development, including the risks of obtaining and maintaining the validity and enforceability of the necessary licenses and permits and complying with
the permitting requirements of each jurisdiction that Colossus operates; fluctuations in the international currency markets and in the rates of exchange
of the currencies of Canada, the United States and Brazil; significant capital requirements; impact of any hedging activities; taxation; additional funding
requirements; loss of key employees; changes in project parameters as plans continue to be refined; accidents; labour disputes; defective title to
mineral claims or property or contests over claims to mineral properties; and competition. In addition, there are risks and hazards associated with the
business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations,
pressures, cave-ins, flooding as well as other risks discussed under the heading “Risks Factors” included in Colossus’ latest Annual Information Form
filed at www.sedar.com. Forward-looking statements are not guarantees of future performance, and actual results and future events could materially
differ from those anticipated in such statements. All of the forward-looking statements contained in this presentation are qualified by these cautionary
statements. Colossus expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new
information, events or otherwise, except in accordance with applicable securities laws.
The technical information in this presentation has been reviewed by Graham Long, VP of Exploration of Colossus Minerals Inc. and Qualified Person
for the project.
May 3, 2013 2
Serra Pelada
• Develop the Serra Pelada Mine in a cost-
effective, sustainable and safe manner
• Provide leading cash flow per share,
earnings per share and dividend yield to
investors
• Deliver low cost, high margin growth from
organic sources
THE VISION
May 3, 2013 3
Serra Pelada 2013 OBJECTIVES
Objective Target
Extract and analyze bulk sample from the CMZ Second quarter
Initial NI 43-101 outlining 12 months probable
resources and reserves Early second quarter
Complete process plant construction Early second half
Initial production Early second half
First gold pour Second half
Design & engineer flotation plant Second half
Complete PGM flotation plant First half 2014
May 3, 2013 4
Capital Structure AS AT APRIL 30, 2013 EXCEPT WHERE OTHERWISE NOTED
All dollar amounts $CDN, unless noted Current Position
Shares outstanding - basic 107.0 million
Shares outstanding - fully diluted 121.1 million
Market capitalization (04/01/13) C$329.4 million
Share price (04/01/13) C$3.08
52-week range C$2.33 – C$6.03
Insider ownership (approximate) 1.4%
Institutional ownership (approximate) 65%
Options & Warrants (5,175,000 - CSI.WT.A –Exp. Nov 8/16 ) 14.0 million
Cash balance (December 31/12) US$63.5 million
Gold-linked Note – CSI.NT - Matures Dec 31/16 C$86.25 million
Precious metals sale (35% Pt and Pd, 1.5% Au) US$75 million
Major Shareholders
Arias Resources, Acuity, Sprott Asset Management, Van Eck, Franklin Advisers, RBC
Global Asset Management, Franklin Templeton, Fidelity, BC Investment, MFS
May 3, 2013 5
Focused on Brazil
• Resource-rich country
• Pro-mining government
• World’s 6th largest economy
by GDP and largest in South
America
• Real GDP growth of 3.1%
forecast in 2013
• Inflation estimated at 5.7%
and stable monetary policy
May 3, 2013 6
Serra Pelada
• Prolific Carajas
region
• Major deposits of iron
ore, copper-gold,
manganese
• Robust infrastructure
with access to roads,
power, water and
skilled labour
• Vale S.A. investing
billions of dollars over
the next decade in
the region
LOCATION AND INFRASTRUCTURE
May 3, 2013 7
