Joint Venture

between

the environmental arm of the Saffelberg group, Belgium

and

investment-construction group, leader in Turkey

– Thermal: 1270MW realised or co-realised– Hydro: 765 MW realised– Geothermal: 48 MW realised, 162 MW in progress– 5 Wind farms for 253MW realised + 70MW by 2013

Page 3: BSEF 2013  invest/crimea Loic_Leminiaux

The Project

• 250 MW wind farm, 780 GWh/year• Cutting-edge technology Gamesa G125-4.5MW• 56 wind turbines in 2 stages• Connection and construction permit obtained• Mandate letter signed with ERBD and IFC• 125MW by beginning 2015• 125MW by end 2016

Page 4: BSEF 2013  invest/crimea Loic_Leminiaux

The location

Page 5: BSEF 2013  invest/crimea Loic_Leminiaux

Environmental Impact

• Avoiding the emission of 688,216.4 T of CO2 per year

• Avoiding the consumption of an equivalent of 477 mln m3 of (imported) gas

• Highest environmental standards

Page 6: BSEF 2013  invest/crimea Loic_Leminiaux

Commitment to Community

• Full support of local communities and republican authorities

• Integration into the strategy for the sustainable development of the district

• Public consultation by international standards• 350 000 € at full operation for economic and

social projects (focus on self-supporting projects), of which 50 000 € in 2013.

Page 7: BSEF 2013  invest/crimea Loic_Leminiaux

Economic and Social Impact

• 220 direct and indirect jobs during construction (until end 2016), including nacelle assembly (local content)

• 50 permanent jobs during operations (>2030)• By 2030 95 mln € of profit taxes and 235 mln €

of VAT