Allen Engineering Contractor, Inc.Allen Engineering Contractor, Inc.An 8(a), HUB Zone, DBEAn 8(a), HUB Zone, DBE
Design BuildDesign BuildGeneral ContractorGeneral Contractor
Roger Tate, PresidentRoger Tate, President909-478-5500909-478-5500Allenec.ComAllenec.Com
San Diego, CAField Office (1)Field Office (2)Field Office (3)Field Office (4)
Yuma, AZField Office
El Paso, TXField Office
San Bernardino, CACorporate Office
Barstow, CAField Office
Miramar, CAField Office
29 Palms, CAField Office
China Lake, CA Field Office
Lemoore, CA Field Office
AEC Current Office Locations for Support of Work Located in the Western US
Office Locations Throughout the Southwest
Provide a team of highly qualified and experienced personnel with extensive backgrounds in all aspects of horizontal, vertical, waterfront, and utility construction.
Successful partnering and negotiation. Maintain necessary resources to get the job done right. Deliver high quality projects within budget and on schedule.Provide rapid response solutions to emergency or mission critical
situations.Understand that our success depends on your success.
What can Allen Engineering do for you?
`
Bonding CapacityAllen Engineering Contractor, Inc. has 100 Million Dollars in bonding capacity. We are approved on single size projects in the low eight figure range ($15,000,000) with an aggregate backlog in the mid eight figure ($100,000,000) neighborhood.
•Design/Build•Heavy Civil Construction•Medical Facility Renovation•Electrical/Mechanical•Concrete Structures•Demolition•Abatement•Waterfront Construction
•Vertical Construction•Anti-Terrorism/Force Protection•Fire Suppression•Emergency Services•Environmental Restoration•Service & Maintenance•Pre-Engineered Buildings•Tenant Improvements
Experience & Capabilities
Heavy Civil Construction
Design Build Security Upgrades for Main and North Gates, Marine Corps Air Station, Yuma, AZ - – Completed on schedule, zero accidents or safety incidents– Outstanding past performance evaluation
-pop-up barrier installation -new drop arm crash gate
Anti-Terrorism/Force Protection
Design Build 29 Palms Range 500 Range Target, Marine Corps Base, 29 Palms, CA – Completed 70 days ahead of schedule, zero accidents – Outstanding past performance evaluation– Self performed 95% of work scope
Repair Bullion Training Area Access, Marine Corps Air Ground Combat Center, 29 Palms, CA– Completed 18 days ahead of schedule, zero accidents – Outstanding past performance evaluation– Self performed 100% of work scope
-site work in progress -site work in progress
Design Build-Heavy Civil
-paving complete
Design Build Solutions
All Engineering is a leader in green building technology, with a Silver LEED Building Certification
Design
Construction of Marine Corps Reserve Center, Edwards AFB, CA - – Work performed within Flight-line, high security area– On schedule, zero accidents or safety incidents– Customer Letter of Appreciation
Design Build Ground Mobility Support Building, Billy Machen Marine Corps T.C.– Completed 7 days ahead of schedule – Zero accidents or safety incidents– Outstanding performance evaluation
-PEB during construction -finished PEB-Forming Foundation
Design Build Vertical Construction & Pre-Engineered Buildings
11
USACE IDIQ Removal & Disposal of Lead Based Paint, Fort Bliss, TX-$1M
• Hazardous materials abatement• Zero accidents or safety incidents• Multiple simultaneous project locations
-after
-before
Specialized Services: Abatement & Environmental
Installation of Storm Water Runoff Treatment Technology at Navy Regional Recycling Center, San Diego, CA
• Prototype filtration system • Zero accidents or safety incidents• Customer commendation
-completed system
Work with the top 8(a) Hub Zone, DBE company on the West CoastAllen Engineering Contractor, Inc. a proven leader
`
Thank You
www.allenec.com
Contact: Fernando Martinez @ 909-478-5500