UNDP BRC

GREENING OF THE OFFICE

EXPERIENCE & LESSON LEARNED

Page 2: 6 miroslav hrenovcik undp brc greening activity

Five pillars of BRC Greening activities

1. Reducing of consumption• Renovation of building (insulation, new windows, saving water taps, etc.)• Green purchase (low consumption equipment, re-chargeable batteries, saving bulbs,

etc.)• Lower consumption of resources by staff (green workshops, double side printing,

turning off electricity devices when out of office, etc.)

2. Recycling• Paper, printer cartridges, plastics, glass, batteries

3. Awareness raising• Green months, tree planting, biodiversity saving activities, nature trips,

competitions, newsletter

4. Offsetting • Income from roof solar panels used for offsetting CO2 emissions of the staff trips

5. Green strategy with measures / senior management support• BRC greening strategy 2011-2013

Page 3: 6 miroslav hrenovcik undp brc greening activity

Results on consumption in BRC

BRC electricity consumption - by types of equipment

Page 4: 6 miroslav hrenovcik undp brc greening activity

1. week

6. – 10. June 2011.NO ELAVATOR USE

Take the stairs instead of the lift.

3. week

20. – 24. June 2011SUPPORT GREEN CONSUMPTION

Bring bio / organic product for theTerrace BRC Organic Party!!!!

2. week

13. – 17. June 2011.NO CARS

Leave your car at home when coming to and from the office. Use bus, bike, or walk…

4. week

27. – 30. June 2011NO PLASTIC BOTTLES and PLASTIC BAGSAvoid buying a single drink in a plastic bottle or

taking plastic bags from stores

Raising awareness: BRC Green month

Page 5: 6 miroslav hrenovcik undp brc greening activity

Survey on the activities (2001) 78 responses

Page 6: 6 miroslav hrenovcik undp brc greening activity

BRC spreading the experience (A):

Implementation of solar systems generating electricity from the sun:

1. UNDP BRC installation of 10.20kWpi grid connected solar system

2. UNDPACT Cyprus evaluation report for installation of 15.kWpi system :http://www.undp-act.org/default.aspx?tabid=155&it=0&mid=0&itemid=0&langid=1

3. Technical assistance to UNDP Tajikistan with procurement and installation of 10 kWpi solar panel power station.4. UNDP South Sudan, UNDP Ethiopia, UNDP HAITI, UNDP Eritrea, UNDP Benin

Page 7: 6 miroslav hrenovcik undp brc greening activity

BRC spreading the experience (B):

Greening UNDP Offices:

1. UNDP RBC Green Team Member2. UNDP Tajikistan3. UNDP South Sudan4. UNDP Ethiopia

Page 8: 6 miroslav hrenovcik undp brc greening activity

Experience:

1. In many CO there is a little attention regarding utilities consumption in both metric units as well as in $

2. “The more electricity we consume its better for our power generator…, I was told”

3. In many COs I visited there is a little attention paid to preservation of environment UN staff is working in

However if the right motivation is in place, enthusiastic colleagues are involved, you have the support of the senior management,you use the experience of the early movers, this can make the change

Page 9: 6 miroslav hrenovcik undp brc greening activity

QUESTIONS ?

Miroslav [email protected]