Page 1: Pacific Northwest National Labs - Electric Vehicle Projects

November 11, 2013

Electric Vehicle Adaption: EV Projects at PNNL

PETER CHRISTENSEN Manager, Technology Commercialization

PNNL-SA-99291

Page 2: Pacific Northwest National Labs - Electric Vehicle Projects

Pacific Northwest National Laboratory

! Offices located across the state ! Collaborators across government,

industry, academia working to solve client challenges

! U.S. Department of Energy’s top-performing laboratory for 5 years

FY12 Facts ! $1B in R&D expenditures ! More than 4,400 staff ! 2000+ users & visiting

scientists ! 1,041 peer-reviewed

publications ! 44 patents & 176 inventions

2

Page 3: Pacific Northwest National Labs - Electric Vehicle Projects

Expanding campus, growing capabilities

Page 4: Pacific Northwest National Labs - Electric Vehicle Projects

EIOC @ PNNL

Electric Infrastructure Operations Center

Page 5: Pacific Northwest National Labs - Electric Vehicle Projects

Today’s Grid can supply 70% of our daily driving energy

Summary u  Midwest:

support almost the entire LDV fleet

u  East: somewhat smaller potential

u  West: supports fewer vehicles

% figures denote the percentage of LDV fleet supported by idle electric capacity

Nighttime Charging

Only (hrs 18 – 6)

Daytime + Nighttime Charging (0 – 24 hrs)

NWP

AZN & RMP

CNV

18% 10%

66% 39%

23% 15%

80%

45%

52% 31%

57% 34%

ERCOT

100%

73% SPP SERC

MAIN ECAR

127%

73%

78% 46%

NPCC(US)

86% 49%

MAPP

105%

57% 104%

61%

Page 6: Pacific Northwest National Labs - Electric Vehicle Projects

Increased Sales of Electricity from PHEVs Produce Downward Pressure on Electricity Rates*

Utility Cost of Service, By Element of Cost

Fixed Distribution, $12.54

Fixed Power Supply, $23.66 Fixed Power Supply,

$21.43

Variable Power Supply, $15.80

Variable Power Supply, $15.84

Fixed Distribution, $14.25

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

BEFORE AFTER

Cincinnati Gas and Electric Cincinnati Gas and Electric

Dol

lars

per

MW

h

Variable Distribution

Fixed Distribution

VariableTransmission

Fixed Transmission

Variable PowerSupply

Fixed Power Supply

$54.26 $50.2

7

kWh Produced

Cincinnati Gas & Electric Costs/MWh with PHEV Valley Filling

Increased sales

MW Capacity, Capital Investment Same

infrastructure, same capital investment

+

= $/kWh

Lower electricity

rates Before After

Before After

Before After

* analyzes of Cincinnati Gas & Electric and San Diego Gas & Electric

Page 7: Pacific Northwest National Labs - Electric Vehicle Projects

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

01234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

Perfect Valley Filling ECAR Summer Load Profile

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

16 18 20 22 24 2 4 6 8 10 12 14

Hour

MW

Numbers of Charging Cars

-1234

16 18 20 22 24 2 4 6 8 10 12 14

Mill

ions

of c

ars

Hour

Charge each PHEV: 1.4 kW charge (120V, 12A) for 7 hours=10 kWh

0

Page 8: Pacific Northwest National Labs - Electric Vehicle Projects

PNNL Grid-Friendly Charger Controller

! With communications as part of the AGC control !   Provision of regulation services to minimize ACE !   Requires high update rates via SCADA network

! Without communications !   Based on frequency deviations from nominal AC frequency

!   Provision of frequency bias portion of ACE !   Extremely low-cost

Page 9: Pacific Northwest National Labs - Electric Vehicle Projects

Secondary Transformer Loading (Selected Utilities in PNW)

PHEV Charge Profile (EPRI)

0

0.2

0.4

0.6

0.8

1

1.2

1 3 5 7 9 11 13 15 17 19 21 23

Hour

kW

PHEV Charge Profile (Quick Charging)

