Counting the Capacity that Didn’t Hatch: The Rate Mitigation Effects of DSM Programs December 12, 2013 Jenny Edwards| Program Manager • CEE Innovation Exchange

Counting the Capacity that Didn't Hatch

Embed Size (px)

DESCRIPTION

Jenny Edwards explains how Demand Side Management programs benefit ratepayers by keeping costs down overall, allowing customers to save on the energy they do use as well as the energy they don’t.

Citation preview

Page 1: Counting the Capacity that Didn't Hatch

Counting the Capacity

that Didn’t Hatch: The Rate Mitigation Effects of DSM Programs

December 12, 2013

Jenny Edwards| Program Manager • CEE Innovation Exchange

Page 2: Counting the Capacity that Didn't Hatch

Page 2

Requires a better understanding of the system wide revenue benefits of DSM programs

Page 3: Counting the Capacity that Didn't Hatch

Counting the Capacity

that Didn’t Hatch: The Rate Mitigation Effects of DSM Programs

December 12, 2013

Jenny Edwards| Program Manager

Page 4: Counting the Capacity that Didn't Hatch

Page 4

Requires a better understanding of the system wide revenue benefits of DSM programs

Energy Efficiency as a System Resource…

Page 5: Counting the Capacity that Didn't Hatch

• Efficiency Costs recovered through rates and

“trued up” regularly

• Utilities are incentivized to meet and exceed

targets

• Costs are often more transparent to customers

than traditional capacity additions & incentives

• Savings from avoided costs are less visible

Energy Efficiency Context

Page 6: Counting the Capacity that Didn't Hatch

• Analyzed 20-year program data from Xcel Energy

• Conducted a backward-looking scenario analysis

to compare capacity options

• Focused on additional revenue requirements for

two scenarios: DSM and No DSM

• Revenue requirements are distinct from rates

Minnesota DSM Case Study

Page 7: Counting the Capacity that Didn't Hatch

Page 7

The Resource Wedge

Additional Revenue Requirements = Σ Annual Additional Costs ÷ Total Sales

Page 8: Counting the Capacity that Didn't Hatch

Customer Charge $8/mo

Energy Charge $0.08/kWh

Demand Charge $15/kW

Riders $0.003/kWh

Example Utility Bill

What is cost of itemized power plant capacity?

Page 9: Counting the Capacity that Didn't Hatch

Page 9

• Lower Resource Costs

• Fewer Sales

DSM Scenario Power Plant Scenario

• Higher Resource Costs

• More Sales

0.24 ¢/kWh 0.66 ¢/kWh

Additional Revenue Requirements = Σ Annual Additional Costs ÷ Total Sales

Page 10: Counting the Capacity that Didn't Hatch

Cost Considerations

• Conservation and Load Management Program Costs

• Indirect Impact Program Costs

• Incentives & Lost Revenues

• Capital & Financing Costs

• Shareholder Returns

• Fuel Costs

• O&M

• T&D maintenance

DSM Scenario Power Plant Scenario

Page 11: Counting the Capacity that Didn't Hatch

Page 11

-

250

500

750

1,000

1,250

1,500

1,750

2,000

Cap

acit

y (

MW

)

Incremental Demand Savings

Cumulative Offset Capacity

Power Plant Offsets from DSM

Page 12: Counting the Capacity that Didn't Hatch

Page 12

-

250

500

750

1,000

1,250

1,500

1,750

2,000

Cap

acit

y (

MW

)