Serra Pelada LAND AND PERMITS
• Preliminary Environmental License –
issued March 2010
• Precedes balance of permits –
issued by COEMA
• Installation License – issued April 2010
• Para State environmental council
• Mining License – issued May 2010
• Ministry of Mines and Energy
Permits
Land Package
• 874 hectare property
• Ownership Structure:
Colossus 75%
Coomigasp 25%
May 3, 2013 8
High Grade Deposit GRADE VARIABILITY
May 3, 2013 9
High Grade Deposit GRADE VARIABILITY
May 3, 2013 10
Underground Drilling DEFINING AND DELINEATING THE CMZ
• Exploration and definition underground
drilling commenced in Dec 2011
• Bulk sample currently being extracted
from CMZ
• An initial NI 43-101 resource and
reserve statement will be produced
which will outline the initial resource
and reserve estimate for approximately
one year, allowing the Company to
accurately predict future earnings
• The drill spacing for this resource and
reserve statement will be as tight as
possible (5 to 10 metre centres)
• As decline and underground
development advances, so will the pace
of reserve drilling
May 3, 2013 11
Serra Pelada DEVELOPMENT TIMELINE
2010 2011 2012 2013 2014
Exploration
Permitting
Construction
Underground
Development
NI 43-101 Resource
Initial Production
Ramp up to 1000 tpd
May 3, 2013 12
Process Plant SIMPLIFIED FLOWSHEET
May 3, 2013 13
Process Plant DESIGN OVERVIEW
Gold Room
Scrubbing,
Screening and
Reagents
Primary Crushing Ball Mill and Gravity
Concentrators
May 3, 2013 14
Primary Crushing INSTALLING CAST IN CHUTE
May 3, 2013 15
Primary Crushing INSTALLING REBAR IN SLAB AROUND CAST IN CHUTE
May 3, 2013 16
Primary Crushing ELEVATED SLAB WITH CAST IN CHUTE
May 3, 2013 17
Primary Crushing FINAL PREPARATION FOR CRUSHER INSTALLATION
May 3, 2013 18
Transfer Tower ERECTION OF STRUCTURAL STEEL
May 3, 2013 19
Primary Crushing INSTALLATION OF CONVEYORS FROM PRIMARY CRUSHER AREA
May 3, 2013 20
Scrubbing POURING LEAN CONCRETE
May 3, 2013 21
Reagents Building ERECTION OF STRUCTURAL STEEL
May 3, 2013 22
May 3, 2013
Process Plant BALL MILL, GRAVITY CONCENTRATORS & GOLD ROOM DESIGN
Gold Room
Ball Mill
Gravity Concentrators
23
Process Plant BALL MILL FOUNDATION CONSTRUCTION
May 3, 2013 24
Mill Feed Bin ERECTING COLUMNS
May 3, 2013 25
Ball Mill FINISHING SLAB ON GRADE
May 3, 2013 26
Gold Room INSTALLING REBAR IN SLAB
May 3, 2013 27
Gold Room POURING CONCRETE IN TANK BASES
May 3, 2013 28
Process Water Tank INSTALLING REBAR IN FOOTING
May 3, 2013 29
Thickener POURING STRUCTURAL CONCRETE
May 3, 2013 30
Thickener INSTALLING SUPPORT STEEL
May 3, 2013 31
Thickener BOTTOM PLATES INSTALLED, SIDE WALLS & STAIR TOWER STARTED
May 3, 2013 32
Thickener ERECTING PLATFORM IN STAIR TOWER
May 3, 2013 33
Thickener LIFTING FIFTH WALL SECTION INTO PLACE
May 3, 2013 34
Thickener ERECTION OF THICKENER WALLS
May 3, 2013 35
Power House INSTALLING FORMS IN TRENCH AND ERECTING MEZZANINE
May 3, 2013 36
Power House ROOF ON – CONSTRUCTION OF MEZZANINE UNDERWAY
May 3, 2013 37
Development Decline
May 3, 2013 38
Underground Development CONTINUING WITH PRIMARY DEVELOPMENT
May 3, 2013 39
Underground Development DEVELOPMENT IN THE BULK SAMPLE ACCESS DRIFT
May 3, 2013 40
Underground Development ELECTRICAL SUBSTATION COMMISSIONED IN DECEMBER 2012
May 3, 2013 41
Underground Development REFUGE STATION COMMISSIONED IN JANUARY 2013
May 3, 2013 42
Mining Method UNDERHAND CUT & FILL
• Underhand Cut & Fill mining method for
100% extraction of the ore
• Work from top of the orebody down
excavating under cemented rock fill
• Used in a number of high-grade gold
mines including Goldcorp’s Red Lake
Mine, Barrick’s Miekle Mine, Turquoise
Ridge Mine, former Eskay Creek Mine
and Newcrest Kencana Mine
• Trucks to haul ore to surface via the
