March 1, 2011 1 Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions 7320 Bryan Dairy Road, Largo, FL 33777

Bryan dairy progress2

Embed Size (px)

Citation preview

Page 1: Bryan dairy progress2

March 1, 2011

1

Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions

7320 Bryan Dairy Road, Largo, FL 33777

Page 2: Bryan dairy progress2

March 9, 2011

Future Data Production

Future Production Floor

2

Future Home of Account Management Cubicles

Future Production Floor

Future Production Floor Future Data Center & Hand Assembly Areas

Page 3: Bryan dairy progress2

March 29, 2011

Future Front Entrance

Front Office’s Have All Been Framed

Break Room

3

Parking Lot Break Room

Front Office’s Have All Been Framed

Page 4: Bryan dairy progress2

March 29, 2011

Production Floor

Secure Storage Area/Fulfillment/Machine

Shop

Fire Alarms – Have Been Installed

4

Production Floor Production Floor

Secure Storage Area/Fulfillment/Machine

Shop

Page 5: Bryan dairy progress2

March 29, 2011

Demolition Begins

Future Home of Receptionist Office

Future Home of Training Room – Front Office

5

Future Home of Prepress Department

Front Office Corridor – Seen From Lobby

Conference Room – Front Office

Page 6: Bryan dairy progress2

March 29, 2011

Demolition Continues

Future Home of Data Processing & Laser Setup

Future Home of Art Department

6

Future Home of Account Management Cubicles

Front Lobby

Future Home of Art Department

Page 7: Bryan dairy progress2

April 4, 2011

Future Home of ClientConference Room

Production Floor BuildBlocks for Data Center

7

Break Room Hallway leading to Prepress, Art Department, Laser Offices

& Production

Production Floor – Future home of

Heidelberg's

Page 8: Bryan dairy progress2

April 4, 2011

The new building is hurricane category 3

(CAT 3) certified. Inside of the building, we

are using BuildBlock insulating concrete

forms to build the data center, which will

also be Cat 3 certified. It’s an enclosed

structure within the Brian Dairy facility. The

cement block walls and ceiling are reinforced

by rebar and filled with a special waterproof

material.

8

Our state of the art Data Center will be made with

Page 9: Bryan dairy progress2

April 6, 2011

Future home of Heidelberg's

BuildBlocks for Data Center

New Heidelberg Offset Press

9

Production Floor Production Floor

BuildBlocks for Data Center

Page 10: Bryan dairy progress2

April 6, 2011

Future Home of Data Processing & Laser Setup

Marking The Locations Of The New Heidelberg

Presses 10

Future Home of Heidelberg Presses

Production Floor Production Floor

Future Home of Laser Production – 4 HLC Lasers

Page 11: Bryan dairy progress2

April 13, 2011

Double Checking The Location Of The Two Heidelberg Presses

11

The Cement Is Going To Be Cut To Put In Steel Rebar Footings To With Stand The Weight Of The Presses

Page 12: Bryan dairy progress2

April 13, 2011

Beginning To Cut The Cement For The New Presses

12

Wetting The Cement For The Cut!

The First Cut Has been Made!

Page 13: Bryan dairy progress2

April 19, 2011

The Cement Has Been Cut For The Future Home Of Our New Presses

13

Page 14: Bryan dairy progress2

April 19, 2011

Data Center Walls Have Arrived

Lots Of BuildBlock For The Walls Of The Data Center

14

Unpacking Of The Walls 1st Five Feet Of Data Center Walls Are Going

Up!

Page 15: Bryan dairy progress2

April 19, 2011

Account Management Cubicles

New Heidelberg Press

15

Steel Rebar Is In Place For The Footings Of The Cement For The Heidelberg Press

Entrance to Offices From Production Floor

Page 16: Bryan dairy progress2

April 27, 2011

Future home for 2 Xerox iGen, 4 Xerox HLC printers

Steel Rebar Is In Place To Secure The BuildBlocks Used To Build The Walls Of The Data Center

Future Home of Data Center Offices

16

The Cement Has Been Poured For The Heidelberg Presses.

Page 17: Bryan dairy progress2

April 27, 2011

Entrance To The Data Center

Receiving Dock

17

The 1st Five Feet Of The Data Center Walls Are Stabilized Until The Cement Is Dry

Laser

Page 18: Bryan dairy progress2

April 29, 2011

Old Data Center – Future Storage

Inside Of The Data Center, The 2nd 5 Feet of BuildBlocks Have Been Installed And Are Stabilized Until The Cement Is Dry.

18

Account Management Data Center Offices

Page 19: Bryan dairy progress2

April 29, 2011

See The Cement IN The Walls Of The Data Center?

Data Center Walls Data Processing & Laser Setup

19

Data Center Walls Are Stabilized Until Cement Is Dry

Laser Production – location of future HLC

Printers

Page 20: Bryan dairy progress2

May 3, 2011

Data Center Interior

1st Shift Production Supervisor Office

Future Home of Hand Assembly Area

20

USPS & Production Offices Data Center Interior

Future Home of Hand Assembly Area

Page 21: Bryan dairy progress2

May 4, 2011

Heidelberg Slabs waiting for cement pour for wiring

21

Page 22: Bryan dairy progress2

May 11, 2011

View Of The Cement Data Center Walls

USPS & Production Offices

22

Getting The Ceiling Rods In Place To Finalized The Data Center

Data Center

Page 23: Bryan dairy progress2

May 13, 2011

Account Management Cubicles

Future home of Account Management

Laser Department

23

Production Looking At Hand Assembly Area

Future Home of Training Room

Outside of Data Center

Page 24: Bryan dairy progress2

May 13, 2011

Future Offices of Purchasing and

Accounting

24

Roof of Data Center

Page 25: Bryan dairy progress2

May 16, 2011

Data Production & Laser Setup

Wood for Machine Shop Tables

Hand Assembly Area

25

Production Area Production Area

Hand Assembly & Staging Areas

Page 26: Bryan dairy progress2

May 16, 2011

Outside of Data Room Next to Account

Management

Air Conditioning Duct Installation?