250 MW

Power Plant Offsets from DSM

Cumulative Offset Capacity

250 MW

250 MW

250 MW

250 MW

250 MW

250 MW Assumed Combined Cycle Power Plants

Page 13: Counting the Capacity that Didn't Hatch

Page 13

$-

$200

$400

$600

$800

$1,000

$1,200

No

min

al $

/kW

Combined Cycle Overnight Capital Costs

Source: AEO Assumptions

Years when plants came online

Page 14: Counting the Capacity that Didn't Hatch

Page 14

Capital Revenue Requirement Calculations

Page 15: Counting the Capacity that Didn't Hatch

Page 15 Source: EIA Electric Power Producer Price

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

$2

01

1/M

MB

tu

Historical Natural Gas Fuel Costs

Page 16: Counting the Capacity that Didn't Hatch

Page 16

Results

$1.14 Billion

Total Cost $4.16 Billion

Natural Gas Power Plants

DSM Programs

580,855 GWh Total Sales 629,212 GWh

0.24 ¢/kWh Addl Revenue 0.66 ¢/kWh

Incentives 23%

Program Costs 77%

Page 17: Counting the Capacity that Didn't Hatch

Page 17

Scenario: Coal Plant Displacement

Page 18: Counting the Capacity that Didn't Hatch

Page 18

-

250

500

750

1,000

1,250

1,500

1,750

2,000

Cap

acit

y (

MW

)

250 MW

Power Plant Offsets from DSM

500 MW

250 MW

250 MW

250 MW

250 MW Add one 500-MW Coal Plant

Page 19: Counting the Capacity that Didn't Hatch

Page 19

Scenario: Coal Plant Displacement

Coal Capital

42%

Coal Operatio

n 19%

Gas Capital

18%

Gas Operatio

n 19%

Transmission 2%

$4.89 billion

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

DSMResource

Gas Only Coal + GasR

eve

nu

e R

eq

uir

em

en

ts

(¢/

kWh

)

0.78 ¢/kWh

Page 20: Counting the Capacity that Didn't Hatch

Page 20

Scenario: Avoided Transmission Lines

Page 21: Counting the Capacity that Didn't Hatch

Page 21

Scenario: Avoided Transmission Lines

$4.30 billion 0.68 ¢/kWh

0.000.100.200.300.400.500.600.700.800.90

Rev

en

ue

Re

qu

ire

me

nts

(¢/

kWh

)

Capital Costs 33%

Fuel 54%

O&M 8%

Transmission 5%

Page 22: Counting the Capacity that Didn't Hatch

Page 22

Scenario: Average Measure Life

Page 23: Counting the Capacity that Didn't Hatch

Page 23

10-Year Measure Life

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

DSM Resource Gas Only 10-yr MeasureLife

Rev

en

ue

Re

qu

ire

me

nts

(¢/

kWh

)

Capital Costs 30%

Fuel 58%

O&M 9%

Transmission 3%

$3.26 billion 0.53 ¢/kWh

Page 24: Counting the Capacity that Didn't Hatch

Page 24

20-Year Measure Life

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

DSMResource

Gas Only 10-yrMeasure Life

20-yrMeasure Life

Rev

en

ue

Re

qu

ire

me

nts

(¢/

kWh

)

$4.50 billion 0.71 ¢/kWh

Capital Costs 31%

Fuel 58%

O&M 9%

Transmission 2%

Page 25: Counting the Capacity that Didn't Hatch

Page 25

Summary of Scenario Results

0.24

0.66

0.78

0.68

0.53

0.71

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

DSM Resource Gas Only Coal + Gas NewTransmission

Lines

10-yr MeasureLife

20-yr MeasureLife

Rev

en

ue

Re

qu

ire

me

nts

(¢/

kWh

)

Page 26: Counting the Capacity that Didn't Hatch

• System wide avoided revenue requirements are 3-4 times higher than DSM program costs

• DSM programs allow customers to save on the energy they do use, as well as the energy they don’t

• Includes total DSM costs, but only power plant costs recovered during the 20-yr time frame

• One specific example, but relevant for other DSM programs, especially those just beginning.

• Conditions going forward will be different

Summary

Page 27: Counting the Capacity that Didn't Hatch

www.mncee.org/Innovation-Exchange/Resource-Center

Jennifer Edwards | Program Manager

[email protected]

(612) 335-5873

Megan Hoye | Engagement Coordinator

[email protected]

(612) 244-2417

Page 28: Counting the Capacity that Didn't Hatch

www.mncee.org/Innovation-Exchange/Resource-Center

Questions?