decline
• Target a 1,000 TPD mining rate
May 3, 2013 43
Bulk Sample MINERALIZED MATERIAL ON THE RUN OF MINE PAD
May 3, 2013 44
Exploration Potential
• Down-plunge extension of
Central Mineralized Zone
• Connecting the Lower Limb to
the Central Mineralized Zone
• Elefante – Potential satellite
deposit two kilometres away
THREE PROSPECTIVE AREAS
May 3, 2013 45
Exploration Potential CONNECTING THE LOWER LIMB TO THE CMZ
May 3, 2013 46
Exploration Potential ELEFANTE – POTENTIAL DEPOSIT TWO KILOMETRES AWAY
• Hole EL-12-001 returned 5.70 metres grading
5.41 g/t gold, 0.04 g/t platinum and 0.29 g/t
palladium
• Hole EL-12-002 returned 5.10 metres grading
0.45 g/t gold, 1.27 g/t platinum and 2.04 g/t
palladium
• Auger drilling included SPTRD-017 (124.78g/t
Au, 6.52g/t Pt and 7.67g/t Pd over 1.5 m)
• Auger drilling in saprolite together with
diamond drilling suggest a broad halo of
mineralization in the Elefante Area sourced by
deeper bedrock zone
Please see news releases issued November 14, 2011, March 12,
2012, August 20, 2012 and January 10, 2013 for complete NI 43-
101 compliant disclosures.
May 3, 2013 47
Sierra Pelada
Cutia
Cutia Project DRILLING COMMENCES IN 2013
• 75% ownership interest purchased from
COOMIC for R$3.6 million (~USD $2.0
million) payable in installments upon
satisfaction of certain milestones.
• Mesothermal gold and silver project
• 633 hectares, 13 km SE of Serra Pelada,
accessed by same road
• Mineralized vein system occurs along the Cutia
Fault Zone that separates two major lithologic
domains
• 3 metre thick quartz veins outcropping on
surface
• ~ 65,000 ounces produced by artisanal
miners between 1988 and 1992
• 2.5 km of strike length and still open to
the west and east
May 3, 2013 48
Serra Pelada A COMPELLING INVESTMENT
• Gold & PGM grades at Serra Pelada are among the highest on record
• High grade, potential low cost emerging producer
• Project is permitted, financed to initial production and construction is well
underway
• 110,000 metres drilled, significant exploration upside
May 3, 2013 49
TSX: CSI www.colossusminerals.com
OTCQX: COLUF
Colossus Minerals Inc.
1 University Avenue, Suite 401
Toronto, ON M5J 2P1
Ann Wilkinson
Vice President, Investor Relations
416.643.7655
www.colossusminerals.com
May 3, 2013 50
APPENDICES
May 3, 2013 51
Community
• Striving to build a stronger community – community
based projects
• Hiring locally is a priority
• Education and training
• Community donations (ambulance and police vehicles)
• Health and dental services
• Children’s programs (sports teams, first aid training, social events)
May 3, 2013 52
Community Programs
Community based projects
• Donation of ambulance and police vehicles
• Public security and police training
• School renovation
• Hospital renovation
• Municipal stadium renovation
• Municipal theatre renovation
• 2012 - installation of a community centre focused on worker training
and qualifications, income generation programs, computer training
centre and environmental education
Health • Vaccination programs
• Medical and dental
services
May 3, 2013 53
Community Programs
Children
• Soccer school
• Sporting events
• Social events
• Visual arts workshops
• Reading programs
Education and training programs
• Literacy programs
• First aid and safety training
• Serra Pelada Capoeira school for children,
teenagers, youth and adults
May 3, 2013 54
Area A PAYMENT STRUCTURE
Range of production (millions of ounces of
metal)
Royalty as a
percentage of gold
price on precious
metal sold* From To
--- 2.03 ~ 2.1%
2.03 4.79 ~ 1.4%
4.79+ --- ~ 1.3%
Colossus must pay COOMIGASP R$350,000
(US$177,665**) per month and payments cease when
production begins.