Future Home of Account Management

26

Data Center Construction Data Center Construction

Entrance To Data Center

Page 27: Bryan dairy progress2

May 16, 2011

From Offices Corridor

27

Flooring Tiles

Page 28: Bryan dairy progress2

May 17, 2011

Inside of Hand Assembly Area

Account Management Hand Assembly Area

28

Outside of Data Room before Hand Assembly

Built

Outside of Data Room before Hand Assembly

Built

Data Center Interior w/cuts for the UPC’s

Page 29: Bryan dairy progress2

May 20, 2011

Building Supplies

Going Into Lettershop From Account Managers

Area

Hand Fulfillment AreaWalls & Floor In Process

29

Future Warehouse Area More Building Supplies

Heidelberg Press Slab before concrete pour for

wiring

Page 30: Bryan dairy progress2

May 20, 2011

Handroom

Old Server Room Being Converted to Storage

30

Data Center Data Center

Account Management

Page 31: Bryan dairy progress2

May 24, 2011

Break Room

31

Training Room

Hand Assembly Looking into the training room and IT

Installation of New Heidelberg Presses

Page 32: Bryan dairy progress2

May 24, 2011

32

Pipe Drain For PressesData Center Training Room

Page 33: Bryan dairy progress2

May 27, 2011

33

Laser Room

Page 34: Bryan dairy progress2

June 1, 2011

New Heidelberg Press

Air Pump For Press Secured Storage Area

34

Wiring For Our House Compressed Air

Air Distribution In Room

Hallway Looking Into Laser

Page 35: Bryan dairy progress2

June 3, 2011

Break Room

Front Entrance Accounting Office Getting Carpet

35

Account Services Installation Sound

Proofing The Ceiling

Data Center

Account Services

Page 36: Bryan dairy progress2

June 3, 2011

Voltage converter for new Heidelberg press

Production

36

Hand Room Hand Room

Air Conditioning Into Data Center

High Ceiling In Hand Room

Page 37: Bryan dairy progress2

June 3, 2011

Creative Services Office

Laser Room Pre Press

37

Production Floor Production Floor

Data Production

Page 38: Bryan dairy progress2

June 7, 2011

Visitor Entrance

Front Office Hallway Sales Conference Room

38

Board Room Looking Into Visitor Lobby

Board Room

Data Production

Page 39: Bryan dairy progress2

June 7, 2011

Data Production

Heidelberg Press Ready To Go

President’s Office

39

Laser Room Training Room

Break Room

Page 40: Bryan dairy progress2

June 10, 2011

We have power

Another security camera

40

We have Internet 1st Security Camera Has Been Installed

Page 41: Bryan dairy progress2

June 17, 2011

Data Center

Account Management Production – new press

41

Data Center Break Room

Main Hall way

Page 42: Bryan dairy progress2

June 17, 2011

Production

Wall Furniture is starting to arrive

42

Press Area Receiving

Scissor Lift

Page 43: Bryan dairy progress2

June 20, 2011

Production

Production More furniture

43

Production Production

Mark’s new desk

Page 44: Bryan dairy progress2

June 21, 2011

Forklift charger

Data Center Production

44

North wall Production

Data Center

Page 45: Bryan dairy progress2

June 22, 2011

Cubicles Are Going Up In Account Services

45

Production Floor is Taking Shape!

Page 46: Bryan dairy progress2

June 23, 2011

46

The Data Center is Coming Along! The patch panels in the data center is installed as well as the Verizon FIOS, Cameras,

UPS Unit and security systems….

Page 47: Bryan dairy progress2

June 24, 2011

Production Floor

Cubicles For Account Management

Conference Room A

47

Storage Area On Production Floor

Shipping

Cubicles For Account Management

Page 48: Bryan dairy progress2

June 26, 2011

The Cubicles In Account Management Are Going Up

Furniture Is Being Moved In

48

View from list/IT room looking into bunker/data

center door

Storage Area

Page 49: Bryan dairy progress2

June 26, 2011

Al Is Checking Out The Break Room

More Stuff For The Data Center

49

I Think She Spots A Tree Can Someone Open The Door Please?

Page 50: Bryan dairy progress2

June 29, 2011

View From Break Room

The President Is Getting Settled In His New Office HVAC Work Is Being Done

50

Cubicles Going Up For List/IT room

Page 51: Bryan dairy progress2

July 5, 2011

Reception Area

Production Floor

51

Heidelberg Is Ready To Go

Training Room

Page 52: Bryan dairy progress2

July 14, 2011

The Perfect Temperature

52

Furniture Is Arriving For The Handroom

President’s office at Palmetto office with no

furniture!

Account Management Cubicles Are Done

IT bunker/data center