Finding the Waste Finding the Waste The 8 Wastes Workshop By Harold Philbrick

8 Wastes

Embed Size (px)

DESCRIPTION

Brief introduction to the 8 Wastes of Lean Manufacturing

Citation preview

Page 1: 8 Wastes

Finding the WasteFinding the Waste

The 8 Wastes Workshop

By Harold Philbrick

Page 2: 8 Wastes

Objectives

• Understand what waste is• Be able to identify waste on the

shop floor• Generate some ideas on how to

address waste• Change how we see the work

we do

Page 3: 8 Wastes

Agenda

• Purpose of Lean Manufacturing• Define value and waste• How is waste created?• Review the 8 types of waste• How we can identify and address

waste• Recap

Page 4: 8 Wastes

What is Lean Manufacturing?• The optimization of value in our

process so that we have the ability to make exactly what is needed, when it is needed and in the quantity it is needed by our customer

• The relentless identification and elimination of waste from our process so that we can flow at the rate of customer demand

Page 5: 8 Wastes

How Will Lean Help Us?

• Reduce Lead Time to our customers by eliminating waste from our system

• Reduce frustrations by removing barriers to doing our jobs

• Encourage everyone to get involved in improving the process

• Increase customer satisfaction• Optimally utilize resources while

meeting our customer’s needs

Page 6: 8 Wastes

What is Value?

• A measurement of the worth of a product, or service, by a customer based on it’s usefulness in satisfying a customer need

• An activity, process or operation that changes the product from one form to another in order to get it closer to the customer’s specifications

• It is something that the customer is willing to pay for

Page 7: 8 Wastes

What is Waste?• Any activity that adds costs or time but does

not add value• Consuming more resources (time, money,

space, etc) than are necessary to produce the goods, or services, that the customer wants

• Pure Waste: Actions that could be stopped without effecting the customer

• Incidental Waste: Actions that need to be done based on how the current system operates but do not add value

Page 8: 8 Wastes

50%40%

10%

Pure Waste

IncidentalWasteValue

Page 9: 8 Wastes

The 8 Types of Waste

OverproductionInventoryTransportationMotion (Operations)ProcessingDefects / QualityWaitingPeople’s Skills

Page 10: 8 Wastes

Overproduction

• Common causes:– Producing more than is required to

make up for yield loss– Scheduling production to forecasted

demand– Long changeovers or avoiding

changeovers lead to large lot production

• Supplying the process with more than is needed to meet order requirements, sooner and faster than it is needed, causes almost all other types of waste

• This is the worst waste of all, because it helps cause all the others

Page 11: 8 Wastes

Inventory

• Common causes:– Overproduction– Poor equipment layout– Long changeover times– Defective, or questionable, parts– Mismatched production speeds

• Requires people, equipment and space to count, transport, store and maintain it

• If we do not get orders the material will become obsolete, and be thrown away

• Inventory is often used to help hide other wastes

Page 12: 8 Wastes

Inventory Hides Waste

Sea of Inventory

Long Transportation

CommunicationProblems

MachineDowntime

EmployeeAvailability

Poor Scheduling

QualityProblems

LineImbalance

LongSetups

Supplierissues

HouseKeeping

EmployeeAvailability

Finished Goods

Raw Materials

Page 13: 8 Wastes

Reducing Inventory Uncovers Opportunities to Improve,

Opportunities That Must Be Addressed!

Poor Scheduling

LongSetups

Long Transportation

CommunicationProblems

MachineDowntime

EmployeeAvailability

QualityProblems

LineImbalance

Supplierissues

HouseKeeping

EmployeeAvailability

Page 14: 8 Wastes

Transportation

• Common causes:– Extra Inventory

– Retention points before and after operations

– Excessive distance between operations (layout)

– Single skill focused operations

• Double or triple handling, moving in and out of storage areas and warehouses

• Material can get damaged if it’s moved too much• It adds no value and is often used to get the extra

inventory out of the way

Page 15: 8 Wastes

Motion (Operators)

• Common causes:– Poor workstation layout– Isolated operations– Shared tools– Fatigue– Workstation congestion

• Walking without working (away from workstation) • Searching for tools, materials or information• Reaching, bending or unnecessary motion due to

poor housekeeping or workplace layout• Process is not designed with employees in mind

Page 16: 8 Wastes

Processing

• Common causes:– Lack of standard work or

processes– Equipment over designed– Process not updated with

technology changes– Lack of effective problem solving

• Doing more than is necessary to produce an effectively functioning product

• Extra setup steps, over-specification of the process, extra processing steps

Page 17: 8 Wastes

Defects / Quality

• Common causes:– Emphasis on downstream

inspection; questionable material passed on

– Lack of standard work

– Material handling (transportation)

– Process design/equipment

• Defective or scrap materials• Cost of inspecting defects• Responding to customer complaints• Rework or re-inspection of questionable materials

Page 18: 8 Wastes

Waiting

• Common causes:– Mismatched production rates

– Poor layout

– Machine breakdowns• Ours or upstream

– Insufficiently staffed

• Operator waiting for machines to run or cycle• Machine waiting for operator• Waiting for parts, instructions, approval,

information, maintenance, decisions…

Page 19: 8 Wastes

People’s Skills

• Common causes:– Management does not involve

employees in problem solving– Narrowly defined jobs and

expectations– Old school management,

worker relationships

• Employees are seen as a source of labor only, not seen as true process experts

• People are told what to do, and asked not to think• Employees are not involved in finding solutions,

opportunities to improve our process are missed

Page 20: 8 Wastes

How Does Waste Get There? • Forget to change solutions when we change

the process

• Fail to understand why we do something a certain way, so we continue doing that way even if the limitation has been removed

• Build it into our processes

• Root cause of problems is not addressed or a band aid solution is implemented

Page 21: 8 Wastes

How Can We Find It? • Find the value added work, everything else

is waste

• Go out there and see it– Observe our processes as if you do not know it– Talk to the operators so you can understand

why we do things the way we do• What is the operation about? Why is it necessary?

• Spaghetti diagrams– Map the flow of materials on a plant layout– Identify storage points, transportation, etc

Page 22: 8 Wastes

How Can We Find It? • Introduce it

– Implement one piece flow into the process and waste will rise to the surface

• Have the right attitude– Waste is hard enough to find when you want to

find it, if we don’t want to find waste it will be impossible to root it out and remove it

Page 23: 8 Wastes

Waste – the simpler part…

Being Able to See IT!(once we know what it is)

The Real Challenge …

knowing how to properlyremove it!

Page 24: 8 Wastes

How Do We Remove It? • All of the lean tools are designed to remove

and identify waste

• 5S

• Standard Work

• Quick Changeovers

• Mistake Proofing

• Kanban

• One Piece Flow

• Kaizens

Page 25: 8 Wastes

RECAP

Page 26: 8 Wastes

Value-Added Activities Transforms or shapes material or information Customer wants it Done right the first time

Incidental Waste No value created but required by current technology

No value created but required by current thinking

No value created but required by process limitations

No value created but required by current process

Pure Waste Consume resources but creates no value for the customer Could be stopped and it would be invisible to the customer

Value Defined

Page 27: 8 Wastes

What is Lean Manufacturing?

• The optimization of value in our process so that we have the ability to make exactly what is needed, when it is needed, in the quantity it is needed by our customer

• The relentless identification and elimination of waste from our process so that we can flow at the rate of customer demand

Page 28: 8 Wastes

Attitude is Critical

“If you think you can or you think you can’t, you’re right.” Henry Ford