    andal Chain link RCC -Anx-13 1

    Range: Gundlupet

    Section : Hangala Total Extent : 1.9 Km. 25 Ha

    Division : KollegalLocation:

    Circle : Chamarajanagar B.Head :

    Sl. Particulars Qty Rate Units Amount

    No. (in Rs.)

    1 2 3 4 5 6

    1 KSRB2-1-2 : Earth work in surface excavation in hard soil forleveling and lowering the ground manually (other than foundationof building, culverts, road drains and trenches of pipe lines and

    cables) and removing the excavated stuff to a distance notexceeding 50m and lift upto 1.5m excavated surface leveled andneatly dressed, disposed earth to be leveled after breaking ofclods and dressed as per specification. (Page no-5 Sl no-2.2)

    Pits-696x0.45x0.30x0.30=14.823 Cum 28.188 120 Cum 3383

    2 KSRB 4.2.9: Providing and laying in position plain cement concrete

    of nominal mix 1:2:4 using 20mm and down size graded granite

    metal, machine mixed concrete laid in layer not exceeding 15cmsthick, vibrate for R.C.C beams, columns of all sizes in foundationplinth and superstructure ground floor level columns, includingcostofall materials, labour, HOM ofmachinery, curing, complete as perspecifications. (page no-13 Sl no-4.18)

    Bed concrete-696x0.30x0.30x0.45= 28.188 Cum

    Deduction 696x0.15x0.15x0.35=(-) 05.481 Cum

    22.707 Cum 22.707 4135 Cum 93893

    3 Preparation of RCC fence postKSRB 4.2.10: Providing and laying in position plain cement

    concrete of nominal mix 1:1:5:3 using 12mm and down size

    graded granite metal, machine mixed, well compacted for plainchajja of 7.5 cms. Average thickness, upto ground floor level,includingcostof all materials, labour, HOM of machinery, finishing,curing, complete as per specifications. (Page no-13, Sl no-4.19)

    Main Pillars

    1) Straight portion : 633x0.125x0.125x2.90 =28.68 Cum(15x15 Cms at bottom/10x10 Cms top)

    b) Bend-portion- 633 x0.10x0.10x0.40 = 2.53 Cum

    (10x10 Cms)

    2) Supporting pillars : 63x0.125x0.125x1.80 =1.77 Cum

    (15x15 Cms at bottom/10x10 Cms top) ----------

    17.349 Cum 32.980 4539 Cum 149696.00

    4 KSRB 4.9.2 : Providing T.M.T steel reinforcement for RCC workincluding straightening, cutting, bending, hooking placing inposition, lapping and /or welding wherever required, tying withbinding wire and anchoring to the adjoining members wherevernecessary complete as per design (laps, hooks and wastage shallnot be measured and paid) cost of materials, labour, HOM of

    machinery complete as per specification (Page no-16 Sl No-4.46)

    For 8 mm

    Estimate for Construction for Chainlink fencing for Promotion of SandalRegeneration during 2009-10 under CAMPA

    Extent : 1.00 KMUNIT COST in Rs.1250000

    Somanathapura SandalReserve

    CAMPA

  • 7/30/2019 Chainlink Fencing

    2/2

    andal Chain link RCC -Anx-13 2

    Sl. Particulars Qty Rate Units Amount

    No. (in Rs.)

    1 2 3 4 5 6

    1) Main polesa) Length Steel/8mm-1x4 Nox3.30 =13.20x633 =8355.60

    b) Ring Steel /6mm -1x16 Nox0.60=9.60x633 =6076.80

    2) supporting poles

    a)Length Steel/8mm- 1x4 Nox1.80 =07.20x63 = 453.60

    b)Ring Steel/6mm 1x9 Nox0.60 =05.40x63 =340.20

    15226.2

    8mm steel-- 8809.20 Rmt x0.395 kg/mtr = 3479.63 Kgs. kgs

    6mm Steel- 6417 Rmt x0.222 kg/ mtr =1424.57 Kgs kgs

    2579.364 Kgs.kgs

    2553.057 / 100 =25.793 q 49.007 4755 Q 233027.00

    5 a) Cost of Tata G.I Chain link wire mesh of 3 x 3 of 8 gauge

    for 1900 Rmtrsx2 Mtrs=3800 Sqm x 10.76=40888.00Sq feet

    Chain link wire mess procured by dept as per O.M No.CCR

    Barbed wire /CR.17/09-10-dated-30-7-2009 of PCCF

    Karnataka. 40888 39.375 Sq.F

    b) Fixing of chain link fencing

    8 Gauge 3x3 properly stretched between vertical with RCC

    Pole withIron stips Bolts, nuts, 1.900 47000 89300

    6 a) Cost of Tata Special hot Dipped 12x12G G.I Barbed wire

    medium Coated with Zinc(30 Gmc, Coated) procured by dept

    as per O.M No.CCR Barbed wire /CR.17/09-10-dated-30-7-2009 of PCCF Karnataka 12x12 gauge 1900 Rmtrs x 5 Strands

    9500/6.25 =1520 Kgs. 1520 97.875 Kg.

    b) Fixing of barbed wire

    1900x5 Strands =9500 Rmtr 9500 L.S. Rmtr 30516

    7 Cost of plain wire /G.I wire 200 Kgs 95 87.36 Kg 8299

    8 Dibbling of Seeds in the Bushes and procurement of Seeds L.S. 8153

    Grand Total Rs. 616,265

    1

    2

    3

    The above rates are subject to the PWD Scrutiny

    Range Forest Officer,Gundlupet Range, Gundlupet.

    Technically Scrutinized andCountersigned for Rs. only

    Countersigned for Rs. only.

    Asst. Conservator of Forests,

    Gundlupet Sub-Division, Gundlupet. Deputy Conservator of Forests,Kollegal Division, Kollegal.

    Certified that the above works are included in the sanctioned APO.

    Certified that the amount claimed in this estimate has not been drawn in any of theprevious estimate.