XB, R Control Chart Example
D. W. Parent
2
We want to learn control charts
• We have oxide thickness data generated by the Poison Diffusion Furnace Company.
• The furnace is a single wafer processor• We have taken 5 data points per wafer
1
2
3
4 5
3
We will use the first 20 runs to set our trial control limits
Calculate the average (XB) of each row.
Raw data
4
Calculate the Range (R) of each row
Maximum value in the row minimum the minimum value in the row
5
Calculate the Grand Mean (XBB) on the first 20 data points
Cell J2 calculates the grand meanWhile cell j3=j2, j4=j3…..
6
Calculate the mean of the Ranges (RB)
Note: K3=K2…..
7
Calculate the Upper and Lower control limits for XB (UCLXB, LCLXB) for a sample size of 5
UCLXB=XBB+RB*.58
LCLXB=XBB-RB*.58
8
Calculate the Upper Control limit for R (UCLRB) and the Lower Control limit for R (LCLRB)
UCLRB=2.11*RB
LCLRB=0 by definition
9
Plot the XB chart
920
940
960
980
1000
1020
1040
1060
1080
1100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Run #
XBA
R
Notice we have one point outside the control limit. Maybe this was a typo whenthe data was entered. Remove the row that data point was from.
10
Re-plot the XB chart
Looks good!
950
960
970
980
990
1000
1010
1020
1030
1040
1050
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Run #
XBA
R
11
Plot the RB Chart
0
20
40
60
80
100
120
140
160
180
0 5 10 15 20
Run #
Ave
rage
Ran
ge RRBUCLRLCLR
Looks like we have one bad point. Remove it and recalculate X and R charts
12
Trial Limits look good!
0
20
40
60
80
100
120
140
160
0 5 10 15 20
Run #
Ave
rage
Ran
ge
950
960
970
980
990
1000
1010
1020
1030
1040
0 5 10 15 20
Run #
XB
Now plot for whole data set
13
Final Plots?
0
20
40
60
80
100
120
140
160
0 20 40 60 80 100 120
Run #A
vera
ge R
ange
950
960
970
980
990
1000
1010
1020
1030
1040
0 20 40 60 80 100 120
Run #
XB
The control limits seem to work for the XB chart, but not for the R chart. SinceWe did not use data from runs 21 to 100, maybe the points are not past the control limit, but the control limits are not right. Calcualte control lmits on the wholeSet.
14
Final Plots?
950
960
970
980
990
1000
1010
1020
1030
1040
1050
0 20 40 60 80 100 120
Run #
XB
0
20
40
60
80
100
120
140
160
180
0 20 40 60 80 100 120
Run #
Ave
rage
Ran
ge
At this time it looks like the control limits have been calculated correctly, and we Recommend that these limits be used for this process going forward.