0

2

4

6

8

10

1 3 5 7 9 11 13 15 17 19 21 23Hour

kW

Transformer Loaded Capacity for Various PHEV PenetrationsEPRI Charging Profile

0%

10%

20%

30%

40%

50%

60%

0% 20%

40%

60%

80%

100%

120%

140%

160%

180%

200%

>200

%

Percent Loaded Capacity

Per

cent

age

of T

rans

form

ers

Base Load50% Penetration100% Penetration200% Penetration

Transformer Loaded Capacity for Various PHEV Penetrations240V Quick Charge Charging Profile

0%

10%

20%

30%

40%

50%

60%

0% 20%

40%

60%

80%

100%

120%

140%

160%

180%

200%

>200

%

Percent Loaded Capacity

Per

cent

age

of T

rans

form

ers

Base Load50% Penetration100% Penetration200% Penetration

Page 10: Pacific Northwest National Labs - Electric Vehicle Projects

Emissions intensity (ton CO2/MWh) impacts. Only from electricity generation

10

NWP

AZN&RMP

CNV

NPCC(US)(US)

!   Regions with clean generation (CNV, NWP) will likely increase emissions intensity because vehicle load is met with fossil generation

!   Midwestern regions (ECAR, MAIN, MAPP, etc.) show a slight reduction because of the additional natural gas generation

Emissions results present mixed message: •  for some not much difference between day- and night-charging •  for others lower emissions at night because of higher efficiency of

combined cycle versus combustion turbine plants

A4: home, A5: home and work (day), A6: home after 22:00 (night)

-­‐ 2.0% -­‐ 1.0% 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% 8.0% 9.0%

Change  in    CO2  intensity  

A4

A5

A6 -­‐2.0%

-­‐1.0%

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

8.0%

9.0%

Change  in    CO2  intensity

 

A4

A5

A6

Page 11: Pacific Northwest National Labs - Electric Vehicle Projects

November 11, 2013 11

Ben Franklin Transit all-electric bus

Page 12: Pacific Northwest National Labs - Electric Vehicle Projects

November 11, 2013 12

Ben Franklin Transit all-electric bus

Diesel  Bus  Cost:    425K  

100-­‐150  mi/day  $37,700/yr  fuel  1.03¢/mi  all  in  

Electric  Bus  Cost:    525K  120  mi/day  

$2,400/yr  fuel  0.007¢/mi  all  in  

VS

Page 13: Pacific Northwest National Labs - Electric Vehicle Projects

V2G½: Load can provide regulation services

13

V2G •  provides regulation

service as a load and generator

•  requires charging and discharging according to grid operators signal

Max. charging (7.2 kW = 240V*30A)

Max. discharging (-7.2 kW)

char

ging

di

scha

rgin

g

Capacity value (-7.2 to 7.2=14.4kW)

Max. charging (7.2 kW)

Attribute of “V2G½”: •  provides regulation service with ½ the capacity value of V2G •  however, less than half the cost because

•  no interconnection gear with grid necessary because no electricity goes back into grid •  removes any uncertainties regarding battery life reduction because of extra cycling

Max. discharging (-7.2 kW)

char

ging

di

scha

rgin

g

Capacity value (0 to 7.2=7.2 kW)

V2G½ •  provides regulation

service as a load only •  requires only charging •  modulates charging Never discharge !

Page 14: Pacific Northwest National Labs - Electric Vehicle Projects

Frequency regulation with smart loads (EVs and water heaters)

November 11, 2013 14

Page 15: Pacific Northwest National Labs - Electric Vehicle Projects

November 11, 2013 15

Doing Business with PNNL

CRADA

•  Cost share with DOE

•  Option to exclusive rights to foreground IP

WFO

•  Fund research

•  Keep the IP

•  With strings

ACT

•  Fund research

•  Negotiate IP

•  Fewer strings

Direct Licensing of Existing IP

•  Patents and

technologies available for licensing

Page 16: Pacific Northwest National Labs - Electric Vehicle Projects

Availabletechnologies.pnnl.gov

Page 17: Pacific Northwest National Labs - Electric Vehicle Projects

Questions?