In addition Colossus will finance their portion of
CAPEX (25%). * Precious metal is defined as any one of gold, platinum,
palladium, rhodium, osmium, ruthenium or iridium
** Basis 1.97 R$ per US$ (2/22/13)
May 3, 2013 55
Area B PAYMENT STRUCTURE
• Have paid COOMIGASP R$8 million
(US$4.5 million)
• Will pay COOMIGASP a royalty payment of 0.4326
of gold price of precious metals sold*
• Assume conditions of the Vale Agreement:
• Spend US$5 million in exploration over 3 years.
• Present a reserve estimate (proven + probable)
by the end of the 3rd year.
• Pay Vale a fee of US$35/oz of gold, platinum,
palladium based on the reserve estimate.
Consideration
700 – Hectare Land Tenement
•Precious metal is defined as any one of gold, platinum, palladium,
rhodium, osmium, ruthenium or iridium.
May 3, 2013 56
Area C PAYMENT STRUCTURE
• Have paid COOMIGASP R$4
million (US $2.2 million)
• Will pay COOMIGASP a royalty
of 2.0908% of gold price on
precious metals sold*
* Precious metal is defined as any one of gold, platinum,
palladium, rhodium, osmium, ruthenium or iridium
Consideration
74 - Hectare Land Tenement
May 3, 2013 57
Warrants and Options AS AT APRIL 30, 2013
Warrant price # of
warrants Expiry
$8.50 5,175,000 Nov 8, 2016
Range Options
Outstanding Options
Exercisable
$0.48CAD - $1.50CAD
150,000 150,000
$1.51CAD - $3.00CAD 285,000 83,750
$3.01CAD - $4.50CAD 2,945,000 1,633,750
$4.51CAD - $6.00CAD 2,485,000 1,203,750
$6.01CAD - $8.37CAD 2,980,000 2,830,000
TOTAL: 8,845,000 5,901,250
May 3, 2013 58
Senior Management
Claudio Mancuso,
CA
CEO, Director
• Over 10 years experience in mining industry and capital markets
• Previously VP, Treasurer of Agnico-Eagle Mines Limited
• Involved in raising over $4 billion over the past five years in both equity and debt capital markets
David Anthony
President & COO
• Previously Senior Vice President, Mining of Forbes & Manhattan
• Previously worked for Kinross, as the Project Director, responsible for execution of the Fruta del Norte Project and held Senior positions
at Barrick Gold in Tanzania responsible for the development of the Bulyanhulu, Buzwagi and Tulawaka mines
Alden Greenhouse, CFA
CFO
• Over 10 years capital markets experience in commodity risk management, foreign-exchange and fixed income
• Senior management positions with RBC Capital Markets and Senior Analyst at Dominion Bond Rating Service
Graham Long
VP, Exploration Qualified Person
under NI 43-101
• Over 25 years’ experience in the mining industry, spent the majority of his career with Agnico-Eagle Mines where he held progressively
changing roles from exploration geologist to Exploration Manager for Canada.
• Mr. Long has a broad range of mining experience having worked in several operating mines both underground and open-pit as well as
experiencing the discovery of a gold deposit and seeing it through to production.
Luis Albano Tando VP, Operations &
Country Manager,
Brazil Qualified Person
under NI 43-101
• Mining engineer with twenty five years’ experience working at increasingly senior levels of a number of organizations.
• Previously COO at OROSUR Mining Inc.
