Upload
harold-philbrick
View
65.209
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Brief introduction to the 8 Wastes of Lean Manufacturing
Citation preview
Finding the WasteFinding the Waste
The 8 Wastes Workshop
By Harold Philbrick
Objectives
• Understand what waste is• Be able to identify waste on the
shop floor• Generate some ideas on how to
address waste• Change how we see the work
we do
Agenda
• Purpose of Lean Manufacturing• Define value and waste• How is waste created?• Review the 8 types of waste• How we can identify and address
waste• Recap
What is Lean Manufacturing?• The optimization of value in our
process so that we have the ability to make exactly what is needed, when it is needed and in the quantity it is needed by our customer
• The relentless identification and elimination of waste from our process so that we can flow at the rate of customer demand
How Will Lean Help Us?
• Reduce Lead Time to our customers by eliminating waste from our system
• Reduce frustrations by removing barriers to doing our jobs
• Encourage everyone to get involved in improving the process
• Increase customer satisfaction• Optimally utilize resources while
meeting our customer’s needs
What is Value?
• A measurement of the worth of a product, or service, by a customer based on it’s usefulness in satisfying a customer need
• An activity, process or operation that changes the product from one form to another in order to get it closer to the customer’s specifications
• It is something that the customer is willing to pay for
What is Waste?• Any activity that adds costs or time but does
not add value• Consuming more resources (time, money,
space, etc) than are necessary to produce the goods, or services, that the customer wants
• Pure Waste: Actions that could be stopped without effecting the customer
• Incidental Waste: Actions that need to be done based on how the current system operates but do not add value
50%40%
10%
Pure Waste
IncidentalWasteValue
The 8 Types of Waste
OverproductionInventoryTransportationMotion (Operations)ProcessingDefects / QualityWaitingPeople’s Skills
Overproduction
• Common causes:– Producing more than is required to
make up for yield loss– Scheduling production to forecasted
demand– Long changeovers or avoiding
changeovers lead to large lot production
• Supplying the process with more than is needed to meet order requirements, sooner and faster than it is needed, causes almost all other types of waste
• This is the worst waste of all, because it helps cause all the others
Inventory
• Common causes:– Overproduction– Poor equipment layout– Long changeover times– Defective, or questionable, parts– Mismatched production speeds
• Requires people, equipment and space to count, transport, store and maintain it
• If we do not get orders the material will become obsolete, and be thrown away
• Inventory is often used to help hide other wastes
Inventory Hides Waste
Sea of Inventory
Long Transportation
CommunicationProblems
MachineDowntime
EmployeeAvailability
Poor Scheduling
QualityProblems
LineImbalance
LongSetups
Supplierissues
HouseKeeping
EmployeeAvailability
Finished Goods
Raw Materials
Reducing Inventory Uncovers Opportunities to Improve,
Opportunities That Must Be Addressed!
Poor Scheduling
LongSetups
Long Transportation
CommunicationProblems
MachineDowntime
EmployeeAvailability
QualityProblems
LineImbalance
Supplierissues
HouseKeeping
EmployeeAvailability
Transportation
• Common causes:– Extra Inventory
– Retention points before and after operations
– Excessive distance between operations (layout)
– Single skill focused operations
• Double or triple handling, moving in and out of storage areas and warehouses
• Material can get damaged if it’s moved too much• It adds no value and is often used to get the extra
inventory out of the way
Motion (Operators)
• Common causes:– Poor workstation layout– Isolated operations– Shared tools– Fatigue– Workstation congestion
• Walking without working (away from workstation) • Searching for tools, materials or information• Reaching, bending or unnecessary motion due to
poor housekeeping or workplace layout• Process is not designed with employees in mind
Processing
• Common causes:– Lack of standard work or
processes– Equipment over designed– Process not updated with
technology changes– Lack of effective problem solving
• Doing more than is necessary to produce an effectively functioning product
• Extra setup steps, over-specification of the process, extra processing steps
Defects / Quality
• Common causes:– Emphasis on downstream
inspection; questionable material passed on
– Lack of standard work
– Material handling (transportation)
– Process design/equipment
• Defective or scrap materials• Cost of inspecting defects• Responding to customer complaints• Rework or re-inspection of questionable materials
Waiting
• Common causes:– Mismatched production rates
– Poor layout
– Machine breakdowns• Ours or upstream
– Insufficiently staffed
• Operator waiting for machines to run or cycle• Machine waiting for operator• Waiting for parts, instructions, approval,
information, maintenance, decisions…
People’s Skills
• Common causes:– Management does not involve
employees in problem solving– Narrowly defined jobs and
expectations– Old school management,
worker relationships
• Employees are seen as a source of labor only, not seen as true process experts
• People are told what to do, and asked not to think• Employees are not involved in finding solutions,
opportunities to improve our process are missed
How Does Waste Get There? • Forget to change solutions when we change
the process
• Fail to understand why we do something a certain way, so we continue doing that way even if the limitation has been removed
• Build it into our processes
• Root cause of problems is not addressed or a band aid solution is implemented
How Can We Find It? • Find the value added work, everything else
is waste
• Go out there and see it– Observe our processes as if you do not know it– Talk to the operators so you can understand
why we do things the way we do• What is the operation about? Why is it necessary?
• Spaghetti diagrams– Map the flow of materials on a plant layout– Identify storage points, transportation, etc
How Can We Find It? • Introduce it
– Implement one piece flow into the process and waste will rise to the surface
• Have the right attitude– Waste is hard enough to find when you want to
find it, if we don’t want to find waste it will be impossible to root it out and remove it
Waste – the simpler part…
Being Able to See IT!(once we know what it is)
The Real Challenge …
knowing how to properlyremove it!
How Do We Remove It? • All of the lean tools are designed to remove
and identify waste
• 5S
• Standard Work
• Quick Changeovers
• Mistake Proofing
• Kanban
• One Piece Flow
• Kaizens
RECAP
Value-Added Activities Transforms or shapes material or information Customer wants it Done right the first time
Incidental Waste No value created but required by current technology
No value created but required by current thinking
No value created but required by process limitations
No value created but required by current process
Pure Waste Consume resources but creates no value for the customer Could be stopped and it would be invisible to the customer
Value Defined
What is Lean Manufacturing?
• The optimization of value in our process so that we have the ability to make exactly what is needed, when it is needed, in the quantity it is needed by our customer
• The relentless identification and elimination of waste from our process so that we can flow at the rate of customer demand
Attitude is Critical
“If you think you can or you think you can’t, you’re right.” Henry Ford