50M PEB Erectioncsp-jamshedpur
Step 1 – Assembly of 2 rafters with bracings on ground
Step 2 – Erection of columns under suspended rafter
Step 3 – Lifting of Assembled unit up to 43 mtr height
Step 3 – cont….Lifting of Assembled unit up to 43 mtr height
Step 3 – cont….Lifting of Assembled unit up to 43 mtr height
Step 4 – Swing to Position at 43 mtr height
Step 5 – Positioning
Step 6 – Bolting at 36 mtr height
Step 7 – Releasing load from Crane
Step 7 – Erection Complete