• Prior to this, worked in a variety of capacities for Kinross
• He is also a fellow of the Australian Institute of Mining and Metallurgy (AusIMM)
Jason Brooks
VP, Finance
• More than 10 years of finance and accounting experience in the mining industry. He most recently served as Assistant Controller of
NewGold Inc., an intermediate gold producer. Previously, he spent six years with Barrick Gold Corporation in various financial
management positions. Prior to joining Barrick, he spent five years at BDO Dunwoody LLP, a public accounting firm.
Ann Wilkinson
VP, Investor
Relations
• 20 years in the mining industry in investor relations and other management roles. Prior to joining Colossus, served as Vice President,
Investor Relations of Breakwater Resources Ltd. Prior to Breakwater she held a number of roles with several capital market firms and a
couple of junior gold exploration companies.
Lesley Duncan
VP, Corporate
Secretary
• Over 10 years experience as a securities law clerk and corporate secretary.
• Held the Corporate Secretary position at Breakwater Resources Ltd. for 4 years. Prior to that she was Breakwater’s Corporate and
Securities Law Clerk.
• Ms Duncan is a member of Canadian Society of Corporate Secretaries.
May 3, 2013 59
Board of Directors
John Frostiak,
P.Eng Chairman Qualified Person under NI 43-101
• Over 35 years experience in the mining industry. Managed Metallurgy and Process Development for Barrick Gold Corp.
• Lead developer of both Pierina Mine and Bulyanhulu Mine for Barrick
Claudio Mancuso,
CA Chief Executive Officer
• Over 10 years experience in mining industry and capital markets
• Previously VP, Treasurer of Agnico-Eagle Mines Limited
• Involved in raising over $4 billion over the past five years in both equity and debt capital markets
J. Alberto Arias • Founder, General Partner and Portfolio Manager of Arias Resource Capital Management LP
• Previously Managing Director of Goldman Sachs – Metals & Mining Research from 1998 to 2006,
• Mr. Arias has engineering degrees in mining and metallurgy and an MBA (B.Sc. from the Colorado School of Mines and three
Masters degrees from Columbia University), mining industry operational experience, and holds a patent for a gold mineral
processing technology.
David Garofalo • President and Chief Executive Officer of Hudbay Minerals Inc.
• Previously served as Senior Vice President, Finance and Chief Financial Officer and a director with Agnico-Eagle Mines Limited
Mr. Garofalo worked in various finance roles including Treasurer with Inmet Mining Corporation.
Greg Hall Qualified Person under NI 43-101
• Over 40 years experience in the mining industry. Chief geologist world-wide of Placer Dome until the Barrick takeover
• Credited discoveries include Granny Smith Mine (Barrick), Yandi Mine (Rio Tinto)
Mel Leiderman,
CA, CPA • Managing Partner of Lipton LLP, Chartered Accountants.
• Current Member of Agnico-Eagle Mines Limited Audit Committee (Chair from 2005 – 2011)
• Board of Trustees – Morguard North American Residential REIT. Audit committee member.
Douglas Reeson,
MBA
• Current CEO of Gossan Resources Limited and a director of Lithium Americas Corp., Mega Uranium Ltd. and Soltoro Ltd.
John S.M. Turner • Partner at Fasken Martineau DuMoulin LLP and the Leader of its Global Mining Group
• Has been recognized on numerous occasions including Best Lawyers in Canada for Natural Resources Law
• Recipient of the Queen's Golden Jubilee Medal and is a member of both the Canadian Association and the Law Society of
England and Wales.
May 3, 2013 60
Analyst Coverage
Research Firm Analyst Latest Coverage Target/Rating
Clarus Securities Jamie Spratt April 2013 $8.25 – Spec. Buy
GMP Securities George Albino April 2013 $11.50 – Buy
Canaccord Genuity Nicholas Campbell March 2013 $7.75 – Spec. Buy
Stifel, Nicolaus Craig Stanley April 2013 $3.55 – Buy
Dundee Securities Joseph Fazzini Under Review
Macquarie Securities Michael Gray April 2013 $4.00 – Outperform
May 3, 2013 61
NOTES